TxDOT contract A00134679 bid tabulation
Bridge Replacement, HOPKINS RD (Hopkins Rd (CR 209) at Turkey Creek to .). Let by Texas DOT on February 4, 2026, Fort Bend, Houston District. 13 bids received; low bid $2,787,245 by Trevway, Inc., -18% against the engineer's estimate of $3,404,519.
- Owner
- Texas DOT
- Letting
- 04 FEB 2026
- Pay items
- 61
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Trevway, Inc. | $2,787,245 | Low | -18% |
| 2 | R Construction Civil, LLC | $2,855,406 | +2.0% | -16% |
| 3 | Jfo Services, LLC | $3,064,221 | +10% | -10% |
| 4 | Tucan Contracting, LLC | $3,160,833 | +13% | -7.0% |
| 5 | Skyline Bridge LLC | $3,324,398 | +19% | -2.0% |
| 6 | Castillo Aranda LLC | $3,352,615 | +20% | -2.0% |
| 7 | Talbert Companies LLC | $3,372,646 | +21% | -1.0% |
| 8 | MC2 Civil, LLC | $3,673,463 | +32% | +8.0% |
| 9 | Isi Contracting, Inc. | $3,698,470 | +33% | +9.0% |
| 10 | John Reed and Company, LLC | $3,777,572 | +36% | +11% |
| 11 | Garret Shields Infrastructure | $3,933,511 | +41% | +16% |
| 12 | Hodges and Son Construction Company, Inc. | $3,967,590 | +42% | +17% |
| 13 | C. E. Barker, LTD. | $3,985,800 | +43% | +17% |
Engineer's estimate: $3,404,519.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Trevway, Inc. | 2. R Construction Civil, LLC | 3. Jfo Services, LLC | 4. Tucan Contracting, LLC | 5. Skyline Bridge LLC | 6. Castillo Aranda LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 14.15 | $4,500.00 | $1,500.00 | $2,500.00 | $2,662.36 | $1,650.00 | $3,000.00 | $9,000.00 |
| 2 | Remove (0"-12") TRT/untrt base & asphalt pavement (105-7052) | SY | 3,047 | $5.50 | $9.00 | $9.00 | $7.74 | $22.00 | $14.00 | $10.00 |
| 3 | Excavation (roadway) (110-7001) | CY | 2,191 | $10.00 | $7.00 | $19.00 | $17.17 | $27.50 | $18.00 | $15.00 |
| 4 | Embankment (final)(DC)(type C) (132-7006) | CY | 1,174 | $10.00 | $15.00 | $21.00 | $19.13 | $27.50 | $40.00 | $20.00 |
| 5 | Furn & place topsoil (4") (160-7002) | SY | 2,812 | $1.50 | $4.00 | $9.00 | $3.37 | $3.30 | $3.75 | $5.00 |
| 6 | Drill seed (permanent_rural_clay) (164-7010) | SY | 2,812 | $0.20 | $0.76 | $2.00 | $0.34 | $0.35 | $2.50 | $1.00 |
| 7 | Vegetative watering (168-7001) | TGL | 140 | $40.00 | $11.16 | $250.00 | $43.64 | $30.80 | $1.00 | $50.00 |
| 8 | Lime (com or QK)(slurry) or QK(dry) (260-7001) | TON | 61 | $360.00 | $442.11 | $350.00 | $391.83 | $374.00 | $375.00 | $350.00 |
| 9 | Lime TRT (existing material)(8") (260-7007) | SY | 3,376 | $7.00 | $9.00 | $6.00 | $16.02 | $11.00 | $20.00 | $7.00 |
| 10 | Asphalt TRT base (GR 2)(PG 64) (292-7006) | TON | 1,486 | $135.00 | $290.53 | $170.00 | $141.73 | $181.50 | $135.00 | $250.00 |
| 11 | Prime coat (AE-P) (310-7001) | GAL | 844 | $4.70 | $15.16 | $12.00 | $9.57 | $5.50 | $20.00 | $10.00 |
| 12 | D-GR HMA type D sac-B PG70-22 (341-7050) | TON | 540 | $130.00 | $337.54 | $190.00 | $187.38 | $249.70 | $325.00 | $260.00 |
| 13 | Tack coat (341-7082) | GAL | 197 | $4.50 | $27.79 | $17.00 | $8.86 | $5.50 | $5.00 | $10.00 |
| 14 | Cem stabil BKFL (400-7010) | CY | 804.40 | $125.00 | $141.00 | $70.00 | $43.41 | $176.00 | $275.00 | $105.00 |
| 15 | Temporary special shoring (403-7001) | SF | 708 | $25.00 | $1.00 | $97.00 | $112.40 | $16.50 | $32.00 | $55.00 |
| 16 | Drilled shaft (18 in) (416-7002) | LF | 80 | $180.00 | $104.72 | $160.00 | $138.76 | $88.00 | $125.00 | $275.00 |
| 17 | Drilled shaft (36 in) (416-7006) | LF | 1,080 | $310.00 | $278.44 | $415.00 | $286.77 | $275.00 | $310.00 | $425.00 |
| 18 | Class C concrete (abutment) (420-7012) | CY | 171.60 | $1,400.00 | $830.00 | $600.00 | $971.45 | $1,210.00 | $1,200.00 | $1,300.00 |
| 19 | Reinforced concrete slab (422-7001) | SF | 6,450 | $25.00 | $22.50 | $24.00 | $50.93 | $27.50 | $28.00 | $27.00 |
| 20 | Approach slab (422-7013) | CY | 106.80 | $365.19 | $850.00 | $590.93 | $935.00 | $850.00 | $600.00 | |
| 21 | Prestressed concrete girder (TX28) (425-7001) | LF | 851.48 | $250.00 | $263.26 | $205.00 | $292.05 | $220.00 | $275.00 | $300.00 |
| 22 | Riprap (concrete)(5 in) (432-7002) | CY | 417.80 | $550.00 | $250.00 | $700.00 | $414.03 | $660.00 | $625.00 | $450.00 |
| 23 | Riprap (mow strip)(4 in) (432-7013) | CY | 61.80 | $600.00 | $460.64 | $500.00 | $751.23 | $715.00 | $750.00 | $450.00 |
| 24 | Rail (type T223) (450-7008) | LF | 630 | $180.00 | $112.00 | $215.00 | $202.80 | $187.00 | $165.00 | $185.00 |
| 25 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 240 | $225.00 | $170.00 | $180.00 | $234.05 | $198.00 | $225.00 | $180.00 |
| 26 | Set (type II) (18 in) (TP) (6: 1) (P) (467-7312) | EACH | 2 | $1,965.00 | $1,750.00 | $1,926.43 | $1,650.00 | $1,500.00 | $2,500.00 | |
| 27 | Set (type II) (24 in) (TP) (6: 1) (P) (467-7332) | EACH | 14 | $2,800.00 | $1,788.00 | $2,250.00 | $2,336.70 | $2,420.00 | $1,600.00 | $3,500.00 |
| 28 | Set (type II) (30 in) (TP) (6: 1) (P) (467-7352) | EACH | 3 | $3,725.00 | $3,000.00 | $3,946.31 | $3,850.00 | $3,500.00 | $4,500.00 | |
| 29 | Set (type II) (36 in) (TP) (6: 1) (P) (467-7372) | EACH | 6 | $8,349.68 | $5,600.00 | $6,439.32 | $5,500.00 | $6,500.00 | $5,000.00 | |
| 30 | Thermoplastic pipe (PP) (18") (468-7001) | LF | 27 | $73.27 | $98.00 | $130.61 | $60.50 | $55.00 | $30.00 | |
| 31 | Thermoplastic pipe (PP) (24") (468-7002) | LF | 422 | $80.00 | $78.00 | $67.00 | $74.02 | $88.00 | $71.00 | $50.00 |
| 32 | Thermoplastic pipe (PP) (30") (468-7003) | LF | 221 | $131.00 | $96.00 | $86.90 | $121.00 | $98.00 | $75.00 | |
| 33 | Thermoplastic pipe (PP) (36") (468-7004) | LF | 238 | $109.00 | $116.00 | $113.48 | $165.00 | $112.00 | $90.00 | |
| 34 | Removing structure (pipe) (496-7007) | LF | 753 | $35.00 | $25.00 | $17.00 | $15.70 | $13.20 | $10.00 | $10.00 |
| 35 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 2 | $25,000 | $21,000 | $16,860 | $11,000 | $15,000 | $55,000 | |
| 36 | Mobilization (500-7001) | LS | 1 | $309,894 | $280,000 | $50,000 | $298,146 | $250,000 | $300,000 | $200,000 |
| 37 | Barricades, signs and traffic handling (502-7001) | MO | 40 | $12,000 | $1,136.00 | $2,000.00 | $722.74 | $2,200.00 | $2,800.00 | $2,500.00 |
| 38 | Portable changeable message sign (503-7001) | DAY | 112 | $110.00 | $88.00 | $360.00 | $84.30 | $132.00 | $68.00 | $100.00 |
| 39 | Rock filter dams (install) (type 3) (506-7003) | LF | 473 | $90.00 | $4.00 | $8.00 | $78.68 | $77.00 | $50.00 | $25.00 |
| 40 | Rock filter dams (remove) (506-7011) | LF | 473 | $15.00 | $0.10 | $10.00 | $22.48 | $22.00 | $10.00 | $5.00 |
| 41 | Temporary sediment control fence (install) (506-7039) | LF | 2,663 | $3.90 | $3.00 | $4.00 | $3.65 | $3.58 | $3.80 | $5.00 |
| 42 | Temporary sediment control fence (remove) (506-7041) | LF | 2,663 | $1.20 | $0.10 | $1.00 | $1.68 | $1.65 | $1.00 | $1.00 |
| 43 | Driveways (ACP) (530-7010) | SY | 504 | $65.00 | $35.00 | $117.00 | $115.63 | $97.90 | $80.00 | $55.00 |
| 44 | Metal W-beam guard fence (timber post) (540-7001) | LF | 396 | $27.00 | $28.85 | $25.00 | $28.10 | $29.70 | $26.00 | $32.00 |
| 45 | Metal beam guard fence trans (TL2) (540-7006) | EACH | 14 | $1,500.00 | $1,203.13 | $1,300.00 | $1,601.71 | $1,320.00 | $1,400.00 | $1,950.00 |
| 46 | Downstream anchor terminal section (540-7015) | EACH | 3 | $1,814.04 | $1,500.00 | $1,714.11 | $1,320.00 | $1,500.00 | $1,500.00 | |
| 47 | TL-2 31" short radius (W/O dat) (540-7037) | EACH | 3 | $15,387 | $15,000 | $18,546 | $15,950 | $17,000 | $18,500 | |
| 48 | Remove terminal anchor section (542-7002) | EACH | 2 | $631.05 | $200.00 | $247.29 | $330.00 | $500.00 | $500.00 | |
| 49 | Guardrail end treatment (install) (544-7001) | EACH | 11 | $3,500.00 | $3,056.00 | $3,400.00 | $3,372.02 | $3,520.00 | $3,400.00 | $3,650.00 |
| 50 | Crash cushion attenuator (install)(R)(N)(TL2) (545-7009) | EACH | 2 | $19,578 | $16,000 | $22,986 | $23,100 | $17,500 | $20,500 | |
| 51 | Wire fence (type A) (552-7001) | LF | 118 | $19.54 | $32.00 | $33.44 | $44.00 | $28.00 | $15.00 | |
| 52 | Wire fence (remove) (552-7011) | LF | 132 | $5.00 | $1.00 | $12.00 | $12.36 | $7.70 | $10.00 | $5.00 |
| 53 | Relocate existing mailbox (560-7012) | EACH | 4 | $500.00 | $420.00 | $314.72 | $220.00 | $250.00 | $300.00 | |
| 54 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 9 | $650.00 | $807.00 | $1,300.00 | $843.00 | $594.00 | $1,000.00 | $710.00 |
| 55 | Remove SM RD SN sup&AM (644-7073) | EACH | 12 | $110.00 | $13.03 | $85.00 | $168.60 | $82.50 | $150.00 | $85.00 |
| 56 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 9 | $35.00 | $6.32 | $19.00 | $32.04 | $22.00 | $30.00 | $35.00 |
| 57 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 15 | $35.00 | $13.89 | $30.00 | $39.34 | $38.50 | $35.00 | $40.00 |
| 58 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 2,830 | $0.35 | $1.20 | $2.00 | $4.01 | $3.93 | $3.50 | $3.00 |
| 59 | Reflectorized pavement marking type II (Y) 6" (broken) (666-7211) | LF | 270 | $0.35 | $1.26 | $2.00 | $4.01 | $3.93 | $5.00 | $3.00 |
| 60 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 700 | $1.26 | $2.00 | $4.01 | $3.93 | $5.00 | $4.00 | |
| 61 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 24 | $5.00 | $10.11 | $15.00 | $11.24 | $11.00 | $50.00 | $15.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.