Lucania Construction LLC: TxDOT bid record
Lucania Construction LLC submitted 23 bids on Texas DOT contracts in the data, from 05 AUG 2020 to 06 SEP 2023, and was the low bidder on 7 of them (30%). When it was not low, its total sat a median +32% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $12,283,423
- Latest bid
- 06 SEP 2023
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 2 | 50% |
| 2021 | 3 | 2 | 67% |
| 2022 | 12 | 1 | 8% |
| 2023 | 4 | 2 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Corpus Christi District | 10 | 3 | 30% |
| Pharr District | 7 | 4 | 57% |
| San Antonio District | 2 | 0 | 0% |
| Yoakum District | 2 | 0 | 0% |
| Houston District | 1 | 0 | 0% |
| Laredo District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 22 | 6 (27%) | $2,950.00 | $5,000.00 |
| Preparing row | 100-7002 | STA | 11 | 5 (45%) | $2,500.00 | $2,750.00 |
| Excavation (roadway) | 110-7001 | CY | 10 | 5 (50%) | $20.00 | $20.00 |
| Portable changeable message sign | 503-7001 | DAY | 8 | 4 (50%) | $65.00 | $100.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 15 | 3 (20%) | $5.50 | $4.00 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 8 | 3 (38%) | $537.50 | $643.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 15 | 2 (13%) | $2.00 | $1.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 8 | 2 (25%) | $3,500.00 | $3,245.00 |
| Construction exits (remove) | 506-7024 | SY | 8 | 2 (25%) | $5.50 | $10.00 |
| Construction exits (install) (type 1) | 506-7020 | SY | 8 | 2 (25%) | $22.50 | $30.00 |
| Removing structure (bridge 0 - 99 FT length) | 496-7009 | EACH | 8 | 2 (25%) | $30,000 | $26,200 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 7 | 2 (29%) | $8.50 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| CK Newberry, LLC | 6 | 2 of 6 |
| SCR Civil Construction, LLC | 5 | 1 of 5 |
| Foremost Paving, Inc. | 4 | 1 of 4 |
| Ti-Zack Concrete, LLC | 3 | 2 of 3 |
| FNH Construction, LLC | 3 | 0 of 3 |
| Encino Landscape, Inc. | 3 | 2 of 3 |
| B & MS Construction, Inc. | 3 | 2 of 3 |
| Ioc Company LLC | 3 | 1 of 3 |
| Texas Cordia Construction, LLC | 3 | 2 of 3 |
| MB Western Industrial Contracting Co. | 3 | 3 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 06 SEP 2023 | 09233033 | Pharr District | CS Resurface roadway from WITHIN WORLD BIRDING CENTER & to RESACA DE LAS PALMAS STATE PARK | 1 of 2 | $64,546 | Low, 38% under the second |
| 02 AUG 2023 | 08233059 | Yoakum District | CR Bridge replacement from AT LCRA CANAL to STR #AA01-86-001 | 2 of 3 | $748,515 | +40% |
| 01 JUN 2023 | 06233011 | Laredo District | CR Bridge replacement from RAICES ROAD | 3 of 5 | $3,831,887 | +33% |
| 02 FEB 2023 | 02233243 | Pharr District | CS Bridge replacement from DOOLITTLE RD., 1.71 MI N OF FM 1925 to STR# AA01-82-001 @ N MAIN DITCH | 1 of 4 | $2,309,683 | Low, 5.0% under the second |
| 01 DEC 2022 | 12223025 | Corpus Christi District | VA Construct pedestrian infrastructure from AT VARIOUS LOCATIONS IN KINGSVILLE to ON KENNEDY, LOTT, 17TH, 19TH, AND 2 | 4 of 6 | $1,062,852 | +33% |
| 15 NOV 2022 | 11221601 | Corpus Christi District | US0059 Bridge preventative maintenance from VARIOUS | 5 of 5 | $235,660 | +70% |
| 15 NOV 2022 | 11221602 | Corpus Christi District | US0059 Bridge preventative maintenance from VARIOUS | 4 of 5 | $259,850 | +75% |
| 15 NOV 2022 | 11221603 | Corpus Christi District | US0059 Bridge scour repair from US 59 SB @ COLETO CR RES to 1.80 MI E OF FM 2987 | 5 of 8 | $314,794 | +11% |
| 03 NOV 2022 | 11223218 | Pharr District | FM 492 Bridge replacement from .25 MI N OF BUS 83 to @ EDINBURG MAIN CANAL | 2 of 5 | $2,174,194 | +13% |
| 07 SEP 2022 | 09223022 | Houston District | FM 528 Rehabilitate bridge from AT IRRIGATION CANAL | 5 of 6 | $828,617 | +35% |
| 07 SEP 2022 | 09223023 | Yoakum District | VA Construct pedestrian infrastructure from VARIOUS LOCATION IN CITY OF WHARTON | 2 of 4 | $744,937 | +12% |
| 04 MAR 2022 | 03223207 | Corpus Christi District | US 181 Install median barrier from ON US 181 FROM FM 631 to FM 2986 | 7 of 7 | $2,828,378 | +45% |
| 04 FEB 2022 | 02223219 | San Antonio District | CS Bridge maintenance from N WALTERS ST @ UPRR & LARRY STREET | 3 of 3 | $2,273,494 | +45% |
| 04 FEB 2022 | 02223223 | Corpus Christi District | SH 286 Safety treat fixed objects from ON SH286 FROM HORNE RD to GOLLIHAR RD | 1 of 4 | $706,535 | Low, 41% under the second |
| 03 FEB 2022 | 02223018 | San Antonio District | CR Bridge replacement from CR 2500 (SADLER RD) @SAN MIGUEL CRK | 5 of 6 | $622,527 | +18% |
| 06 JAN 2022 | 01223028 | Corpus Christi District | CR Bridge replacement from ON CR3755(CR81) AT DRAINAGE DITCH to APPROX. 3.2 MI S OF SH 188 | 4 of 4 | $1,034,547 | +30% |
| 04 JUN 2021 | 06213229 | Pharr District | FM 511 Bridge replacement from .4 MI S OF SH 4 STR#0684-02-007 to OVER DRAINAGE DITCH | 5 of 6 | $1,477,124 | +29% |
| 04 MAR 2021 | 03213010 | Corpus Christi District | CS Replace bridge and approaches from ON BAY SHORE DRIVE (KEY ALLERGRO) to 0.05 MI E OF BROADWAY ST. | 1 of 5 | $4,582,972 | Low, 26% under the second |
| 08 JAN 2021 | 01213218 | Corpus Christi District | IH 37 Installation of crash wall from AT INTERSECTION OF IH37/FM2049 | 1 of 6 | $3,746,407 | Low, 1.0% under the second |
| 03 DEC 2020 | 12203220 | Corpus Christi District | CS Installation of sidewalks in rockport from VARIOUS LOCATIONS IN ROCKPORT to ON LIVE OAK,1ST,AUSTIN AND BAY STS. | 6 of 9 | $891,669 | +11% |
| 05 AUG 2020 | 08203017 | Pharr District | IH 69E Construct pedestrian infrastructure from WHALLEN RD. to FM 2994 | 2 of 5 | $5,990,608 | +11% |
| 05 AUG 2020 | 08203038 | Pharr District | BU 77-X Bridge maintenance from ON BUS 77 @ ARROYO COLORADO to STR #:_0039-12-035 | 1 of 5 | $535,243 | Low, 8.0% under the second |
| 05 AUG 2020 | 08203056 | Pharr District | SS 115 Landscape improvements from LUCILLE RD. to FM 3072 (DICKER RD.) | 1 of 1 | $338,038 | Low |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.