Blackstone Concrete Ventures, LLC: TxDOT bid record
Blackstone Concrete Ventures, LLC submitted 22 bids on Texas DOT contracts in the data, from 08 APR 2020 to 02 NOV 2022, and was the low bidder on 8 of them (36%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $5,724,097
- Latest bid
- 02 NOV 2022
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 7 | 3 | 43% |
| 2021 | 10 | 3 | 30% |
| 2022 | 5 | 2 | 40% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Lubbock District | 10 | 5 | 50% |
| Childress District | 4 | 0 | 0% |
| Amarillo District | 3 | 1 | 33% |
| Wichita Falls District | 1 | 0 | 0% |
| Atlanta District | 1 | 1 | 100% |
| Brownwood District | 1 | 0 | 0% |
| Maintenance Division District | 1 | 1 | 100% |
| San Angelo District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 20 | 14 (70%) | $1,100.00 | $5,000.00 |
| TMA (stationary) | 505-7001 | DAY | 9 | 7 (78%) | $50.00 | $230.00 |
| Biodegradable erosion control logs (install) (18") | 506-7045 | LF | 9 | 6 (67%) | $5.00 | $7.90 |
| Approach slab | 422-7013 | CY | 6 | 6 (100%) | $515.00 | $750.00 |
| Emuls asphalt (erosion control)(CSS-1H) | 314-7011 | GAL | 8 | 5 (63%) | $10.00 | $4.32 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 5 | 5 (100%) | $450.00 | $643.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 10 | 4 (40%) | $1.50 | $1.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 10 | 4 (40%) | $4.00 | $4.00 |
| Excavation (roadway) | 110-7001 | CY | 5 | 3 (60%) | $25.00 | $20.00 |
| Install small roadside sign support and assembly type 10BWG(1)SA(P) | 644-7001 | EACH | 5 | 3 (60%) | $500.00 | $710.00 |
| Eliminating existing pavement marking & markers (4") | 677-6001 | LF | 5 | 3 (60%) | $1.00 | $0.60 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 10 | 2 (20%) | $2.00 | $1.40 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Earth Builders, L.P. | 11 | 2 of 11 |
| Gilvin-Terrill, LTD. | 8 | 1 of 8 |
| Hodges and Son Construction Company, Inc. | 5 | 1 of 5 |
| O. Trevino Construction, LLC | 4 | 0 of 4 |
| HJC Farms, Inc. | 3 | 1 of 3 |
| Stateline Construction, LLC | 3 | 1 of 3 |
| Integrity Services, LLC | 3 | 1 of 3 |
| SCR Civil Construction, LLC | 3 | 1 of 3 |
| Scott Tucker Construction Company, LLC | 3 | 0 of 3 |
| American Lighting and Signalization, LLC | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 NOV 2022 | 11224004 | Amarillo District | IH0040 Cable median barrier system repair from VARIOUS LOCATIONS ~ SEE PLAN SHEETS to VARIOUS LOCATIONS ~ SEE PLAN SHEETS | 3 of 3 | $814,110 | +185% |
| 02 NOV 2022 | 11224014 | San Angelo District | SH0208 Crack seal from DISTRICT WIDE to DISTRICT WIDE | 5 of 6 | $906,406 | +70% |
| 07 APR 2022 | 04223213 | Lubbock District | SH 86 Bridge replacement from 1.6 MILES EAST OF FM 1424 to 1.63 MILES EAST OF FM 1424 | 3 of 3 | $2,700,729 | +16% |
| 07 APR 2022 | 04223221 | Amarillo District | VA Bridge maintenance from DISTRICT WIDE | 1 of 4 | $843,650 | Low, 41% under the second |
| 04 FEB 2022 | 02223222 | Lubbock District | CS Bridge replacement from 0.45 MILES SOUTH OF US 70 to 0.47 MILES SOUTH OF US 70 | 1 of 2 | $847,028 | Low, 34% under the second |
| 02 DEC 2021 | 12213216 | Childress District | FM 1041 Bridge replacement from FM 1041 @ OAKS CREEK | 2 of 7 | $1,220,955 | +4.0% |
| 02 DEC 2021 | 12213221 | Maintenance Division District | CR Bridge replacement from 4.14 MILES SW OF US 84 to 4.15 MILES SW OF US 84 | 1 of 4 | $847,050 | Low, 1.0% under the second |
| 08 OCT 2021 | 10213209 | Lubbock District | IH 27 Hazard elimination & safety from SH 194 to SWISHER COUNTY LINE | 2 of 7 | $1,484,105 | 0.0% |
| 08 OCT 2021 | 10214208 | Childress District | US0287 Culvert repair from CULVERT AT CREEK CROSSING | 2 of 6 | $407,093 | +2.0% |
| 07 OCT 2021 | 10214006 | Brownwood District | SH0016 Bridge preventative maintenance from DISTRICT-WIDE to DISTRICT-WIDE | 4 of 6 | $705,305 | +18% |
| 04 JUN 2021 | 06213221 | Childress District | US 287 Bridge replacement from US 287 @ BAYLOR CREEK | 2 of 8 | $2,081,236 | 0.0% |
| 06 MAY 2021 | 05213237 | Atlanta District | CS Construct sidewalks and curb ramps from ON JOHNSON STREET, FIVE NOTCH ROAD, to & POSITIVE PLACE IN MARSHALL | 1 of 6 | $477,174 | Low, 13% under the second |
| 05 MAR 2021 | 03213224 | Lubbock District | IH 27 Install/rehabilitate its from LUBBOCK COUNTY LINE to EAST 1ST STREET IN HALE CENTER | 1 of 3 | $177,778 | Low, 25% under the second |
| 04 MAR 2021 | 03213028 | Lubbock District | VA Install dynamic message signs from VARIOUS LOCATIONS IN to THE LUBBOCK DISTRICT | 3 of 5 | $350,342 | +11% |
| 04 FEB 2021 | 02213034 | Amarillo District | VA Construct pedestrian infrastructure from US 87 (BUCHANAN ST) to GRAND ST | 3 of 3 | $348,080 | +10% |
| 03 DEC 2020 | 12203217 | Childress District | SH 70 Bridge maintenance from @ SALT FORK | 10 of 12 | $1,017,422 | +70% |
| 03 SEP 2020 | 09203025 | Lubbock District | CR Bridge replacement from 0.23 MILES SOUTH OF FM 1318 to 0.25 MILES SOUTH OF FM 1318 | 1 of 6 | $552,000 | Low, 23% under the second |
| 08 JUL 2020 | 07203044 | Lubbock District | CR Bridge replacement from 1.15 MILES SOUTH OF US 70 to 1.22 MILES SOUTH OF US 70 | 1 of 4 | $436,230 | Low, 14% under the second |
| 08 MAY 2020 | 05203230 | Lubbock District | FM 2301 Bridge replacement from 1.0 MILE NORTH OF SH 86 to 0.92 MILE NORTH OF SH 86 | 1 of 4 | $1,543,188 | Low, 12% under the second |
| 07 MAY 2020 | 05203032 | Lubbock District | IH 27 Installation of led chevron signs from 0.715 MI. SOUTH OF SL 369 to 0.185 MI. NORTH OF SL 369 | 4 of 7 | $131,490 | +12% |
| 08 APR 2020 | 04203024 | Lubbock District | VA Traffic small sign installation from VARIOUS LOCATIONS IN to LUBBOCK DISTRICT | 2 of 4 | $1,840,660 | +7.0% |
| 08 APR 2020 | 04203041 | Wichita Falls District | FM 922 Safety treat fixed objects from 1.25 MI W OF GRAYSON COUNTY LINE to GRAYSON COUNTY LINE | 2 of 6 | $176,722 | +11% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.