Allen Butler Construction, Inc.: TxDOT bid record
Allen Butler Construction, Inc. submitted 14 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 02 NOV 2022, and was the low bidder on 6 of them (43%). When it was not low, its total sat a median +22% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $165,442,962
- Latest bid
- 02 NOV 2022
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 8 | 3 | 38% |
| 2021 | 3 | 2 | 67% |
| 2022 | 3 | 1 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Lubbock District | 5 | 3 | 60% |
| Amarillo District | 4 | 3 | 75% |
| Abilene District | 3 | 0 | 0% |
| Odessa District | 1 | 0 | 0% |
| San Angelo District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 14 | 6 (43%) | $4,677.00 | $5,000.00 |
| Cem stabil BKFL | 400-7010 | CY | 11 | 4 (36%) | $147.53 | $200.00 |
| Prime coat (MC-30) | 310-7004 | GAL | 11 | 4 (36%) | $4.75 | $6.42 |
| Riprap (concrete)(5 in) | 432-7002 | CY | 8 | 4 (50%) | $572.00 | $640.65 |
| Removing concrete (pavement) | 104-6001 | SY | 6 | 4 (67%) | $11.38 | $16.61 |
| TMA (stationary) | 505-7001 | DAY | 13 | 3 (23%) | $195.00 | $230.00 |
| Construction exits (remove) | 506-7024 | SY | 11 | 3 (27%) | $12.40 | $10.00 |
| Excavation (roadway) | 110-7001 | CY | 10 | 3 (30%) | $11.10 | $20.00 |
| Clean existing culverts | 480-7001 | EACH | 8 | 3 (38%) | $2,424.12 | $2,500.00 |
| Ground box type A (122311)W/apron | 624-7002 | EACH | 8 | 3 (38%) | $846.12 | $1,271.50 |
| Drilled shaft (roadway illumination pole) (30 in) | 416-7040 | LF | 8 | 3 (38%) | $191.90 | $280.00 |
| Removing structure (pipe) | 496-7007 | LF | 7 | 3 (43%) | $17.50 | $24.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Gilvin-Terrill, LTD. | 6 | 4 of 6 |
| A. L. Helmcamp, Inc. | 4 | 2 of 4 |
| Duininck, Inc. | 4 | 0 of 4 |
| FNF Construction, Inc. | 3 | 1 of 3 |
| Johnson Bros. Corporation, A Southland Company | 3 | 1 of 3 |
| J. Lee Milligan, Inc. | 3 | 1 of 3 |
| J. H. Strain & Sons, Inc. | 2 | 2 of 2 |
| Webber, LLC | 2 | 0 of 2 |
| Altus Construction LLC | 2 | 0 of 2 |
| Kiewit Infrastructure South Co. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 NOV 2022 | 11223008 | Lubbock District | US 84 Infrastructure improvements from US 82 to IH 27 | 2 of 2 | $13,771,978 | +39% |
| 30 JUN 2022 | 06223613 | Lubbock District | CS Construct new roadway lanes from 114TH ST. AT QUAKER AVE to INDIANA AVE | 1 of 3 | $12,797,068 | Low, 9.0% under the second |
| 04 FEB 2022 | 02223226 | Amarillo District | RM 1061 Highway improvement from RM 2381 to N COULTER STREET | 5 of 5 | $15,020,633 | +18% |
| 05 AUG 2021 | 08213209 | Lubbock District | US 87 Construct bridge from 0.5 MI NORTH OF FM 41 to 0.5 MI SOUTH OF FM 41 | 1 of 5 | $21,657,409 | Low, 1.0% under the second |
| 02 JUL 2021 | 07213207 | Abilene District | FM 1785 Widen road - add shoulders from US 87 to BORDEN CO LINE | 6 of 6 | $12,223,040 | +38% |
| 06 MAY 2021 | 05213202 | Amarillo District | IH 27 Highway improvement from 0.58 MILES SOUTH OF 45TH AVE to IH 40 | 1 of 3 | $30,998,613 | Low, 11% under the second |
| 02 DEC 2020 | 12203003 | Amarillo District | SL 335 Construct new road from FM 2590 to WEST OF COULTER | 1 of 4 | $25,974,527 | Low, 26% under the second |
| 05 NOV 2020 | 11203201 | San Angelo District | US 83 Add passing lanes from TAYLOR COUNTY LINE to US 67 | 4 of 8 | $29,636,216 | +21% |
| 05 NOV 2020 | 11203216 | Abilene District | US 83 Bridge replacement & approaches from DOUBLE MTN FORK BRIDGE to DOUBLE MTN FORK BRIDGE | 7 of 8 | $7,552,619 | +88% |
| 04 NOV 2020 | 11203003 | Lubbock District | US 62 Install cable median barrier from SEMINOLE to SEAGRAVES | 2 of 6 | $9,059,457 | +2.0% |
| 08 MAY 2020 | 05203211 | Lubbock District | SL 76 Safety widening from FM 2053 to US 87 | 1 of 3 | $23,982,637 | Low, 23% under the second |
| 06 FEB 2020 | 02203001 | Amarillo District | IH 40 B-2 phase ii: reconstruct ih 40 2nd level mainlan from BI 40-D to FM 2590 (SONCY ROAD) | 1 of 3 | $50,032,708 | Low, 21% under the second |
| 09 JAN 2020 | 01203001 | Odessa District | SL 250 Construct new interchange from AT CR 1140 | 6 of 7 | $27,478,330 | +22% |
| 09 JAN 2020 | 01203007 | Abilene District | US 180 Milling, spot repair, 2"overlay, structure work from ALBANY EAST CITY LIMITS to STEPHENS COUNTY LINE | 3 of 4 | $8,916,171 | +8.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.