24 contracts let by Texas DOT on March 4, 2022, $76,721,667 in low bids, a median of 3.5 bidders per contract. On the 24 with an engineer's estimate, the low bid came in under it 13 times; median low bid -1.0% against the estimate.

Owner
Texas DOT
Contracts
24
Low bids, total
$76,721,667
Data through
19 NOV 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapAgainst estimateSource
03223203US 80 Intersection improvements and bridge replacement from AT SH 205/FM 148Dallas District3Sterling Delaware Holding Company, Inc.$15,839,362$16,369,000+3.0%+23%TxDOT
03223202FM 874 Highway improvement from SH 18 to SH 115Odessa District3Jones Bros. Dirt & Paving Contractors, Inc.$14,858,747$16,642,779+12%0.0%TxDOT
03223214IH 35 Base, seal coat, pav mrks from FM133 to 7.038 MI S OF FM133(EFR)Laredo District5CK Newberry, LLC$11,045,138$11,472,445+4.0%-2.0%TxDOT
03223205FM 1093 Surfacing/roadway restoration from FM 3013 IN EAGLE LAKE to WHARTON COUNTY LINEYoakum District7Glenn Fuqua, Inc.$5,576,114$6,779,605+22%-6.0%TxDOT
03223204SH 3 Hazard elimination & safety from SOUTH RICHEY STREET to GALVESTON COUNTY LINEHouston District3Isi Contracting, Inc.$5,450,260$6,965,912+28%-3.0%TxDOT
03223206FM 362 Base repair, planing, seal coat, 1.5" pfc ol from NORTH OF US 290 to FM 1488Houston District6Durwood Greene Construction Co.$3,607,335$3,646,425+1.0%-2.0%TxDOT
03223210FM 2088 Bridge maintenance from AT CANEY CREEK RELIEF to 3.45 MI E OF FM 2869Tyler District103LW Civil LLC$2,199,787$2,282,233+4.0%-6.0%TxDOT
03223226US 84 Cam and tom overlay from LAKE AIR DRIVE to VALLEY MILLS DR (SL 396)Waco District3Knife River Corporation - South$2,174,993$2,448,316+13%+34%TxDOT
03223209FM 521 Surfacing/roadway restoration from BRAZORIA COUNTY LINE to SH 6Houston District3Durwood Greene Construction Co.$2,089,682$2,248,522+8.0%+23%TxDOT
03223207US 181 Install median barrier from ON US 181 FROM FM 631 to FM 2986Corpus Christi District7Massana Construction Inc.$1,944,297$2,150,872+11%-8.0%TxDOT
03223227FM 407 Realignment of existing roadway from GULF AVE to WEST OF SAGE DRDallas District5Ed Bell Construction Company$1,884,000$1,979,510+5.0%+17%TxDOT
03223220SH 87 Resurface roadway from SH 21 to FM 83 WEST, ETC.Lufkin District2Moore Brothers Construction Company$1,686,545$1,936,114+15%+23%TxDOT
03223213FM 1047 Bridge replacement from FM 1047 AT BENNETT BRANCHBrownwood District5Acme Bridge Company, Inc.$1,685,451$1,733,885+3.0%+13%TxDOT
03223212FM 1249 Surfacing/roadway restoration from SH 42 (BU 259), E FOR 1.25 MI to END OF 5-LN SECTION IN KILGORETyler District2Madden Contracting Company, LLC.$1,177,203$1,448,950+23%-4.0%TxDOT
03223221CR Bridge replacement from CR 101 AT FLAT CYPRESS CREEK to (STR 201010AA0101001)Beaumont District2Project Allied Resources, LLC$935,311$980,168+5.0%+88%TxDOT
03223208VA Preventive maintenance from DISTRICTWIDEOdessa District6Vizcaino, L.P.$866,888$965,950+11%-17%TxDOT
03223215CS Hazard elimination & safety from IN NEW BRAUNFELS ON HANZ DR to AT GRUENE RDSan Antonio District4E-Z Bel Construction, LLC$629,837$725,479+15%+1.0%TxDOT
03223218CR Bridge replacement from CR 15100 to AT BRANCH OF CUTHAND CREEKParis District3Hodges and Son Construction Company, Inc.$579,521$641,777+11%-1.0%TxDOT
03223223CR Bridge replacement from AT BILLIAMS CREEK to (STR 202290AA0135001)Beaumont District3Drewery Construction Company, Incorporated$498,676$642,619+29%+49%TxDOT
03223219US 54 Hazard elimination & safety from BU 87B (7TH & DENVER)Amarillo District1Siemens Mobility, Inc.$486,529+1.0%TxDOT
03223217VA Preventive maintenance from COUNTYWIDEEl Paso District10Mijelum, L.L.C.$485,120$538,756+11%-3.0%TxDOT
03223216CR Replace bridge and approaches from ON CR 2116 AT HAGGERTY CREEKAtlanta District10THK Construction LLC$481,045$491,026+2.0%-4.0%TxDOT
03223222FM 2837 Traffic signal improvements from AT CHAPEL RDWaco District5Florida Traffic Control Devices, Inc.$290,913$306,807+5.0%-4.0%TxDOT
03223224US 82 Install traffic signal from AT FM 2148Atlanta District2Striping Technology, L.P.$248,913$296,342+19%-4.0%TxDOT
TxDOT contracts let on March 4, 2022, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy