TxDOT contract A00207303 bid tabulation
Construct Pedestrian Infrastructure, Various (Spur 503 to Loy Lake Rd). Let by Texas DOT on March 5, 2026, Grayson, Paris District. 11 bids received; low bid $2,744,602 by Scout 5 Construction LLC, -7.5% against the engineer's estimate of $2,967,039.
- Owner
- Texas DOT
- Letting
- 05 MAR 2026
- Pay items
- 68
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scout 5 Construction LLC | $2,744,602 | Low | -7.0% |
| 2 | STX Civil | $2,763,804 | +1.0% | -7.0% |
| 3 | Texas Steel Industrial Placing, LLC | $2,827,011 | +3.0% | -5.0% |
| 4 | Garret Shields Infrastructure | $2,877,672 | +5.0% | -3.0% |
| 5 | Skyline Bridge LLC | $2,896,712 | +6.0% | -2.0% |
| 6 | Highway 19 Construction LLC | $2,965,581 | +8.0% | 0.0% |
| 7 | Pace Construction Services LLC | $3,084,026 | +12% | +4.0% |
| 8 | Talbert Companies LLC | $3,159,690 | +15% | +6.0% |
| 9 | Hodges and Son Construction Company, Inc. | $3,200,555 | +17% | +8.0% |
| 10 | Ed Bell Construction Company | $4,284,536 | +56% | +44% |
| 11 | Built Right Construction of Oklahoma, LLC | $5,498,727 | +100% | +85% |
Engineer's estimate: $2,967,039.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Scout 5 Construction LLC | 2. STX Civil | 3. Texas Steel Industrial Placing, LLC | 4. Garret Shields Infrastructure | 5. Skyline Bridge LLC | 6. Highway 19 Construction LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 67.20 | $1,000.00 | $5,000.00 | $350.00 | $1,000.00 | $600.00 | $500.00 | $2,500.00 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 105 | $40.00 | $50.00 | $10.00 | $40.00 | $40.00 | $75.00 | $35.00 |
| 3 | Excavation (roadway) (110-7001) | CY | 2,870 | $18.60 | $33.00 | $20.00 | $21.00 | $25.00 | $18.00 | $10.00 |
| 4 | Embankment (final)(OC)(type A) (132-7001) | CY | 2,890 | $20.00 | $33.00 | $40.00 | $30.00 | $35.00 | $32.00 | $15.00 |
| 5 | Block sodding (162-7002) | SY | 14,467 | $5.07 | $6.00 | $4.75 | $4.00 | $7.00 | $6.31 | $4.00 |
| 6 | Fertilizer (166-7001) | ACRE | 3 | $565.13 | $313.00 | $500.00 | $800.00 | $400.00 | $275.00 | $850.00 |
| 7 | Vegetative watering (168-7001) | TGL | 505 | $22.38 | $11.50 | $50.00 | $25.00 | $20.00 | $1.00 | $30.00 |
| 8 | Rdside amenity (trash/recycle bin) (194-7004) | EACH | 3 | $750.00 | $1,000.00 | $900.00 | $769.00 | $1,000.00 | $985.00 | $1,500.00 |
| 9 | Rdside amenity (bench) (194-7005) | EACH | 1 | $2,000.00 | $2,500.00 | $2,200.00 | $1,955.00 | $1,000.00 | $2,350.00 | $2,500.00 |
| 10 | Lime (com or QK)(slurry) (260-7005) | TON | 132 | $300.00 | $401.00 | $500.00 | $320.00 | $350.00 | $375.00 | $350.00 |
| 11 | Lime TRT (existing material & new base)(6") (260-7010) | SY | 10,562 | $10.00 | $3.25 | $8.00 | $10.00 | $8.00 | $7.75 | $7.00 |
| 12 | Struct excavation (pipe) (400-7003) | CY | 337 | $4.52 | $2.00 | $20.00 | $20.00 | $20.00 | $30.00 | $30.00 |
| 13 | Cem stabil BKFL (400-7010) | CY | 36 | $222.90 | $200.00 | $250.00 | $250.00 | $200.00 | $300.00 | $250.00 |
| 14 | Drilled shaft (36 in) (416-7006) | LF | 236 | $296.60 | $400.00 | $380.00 | $385.46 | $350.00 | $282.92 | $350.00 |
| 15 | Class C concrete (abutment) (420-7012) | CY | 36.40 | $1,145.60 | $465.00 | $1,300.00 | $1,400.00 | $1,000.00 | $1,002.90 | $1,600.00 |
| 16 | Reinforced concrete slab (422-7001) | SF | 2,002 | $30.00 | $26.00 | $26.00 | $40.00 | $30.00 | $242.16 | $33.00 |
| 17 | Approach slab (422-7013) | CY | 8.40 | $922.00 | $454.00 | $900.00 | $750.00 | $1,200.00 | $1,315.03 | $1,000.00 |
| 18 | Riprap (stone protection)(12 in) (432-7041) | CY | 18 | $243.06 | $160.00 | $180.00 | $200.00 | $200.00 | $150.00 | $180.00 |
| 19 | Riprap (stone protection)(18 in) (432-7043) | CY | 126 | $188.71 | $160.00 | $200.00 | $200.00 | $200.00 | $125.00 | $180.00 |
| 20 | Elastomeric bearing (laminated) (434-7002) | EACH | 4 | $1,690.24 | $4,650.00 | $4,500.00 | $6,400.00 | $4,000.00 | $1,500.00 | $5,000.00 |
| 21 | STR steel (miscellaneous bridge) (442-7008) | LB | 402 | $15.90 | $18.50 | $16.00 | $14.15 | $16.00 | $12.00 | $35.00 |
| 22 | Clean & paint existing STR (system II) (446-7002) | LS | 1 | $215,400 | $352,000 | $280,000 | $247,350 | $275,000 | $278,269 | $250,000 |
| 23 | Rail (type PR11) (450-7044) | LF | 240 | $119.40 | $115.00 | $155.00 | $144.24 | $150.00 | $172.65 | $180.00 |
| 24 | Rail (handrail)(type F) (450-7063) | LF | 1,926 | $170.00 | $135.00 | $155.00 | $144.24 | $120.00 | $167.84 | $180.00 |
| 25 | RC pipe (CL III)(12 in) (464-7001) | LF | 198 | $55.10 | $37.00 | $80.00 | $75.00 | $80.00 | $47.50 | $44.00 |
| 26 | RC pipe (CL III)(18 in) (464-7003) | LF | 190 | $57.61 | $39.00 | $90.00 | $80.00 | $80.00 | $54.50 | $55.00 |
| 27 | RC pipe (CL III)(24 in) (464-7005) | LF | 34 | $92.60 | $46.00 | $110.00 | $100.00 | $150.00 | $77.50 | $73.00 |
| 28 | Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126) | EACH | 6 | $7,250.00 | $3,042.00 | $6,000.00 | $6,000.00 | $6,000.00 | $5,500.00 | $6,500.00 |
| 29 | Inlet (complete)(PSL)(FG)(4FTX4FT-4FTX4FT) (465-7128) | EACH | 1 | $10,075 | $4,374.50 | $7,500.00 | $7,000.00 | $8,000.00 | $6,800.00 | $7,500.00 |
| 30 | Set (type II) (12 in) (RCP) (3: 1) (C) (467-7289) | EACH | 3 | $1,880.30 | $546.00 | $800.00 | $1,000.00 | $1,000.00 | $675.00 | $585.00 |
| 31 | Set (type II) (12 in) (RCP) (6: 1) (C) (467-7291) | EACH | 2 | $1,880.30 | $546.00 | $1,000.00 | $1,200.00 | $1,000.00 | $675.00 | $585.00 |
| 32 | Set (type II) (18 in) (RCP) (3: 1) (C) (467-7305) | EACH | 3 | $800.00 | $547.00 | $1,000.00 | $1,000.00 | $1,000.00 | $675.00 | $585.00 |
| 33 | Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307) | EACH | 2 | $800.00 | $850.00 | $1,200.00 | $1,500.00 | $1,500.00 | $775.00 | $795.00 |
| 34 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 1 | $1,500.00 | $720.00 | $1,300.00 | $1,500.00 | $1,500.00 | $1,105.00 | $905.00 |
| 35 | Treat timber (491-7001) | MBF | 10 | $4,095.00 | $3,500.00 | $500.00 | $5,000.00 | $3,500.00 | $3,650.54 | $10,000 |
| 36 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 1 | $25,000 | $12,000 | $15,000 | $30,000 | $90,000 | $25,000 | $50,000 |
| 37 | Mobilization (500-7001) | LS | 1 | $257,004 | $300,000 | $216,000 | $277,858 | $200,000 | $225,000 | $290,000 |
| 38 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $2,000.00 | $1,200.00 | $1,800.00 | $2,775.00 | $4,000.00 | $2,400.00 | $2,000.00 |
| 39 | Temporary sediment control fence (install) (506-7039) | LF | 13,270 | $4.69 | $7.00 | $4.00 | $3.70 | $4.00 | $3.70 | $4.00 |
| 40 | Temporary SDMT cont fence (inlet protection) (506-7040) | LF | 70 | $1.87 | $7.00 | $4.00 | $6.00 | $5.00 | $10.00 | $10.00 |
| 41 | Temporary sediment control fence (remove) (506-7041) | LF | 13,270 | $1.44 | $4.00 | $0.10 | $1.00 | $1.00 | $1.00 | $1.00 |
| 42 | Biodegradable erosion control logs (install) (6") (506-7042) | LF | 175 | $2.13 | $2.50 | $5.00 | $4.00 | $5.00 | $8.00 | $5.00 |
| 43 | Concrete sidewalks (6") (531-7003) | SY | 8,977 | $108.00 | $44.00 | $90.00 | $75.00 | $80.00 | $54.41 | $87.00 |
| 44 | Curb ramps (type 1) (531-7005) | EACH | 6 | $2,386.01 | $752.50 | $1,200.00 | $2,500.00 | $2,500.00 | $2,000.00 | $1,500.00 |
| 45 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 6 | $1,089.59 | $483.50 | $800.00 | $650.00 | $800.00 | $725.00 | $750.00 |
| 46 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 1 | $951.45 | $320.50 | $450.00 | $500.00 | $500.00 | $600.00 | $600.00 |
| 47 | Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035) | LF | 242 | $17.22 | $8.50 | $9.00 | $7.05 | $8.00 | $9.00 | $8.00 |
| 48 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 16 | $375.00 | $194.00 | $225.00 | $200.00 | $230.00 | $260.00 | $220.00 |
| 49 | Reflectorized pavement marking type I(W)(bike syml)(100MIL) (666-7099) | EACH | 6 | $390.48 | $325.00 | $260.00 | $252.00 | $300.00 | $300.00 | $250.00 |
| 50 | Reflectorized pavement marking type I (Y)4"(DOT)(090MIL) (666-7107) | LF | 6,185 | $1.20 | $1.25 | $1.25 | $1.55 | $1.80 | $1.45 | $1.20 |
| 51 | Reflectorized profile pavement marking type I(W)4"(solid)(090MIL) (666-7263) | LF | 12,956 | $1.47 | $1.25 | $1.10 | $1.25 | $1.50 | $1.19 | $1.00 |
| 52 | Reflectorized profile pavement marking type I(Y)4"(solid)(090MIL) (666-7267) | LF | 387 | $1.64 | $1.50 | $1.00 | $1.25 | $1.50 | $1.19 | $1.00 |
| 53 | Pavement sler 4" (666-7346) | LF | 19,528 | $0.86 | $1.50 | $0.25 | $0.14 | $0.20 | $0.27 | $0.20 |
| 54 | Pavement sler 24" (666-7352) | LF | 242 | $3.96 | $1.50 | $3.10 | $1.45 | $1.70 | $5.00 | $1.00 |
| 55 | Pavement sler (word) (666-7354) | EACH | 16 | $115.28 | $32.50 | $126.00 | $34.00 | $40.00 | $150.00 | $1.00 |
| 56 | Pavement sler (bike symbol) (666-7369) | EACH | 6 | $113.19 | $26.00 | $110.00 | $28.00 | $32.00 | $120.00 | $1.00 |
| 57 | Pavement surface preparation for marking (6") (678-7002) | LF | 19,528 | $0.81 | $1.50 | $0.15 | $0.02 | $0.05 | $0.17 | $0.20 |
| 58 | Pavement surface preparation for marking (24") (678-7008) | LF | 242 | $11.66 | $1.50 | $2.10 | $0.50 | $0.60 | $2.50 | $2.00 |
| 59 | Pavement surface preparation for marking (word) (678-7016) | EACH | 16 | $60.44 | $19.00 | $110.00 | $14.25 | $16.00 | $121.00 | $100.00 |
| 60 | Pavement surface preparation for marking (bike symbol) (678-7028) | EACH | 6 | $71.07 | $16.00 | $60.00 | $12.25 | $15.00 | $64.00 | $50.00 |
| 61 | Install RDSD FLSH BCN assembly (solar PWRD) (685-7004) | EACH | 6 | $7,498.40 | $616.25 | $9,500.00 | $8,500.00 | $14,000 | $10,240 | $9,000.00 |
| 62 | Post and cable fence (new concrete anchor) (772-7004) | EACH | 18 | $156.71 | $162.50 | $200.00 | $200.00 | $200.00 | $500.00 | $180.00 |
| 63 | Rep steel bridge member (truss vertical) (784-7004) | EACH | 1 | $500.00 | $1,560.00 | $6,000.00 | $600.00 | $1,000.00 | $900.00 | $2,000.00 |
| 64 | Rep steel bridge member (batten plate) (784-7013) | EACH | 2 | $4,562.50 | $2,080.00 | $1,200.00 | $1,000.00 | $1,000.00 | $1,400.00 | $1,500.00 |
| 65 | Rep steel bridge member (floorbeam) (784-7016) | EACH | 1 | $500.00 | $2,080.00 | $1,200.00 | $1,000.00 | $1,000.00 | $1,400.00 | $3,500.00 |
| 66 | Rep steel bridge member(repl rivet/bolt) (784-7024) | EACH | 121 | $143.38 | $266.50 | $220.00 | $200.00 | $100.00 | $241.00 | $5.00 |
| 67 | Relocate existing truss bridge (4005-7001) | LS | 1 | $60,000 | $25,000 | $50,000 | $150,000 | $160,000 | $70,000 | $40,000 |
| 68 | Shade structure (4064-7001) | EACH | 1 | $30,000 | $50,000 | $30,000 | $30,000 | $60,000 | $25,000 | $50,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 5, 2026. Compiled by Mirage Metrics.