TxDOT letting results, February 4, 2022
27 contracts let by Texas DOT on February 4, 2022, $292,748,883 in low bids, a median of 3 bidders per contract. On the 27 with an engineer's estimate, the low bid came in under it 10 times; median low bid +6.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 27
- Low bids, total
- $292,748,883
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 02223225 | IH 10 Construct new road from 0.22 MI W OF FM 1905 (ANTONIO ST) to SH 20 (MESA ST) | El Paso District | 3 | Sundt Construction, Inc. | $174,305,265 | $187,434,509 | +8.0% | -4.0% | TxDOT |
| 02223201 | US 62 Surfacing/roadway restoration from MEMPHIS AVE to IH-27 | Lubbock District | 3 | Sacyr Construction USA LLC | $25,690,813 | $29,799,990 | +16% | +13% | TxDOT |
| 02223202 | IH 35 Resurface roadway from 1.19 MI SOUTH OF CARRIER RD (SBML) to MILE MARKER 16 | Laredo District | 2 | Anderson Columbia Co., Inc. | $14,045,934 | $14,834,526 | +6.0% | +3.0% | TxDOT |
| 02223226 | RM 1061 Highway improvement from RM 2381 to N COULTER STREET | Amarillo District | 5 | Kiewit Infrastructure South Co. | $12,755,021 | $13,405,631 | +5.0% | +9.0% | TxDOT |
| 02223204 | US 67 Resurface roadway from BU 67N to ELLIS COUNTY LINE | Fort Worth District | 3 | Texas Materials Group, Inc. | $8,171,636 | $9,500,994 | +16% | +8.0% | TxDOT |
| 02223207 | IH 20 Bridge maintenance from AT IH 35E | Dallas District | 5 | Gibson & Associates, Inc. | $7,163,237 | $9,753,324 | +36% | -8.0% | TxDOT |
| 02223205 | FM 2115 Rehabilitate and widen shoulders from IH 35 to FM 487 | Waco District | 4 | Texas Materials Group, Inc. | $7,148,926 | $7,787,345 | +9.0% | +3.0% | TxDOT |
| 02223203 | FM 109 Bridge replacement from AT CUMMINS CR. & CUMMINS CR. RELIEF to STR # 0716-02-015 & 016 | Yoakum District | 3 | NBG Constructors, Inc. | $6,985,517 | $7,350,500 | +5.0% | +9.0% | TxDOT |
| 02223206 | SL 13 Resurface roadway from SL 353 to IH 35 | San Antonio District | 6 | Clark Construction of Texas, Inc. | $6,683,654 | $6,961,898 | +4.0% | -7.0% | TxDOT |
| 02223210 | SH 3 Surfacing/roadway restoration from N OF FM 1765 to SH 146 | Houston District | 3 | Durwood Greene Construction Co. | $4,384,916 | $4,450,345 | +1.0% | +14% | TxDOT |
| 02223209 | FM 1536 Rehabilitate existing roadway from SH 19 to FM 71 | Paris District | 3 | A. K. Gillis & Sons, LLC | $3,845,345 | $4,047,314 | +5.0% | -13% | TxDOT |
| 02223211 | VA Preventive maintenance from DISTRICTWIDE | El Paso District | 6 | Centerline Technologies, LLC | $3,068,481 | $3,394,534 | +11% | -10% | TxDOT |
| 02223214 | FM 1626 Hazard elimination & safety from SOUTH 1ST STREET to SOMBRERO DRIVE | Austin District | 5 | Dan Williams Company | $2,285,065 | $2,288,440 | 0.0% | +2.0% | TxDOT |
| 02223218 | US 259 Resurface existing 4-lane highway from MEDDLIN CREEK to 0.5 MI.S. OF FM 450 | Atlanta District | 4 | Longview Bridge and Road, LTD. | $1,983,306 | $1,999,809 | +1.0% | +14% | TxDOT |
| 02223213 | VA Preventive maintenance from DISTRICTWIDE | Brownwood District | 8 | Centerline Technologies, LLC | $1,954,667 | $1,999,751 | +2.0% | -10% | TxDOT |
| 02223217 | FM 365 Bridge replacement from AT PIGNUT GULLY to STR 20-124-0-0932-02-003 | Beaumont District | 3 | MB Western Industrial Contracting Co. | $1,947,312 | $2,437,424 | +25% | +23% | TxDOT |
| 02223212 | SH 27 Bridge replacement from AT FESSENDEN BRANCH | San Antonio District | 3 | SB Contractors LLC | $1,836,910 | $1,904,720 | +4.0% | +24% | TxDOT |
| 02223216 | CS Traffic signal improvements from VARIOUS LOCATIONS to IN THE CITY OF DALLAS | Dallas District | 3 | Durable Specialties, Inc. | $1,724,000 | $1,999,500 | +16% | -3.0% | TxDOT |
| 02223219 | CS Bridge maintenance from N WALTERS ST @ UPRR & LARRY STREET | San Antonio District | 3 | Relmco, Inc. | $1,567,048 | $1,699,947 | +8.0% | -18% | TxDOT |
| 02223221 | FM 846 Install/replace signs from 0.644 MI E OF CR 31 to '0.284 MI E OF CR 33 | Abilene District | 3 | RK Hall, LLC | $995,017 | $1,046,609 | +5.0% | +16% | TxDOT |
| 02223220 | FM 973 Bicycle and pedestrian improvements from WEST OF SH 130 to EAST OF SH 130 | Austin District | 3 | Lone Star Sitework, LLC | $969,301 | $1,061,876 | +10% | +10% | TxDOT |
| 02223222 | CS Bridge replacement from 0.45 MILES SOUTH OF US 70 to 0.47 MILES SOUTH OF US 70 | Lubbock District | 2 | Blackstone Concrete Ventures, LLC | $847,028 | $1,133,574 | +34% | -5.0% | TxDOT |
| 02223223 | SH 286 Safety treat fixed objects from ON SH286 FROM HORNE RD to GOLLIHAR RD | Corpus Christi District | 4 | Lucania Construction LLC | $706,535 | $997,979 | +41% | +6.0% | TxDOT |
| 02223228 | IH 20 Bridge maintenance from AT BNSF RAILROAD | Atlanta District | 5 | R & G Construction, LLC | $639,848 | $856,487 | +34% | -8.0% | TxDOT |
| 02223229 | CS Bridge replacement from AT BIG HEAD CREEK to STR #001, IN KILGORE | Tyler District | 6 | South Texas Illumination, LLC | $638,113 | $667,676 | +5.0% | +7.0% | TxDOT |
| 02223227 | VA Landscape development from AT VARIOUS LOCATIONS IN ARANSAS COU | Corpus Christi District | 1 | Tight Line Construction, LLC | $254,251 | +21% | TxDOT | ||
| 02223224 | PW State park improvements from AT J.D. MURPHREE WMA | Beaumont District | 2 | Texas Materials Group, Inc. | $151,736 | $156,334 | +3.0% | +16% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.