TxDOT contract A00065080 bid tabulation

Bridge Replacement, FM 4 (AT WEAVER BRANCH to .). Let by Texas DOT on June 4, 2025, Hood, Fort Worth District. 7 bids received; low bid $2,382,295 by STX Civil, -11% against the engineer's estimate of $2,673,092.

Owner
Texas DOT
Letting
04 JUN 2025
Pay items
98
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1STX Civil$2,382,295Low-11%
2Talbert Companies LLC$2,879,977+21%+8.0%
3Texas Steel Industrial Placing, LLC$3,094,888+30%+16%
4C. E. Barker, LTD.$3,179,978+33%+19%
5Urban Infraconstruction LLC$3,180,000+33%+19%
6Coppell Construction Co., Inc.$3,186,926+34%+19%
7Hodges and Son Construction Company, Inc.$3,241,068+36%+21%
TxDOT contract A00065080: bids by rank

Engineer's estimate: $2,673,092.

Bid tabulation

LinePay itemUnitQuantityEstimate1. STX Civil2. Talbert Companies LLC3. Texas Steel Industrial Placing, LLC4. C. E. Barker, LTD.5. Urban Infraconstruction LLC6. Coppell Construction Co., Inc.
1Preparing row (100-7002)STA9$7,500.00$3,500.00$2,618.00$6,500.00$35,000$20,000$15,000
2Removing concrete (driveways) (104-7011)SY65$30.00$20.00$44.00$50.00$21.53$30.96$41.00
3Remove (2"-8") TRT/untrt base & asphalt pavement (105-7053)SY3,939$9.00$8.00$2.09$8.00$6.72$8.00$12.00
4Excavation (roadway) (110-7001)CY276$30.00$30.00$42.57$50.00$39.38$65.00$50.00
5Excavation (channel) (110-7002)CY352$30.00$35.00$126.50$60.00$39.38$51.00$29.00
6Embankment (final)(DC)(type B) (132-7004)CY6,428$50.00$35.00$38.50$25.00$30.19$52.00$30.00
7Blading (150-7002)HR40$160.00$100.00$174.89$125.00$110.25$335.00$300.00
8Compost manuf topsoil (4") (161-7002)SY7,911$3.00$3.00$1.67$9.00$4.73$2.00$5.50
9Broadcast seed (permanent_urban_clay) (164-7004)SY7,911$1.00$1.00$0.29$0.50$1.05$0.31$0.50
10Broadcast seed (temporary_warm) (164-7005)SY7,911$1.00$1.00$0.20$0.50$2.10$0.75$0.42
11Vegetative watering (168-7001)TGL554$26.00$50.00$112.21$10.00$73.50$120.00$10.00
12Soil ret BLKT(SL_mod_clay_short) (169-7001)SY6,337$2.00$1.50$2.48$2.00$5.25$2.00$1.10
13Proof rolling (216-7001)HR40$456.00$105.00$127.78$150.00$110.25$415.00$100.00
14FL BS (compacted in place)(type A GR 1-2) (6") (247-7044)SY3,439$25.00$25.00$33.00$35.00$84.11$40.00$80.00
15Salvage, haul & stockpile reclaimed asphalt PV(2"-15.6") (305-7042)SY3,939$7.00$10.00$5.67$35.00$13.81$22.00$7.50
16Prime coat (RC-250) (310-7006)GAL757$40.00$25.00$15.40$25.00$21.00$15.00$14.00
17D-GR HMA type-B PG64-22 (341-7001)TON1,126$150.00$175.00$154.00$150.00$183.75$165.00$140.00
18SP mixes SP-C sac-A PG70-28 (344-7024)TON365$220.00$250.00$206.80$200.00$194.25$220.00$188.00
19Tack coat (344-7077)GAL636$4.50$10.00$2.75$6.00$10.50$3.00$2.50
20Cem stabil BKFL (400-7010)CY164$300.00$220.00$275.00$225.00$137.03$210.00$390.00
21Trench excavation protection (402-7001)LF468$11.00$15.00$11.00$20.00$26.51$24.00$8.25
22Drilled shaft (18 in) (416-7002)LF136$190.00$220.00$214.50$300.00$329.41$235.00$140.00
23Drilled shaft (36 in) (416-7006)LF272$320.00$270.00$335.50$400.00$440.96$352.00$350.00
24Class C concrete (abutment)(HPC) (420-7013)CY50.40$1,580.00$1,200.00$1,320.00$2,500.00$1,576.54$2,500.00$1,500.00
25Reinforced concrete slab (HPC) (422-7002)SF3,060$32.00$28.00$33.00$45.00$25.54$34.00$37.00
26Approach slab (422-7013)CY51.40$900.00$750.00$1,012.00$900.00$784.47$1,035.00$900.00
27Retaining wall (temporary wall) (423-7012)SF1,958$25.00$25.00$38.50$45.00$33.60$49.00$35.00
28Prestressed concrete girder (TX40) (425-7003)LF447.36$205.00$300.00$197.27$395.00$326.30$275.00$325.00
29Riprap (mow strip)(4 in) (432-7013)CY29.60$725.00$675.00$823.38$800.00$588.00$1,150.00$800.00
30Riprap (stone protection)(24 in) (432-7045)CY1,295$190.00$190.00$169.58$200.00$194.78$145.00$250.00
31Rail (type SSTR)(HPC) (450-7025)LF240$120.00$170.00$275.00$200.00$154.73$295.00$225.00
32Armor joint (sealed) (454-7003)LF60$175.00$150.00$195.18$175.00$118.13$335.00$210.00
33RC pipe (CL III)(24 in) (464-7005)LF37$140.00$130.00$182.47$125.00$170.44$171.00$120.00
34RC pipe (CL III)(42 in) (464-7010)LF54$250.00$200.00$256.55$300.00$260.53$295.00$300.00
35RC pipe (CL III)(48 in) (464-7011)LF281$280.00$300.00$398.21$325.00$288.92$325.00$325.00
36Inlet (complete)(pazd)(RC)(5FTX5FT) (465-7154)EACH2$10,500$6,000.00$7,304.00$7,500.00$6,851.25$8,500.00$8,500.00
37Headwall (CH - PW - S) (diameter= 48 in) (466-7122)EACH1$1,600.00$18,000$18,645$15,000$22,050$35,000$23,000
38Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH2$2,000.00$1,800.00$1,944.25$2,500.00$1,850.63$2,500.00$2,400.00
39Set (type II) (42 in) (RCP) (6: 1) (P) (467-7380)EACH1$3,500.00$7,000.00$10,021$5,000.00$2,900.63$9,500.00$9,500.00
40Removing structure (set) (496-7004)EACH2$900.00$100.00$877.25$2,000.00$220.50$1,200.00$875.00
41Removing structure (headwall) (496-7006)EACH4$1,200.00$500.00$1,705.00$2,500.00$1,378.13$2,100.00$1,600.00
42Removing structure (pipe) (496-7007)LF157$30.00$10.00$46.75$20.00$22.05$36.00$26.00
43Removing structure (bridge 0 - 99 FT length) (496-7009)EACH1$50,000$25,000$28,050$48,000$31,500$115,000$100,000
44Mobilization (500-7001)LS1$234,827$180,000$395,378$309,000$280,000$142,359$300,000
45Barricades, signs and traffic handling (502-7001)MO9$10,000$3,000.00$10,450$4,500.00$3,029.25$10,000$14,000
46Portable changeable message sign (503-7002)EACH2$10,000$7,500.00$13,287$20,000$21,000$20,000$15,000
47TMA (stationary) (505-7001)DAY2$210.00$400.00$410.67$300.00$1,050.00$1,000.00$300.00
48TMA (mobile operation) (505-7002)HR16$100.00$200.00$165.00$50.00$262.50$1,200.00$250.00
49Rock filter dams (install) (type 1) (506-7001)LF24$50.00$109.00$50.24$50.00$105.00$115.00$50.00
50Rock filter dams (remove) (506-7011)LF24$20.00$25.00$20.91$30.00$52.50$58.00$25.00
51Construction exits (install) (type 1) (506-7020)SY78$40.00$30.00$49.57$55.00$31.50$45.00$45.00
52Construction exits (remove) (506-7024)SY78$15.00$10.00$21.10$25.00$10.50$15.00$15.00
53Temporary sediment control fence (install) (506-7039)LF893$5.00$4.00$4.54$5.00$5.25$5.00$4.00
54Temporary sediment control fence (remove) (506-7041)LF893$1.00$2.00$1.25$2.00$2.10$1.00$1.50
55Constructing detours (508-7001)SY357$130.00$200.00$237.05$200.00$170.26$155.00$230.00
56One-way traffic control (flagger cont) (510-7001)HR24$70.00$65.00$38.50$150.00$157.50$405.00$250.00
57One-way traffic control (port traffic signal) (510-7003)MO8$7,000.00$4,000.00$7,988.75$9,000.00$7,875.00$5,225.00$7,500.00
58Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005)LF90$52.00$65.00$88.00$90.00$72.71$85.00$80.00
59Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009)LF860$60.00$45.00$88.00$90.00$82.16$85.00$80.00
60Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010)LF40$65.00$10.00$88.00$90.00$80.06$85.00$80.00
61Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033)LF760$22.00$15.00$11.00$30.00$10.76$10.00$10.00
62Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034)LF40$25.00$15.00$11.00$30.00$10.76$30.00$10.00
63Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053)LF90$18.00$15.00$44.00$30.00$10.76$15.00$40.00
64Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057)LF860$22.00$15.00$19.80$30.00$10.76$22.00$18.00
65Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058)LF40$25.00$15.00$19.80$30.00$10.76$22.00$18.00
66Portable concrete traffic barrier(fur & install)(F-shape)(type T) (512-7066)LF20$120.00$25.00$198.00$90.00$170.36$85.00$180.00
67Portable concrete traffic barrier(remove)(F-shape)(type T) (512-7069)LF20$56.00$15.00$55.00$30.00$10.76$13.00$50.00
68Driveways (concrete) (530-7006)SY59$126.00$120.00$99.00$120.00$120.23$140.00$110.00
69Driveways (ACP) (530-7010)SY927$80.00$65.00$58.30$60.00$29.40$45.00$40.00
70Metal W-beam guard fence (timber post) (540-7001)LF175$28.00$25.00$27.50$35.00$36.75$30.00$25.00
71Metal beam guard fence trans (thrie-beam) (540-7005)EACH4$2,000.00$2,100.00$2,090.00$2,350.00$2,625.00$2,235.00$1,900.00
72Remove metal beam guard fence (542-7001)LF500$4.50$2.00$3.03$5.00$5.25$3.00$2.75
73Remove terminal anchor section (542-7002)EACH3$300.00$400.00$165.00$300.00$262.50$175.00$150.00
74Guardrail end treatment (install) (544-7001)EACH4$3,200.00$3,500.00$3,165.25$3,500.00$3,675.00$3,500.00$2,900.00
75Guardrail end treatment (remove) (544-7003)EACH1$300.00$350.00$275.00$350.00$262.50$295.00$250.00
76Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH11$900.00$840.00$797.50$900.00$813.75$1,000.00$630.00
77Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002)EACH1$900.00$1,050.00$830.50$1,000.00$1,018.50$1,000.00$935.00
78Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH1$1,200.00$1,060.00$1,358.50$1,150.00$1,123.50$1,000.00$855.00
79Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034)EACH1$1,200.00$1,550.00$1,952.50$1,500.00$1,501.50$1,000.00$1,255.00
80Remove SM RD SN sup&AM (644-7073)EACH15$175.00$140.00$108.90$150.00$141.75$295.00$115.00
81Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH6$33.00$25.00$17.60$50.00$23.63$17.00$33.00
82Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH6$33.00$28.00$27.50$50.00$27.83$17.00$38.00
83Install object marker assembly (OM-2Y)(WC)GND (658-7056)EACH4$75.00$119.00$55.00$150.00$110.25$55.00$130.00
84Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059)EACH2$50.00$124.00$49.50$150.00$120.75$53.00$130.00
85Work zone pavement marking removing (reflectorized) type II-A-A (662-7051)EACH20$5.10$6.00$5.50$10.00$4.84$8.00$7.50
86Work zone pavement marking removing (W)6"(solid) (662-7068)LF4,737$1.60$1.50$2.15$2.00$1.58$1.75$1.50
87Work zone pavement marking removing (W)24"(solid) (662-7077)LF34$12.00$15.00$7.70$15.00$27.30$15.00$13.00
88Work zone pavement marking removing (Y)6"(solid) (662-7100)LF800$1.60$1.25$2.15$2.00$2.00$1.75$1.50
89Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF32$10.00$10.00$9.90$15.00$3.00$15.00$13.00
90Pavement sler 6" (666-7347)LF2,744$0.50$0.50$0.55$1.00$4.00$0.60$0.50
91Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410)LF1,084$1.00$1.00$1.71$2.00$1.00$1.75$1.50
92Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF1,974$1.00$1.10$1.71$2.00$1.00$1.75$1.50
93Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422)LF1,084$1.00$1.00$1.71$2.00$1.00$1.75$1.50
94Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF1,822$1.00$1.15$1.71$2.00$1.00$1.77$1.50
95Reflectorized pavement marker type II-A-A (672-7004)EACH29$6.00$6.00$7.21$12.00$20.00$10.00$10.00
96Eliminating existing PM & markers (4") (677-7001)LF2,006$1.00$1.25$1.98$2.00$1.00$2.00$1.75
97Pavement surface preparation for marking (6") (678-7002)LF5,964$0.50$0.25$0.28$0.50$1.00$0.35$0.30
98Pavement surface preparation for marking (24") (678-7008)LF32$1.00$2.00$0.94$20.00$1.00$3.50$3.00
TxDOT contract A00065080: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of June 4, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy