TxDOT contract A00184233 bid tabulation
Traffic Signal Improvements, SS 326 (Intersection of SS0326 to and Erskine). Let by Texas DOT on August 8, 2025, Lubbock, Lubbock District. 4 bids received; low bid $519,269 by Apollo Constructors, Inc., -6.8% against the engineer's estimate of $557,394.
- Owner
- Texas DOT
- Letting
- 08 AUG 2025
- Pay items
- 53
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Apollo Constructors, Inc. | $519,269 | Low | -7.0% |
| 2 | Vaca Underground Utilities Inc | $593,537 | +14% | +6.0% |
| 3 | WG Engineering & Construction, LLC | $719,001 | +38% | +29% |
| 4 | Lone Star Dirt & Paving, LTD. | $737,010 | +42% | +32% |
Engineer's estimate: $557,394.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Apollo Constructors, Inc. | 2. Vaca Underground Utilities Inc | 3. WG Engineering & Construction, LLC | 4. Lone Star Dirt & Paving, LTD. |
|---|---|---|---|---|---|---|---|---|
| 1 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 30 | $427.50 | $425.00 | $500.00 | $685.00 | $468.00 |
| 2 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 44 | $712.50 | $525.00 | $750.00 | $975.00 | $514.80 |
| 3 | Mobilization (500-7001) | LS | 1 | $51,000 | $50,000 | $55,000 | $78,621 | $70,000 |
| 4 | Barricades, signs and traffic handling (502-7001) | MO | 4 | $4,750.00 | $3,500.00 | $5,000.00 | $7,628.00 | $10,000 |
| 5 | Portable changeable message sign (503-7001) | DAY | 152 | $95.00 | $175.00 | $50.00 | $128.00 | $200.00 |
| 6 | TMA (stationary) (505-7001) | DAY | 76 | $190.00 | $100.00 | $50.00 | $420.00 | $500.00 |
| 7 | Sandbags for erosion control (506-7035) | EACH | 4 | $47.50 | $25.00 | $500.00 | $28.00 | $100.00 |
| 8 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 30 | $7.60 | $6.35 | $50.00 | $15.00 | $50.00 |
| 9 | Biodegradable erosion control logs (remove) (506-7046) | LF | 30 | $1.90 | $1.55 | $50.00 | $9.00 | $20.00 |
| 10 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 860 | $20.90 | $22.50 | $20.00 | $24.00 | $14.89 |
| 11 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 1,095 | $28.50 | $38.00 | $25.00 | $32.00 | $43.54 |
| 12 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 125 | $38.00 | $45.00 | $25.00 | $30.00 | $22.66 |
| 13 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 525 | $42.75 | $50.00 | $30.00 | $44.00 | $63.05 |
| 14 | Electrical conductor (no.6) bare (620-7009) | LF | 1,645 | $2.52 | $2.50 | $3.50 | $4.00 | $3.42 |
| 15 | Electrical conductor (no.2) insulated (620-7016) | LF | 105 | $5.70 | $3.50 | $5.25 | $5.50 | $12.84 |
| 16 | Ground box type A (122311)W/apron (624-7002) | EACH | 3 | $2,327.50 | $1,459.00 | $2,000.00 | $1,520.00 | $1,857.38 |
| 17 | Ground box type D (162922)W/apron (624-7008) | EACH | 9 | $2,612.50 | $1,850.00 | $2,000.00 | $2,652.00 | $2,106.00 |
| 18 | Remove ground box (624-7013) | EACH | 4 | $665.00 | $350.00 | $1,200.00 | $465.00 | $585.00 |
| 19 | Remove electrical services (628-7002) | EACH | 1 | $1,425.00 | $900.00 | $1,000.00 | $998.00 | $292.50 |
| 20 | Elc SRV type D 120/240 060(NS)SS(N)SP(O) (628-7156) | EACH | 1 | $11,400 | $8,525.00 | $9,500.00 | $9,852.00 | $8,775.00 |
| 21 | Aluminum signs (type A) (636-7001) | SF | 278.50 | $33.25 | $35.00 | $50.00 | $52.00 | $50.00 |
| 22 | Install small roadside sign support and assembly TYS80(1)SB(P-BM) (644-7038) | EACH | 8 | $1,140.00 | $1,859.00 | $1,600.00 | $1,500.00 | $2,000.00 |
| 23 | Remove SM RD SN sup&AM (644-7073) | EACH | 2 | $152.00 | $350.00 | $300.00 | $300.00 | $1,500.00 |
| 24 | Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132) | EACH | 6 | $475.00 | $500.00 | $625.00 | $325.00 | $650.00 |
| 25 | Prefabricated PM type C (W)(8")(DOT) (668-7082) | LF | 551 | $19.00 | $8.50 | $10.50 | $10.00 | $11.05 |
| 26 | Prefabricated PM type C (W)(8")(solid) (668-7084) | LF | 1,155 | $6.89 | $7.75 | $10.00 | $8.00 | $10.08 |
| 27 | Prefabricated PM type C (W)(12")(solid) (668-7087) | LF | 197 | $7.36 | $12.00 | $15.00 | $10.00 | $15.60 |
| 28 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 217 | $16.63 | $17.50 | $21.25 | $14.00 | $22.75 |
| 29 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 10 | $270.75 | $275.00 | $340.00 | $580.00 | $357.50 |
| 30 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 4 | $332.50 | $375.00 | $500.00 | $665.00 | $487.50 |
| 31 | Eliminating existing PM & markers (6") (677-7002) | LF | 500 | $4.75 | $2.75 | $3.50 | $2.20 | $3.58 |
| 32 | Eliminating existing PM & markers (8") (677-7004) | LF | 385 | $5.23 | $3.00 | $3.75 | $3.00 | $3.90 |
| 33 | Eliminating existing PM & markers (24") (677-7008) | LF | 210 | $5.70 | $5.50 | $4.25 | $135.00 | $7.15 |
| 34 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 6 | $6.18 | $150.00 | $200.00 | $146.00 | $195.00 |
| 35 | Install highway traffic signal (isolated) (680-7002) | EACH | 1 | $47,500 | $28,000 | $80,000 | $56,550 | $17,550 |
| 36 | Removing traffic signals (680-7004) | EACH | 1 | $11,400 | $7,500.00 | $15,000 | $12,008 | $32,240 |
| 37 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 12 | $380.00 | $375.25 | $500.00 | $472.00 | $502.13 |
| 38 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 6 | $380.00 | $375.25 | $500.00 | $472.00 | $531.38 |
| 39 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 18 | $380.00 | $375.25 | $500.00 | $472.00 | $502.13 |
| 40 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 10 | $380.00 | $375.25 | $500.00 | $472.00 | $502.13 |
| 41 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 12 | $380.00 | $375.25 | $500.00 | $472.00 | $502.13 |
| 42 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 4 | $380.00 | $375.25 | $500.00 | $472.00 | $531.38 |
| 43 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 10 | $237.50 | $225.00 | $250.00 | $325.00 | $359.58 |
| 44 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 4 | $318.25 | $250.00 | $275.00 | $280.00 | $438.75 |
| 45 | Backplate W/ref border(5 sec)(vent)aluminum (682-7044) | EACH | 2 | $332.50 | $300.00 | $300.00 | $398.00 | $445.58 |
| 46 | Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010) | LF | 440 | $3.61 | $3.95 | $4.50 | $3.00 | $5.47 |
| 47 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 1,405 | $4.56 | $4.15 | $5.00 | $4.50 | $7.20 |
| 48 | Traffic signal CBL (type A)(12 AWG)(20 conductor) (684-7025) | LF | 850 | $6.18 | $7.45 | $12.00 | $11.00 | $19.76 |
| 49 | Install RDSD flash beacon assembly (685-7001) | EACH | 3 | $5,700.00 | $4,500.00 | $10,000 | $10,454 | $7,137.00 |
| 50 | Ins traffic signal PL AM(S)1 arm(44') (686-7045) | EACH | 2 | $16,150 | $16,250 | $17,000 | $21,605 | $29,577 |
| 51 | Ins traffic signal PL AM(S)1 arm(50') (686-7053) | EACH | 1 | $38,000 | $35,000 | $30,000 | $33,605 | $51,747 |
| 52 | Ins traffic signal PL AM(S)1 arm(55') (686-7057) | EACH | 1 | $40,375 | $37,500 | $32,000 | $35,961 | $53,433 |
| 53 | Install of cables (690-7011) | LF | 1,505 | $2.85 | $2.49 | $2.00 | $7.00 | $2.34 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.