Sterling Delaware Holding Company, Inc.: TxDOT bid record
Sterling Delaware Holding Company, Inc. submitted 54 bids on Texas DOT contracts in the data, from 08 MAY 2020 to 06 AUG 2026, and was the low bidder on 5 of them (9%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $94,852,849
- Latest bid
- 06 AUG 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 8 | 0 | 0% |
| 2021 | 13 | 1 | 8% |
| 2022 | 14 | 2 | 14% |
| 2023 | 7 | 2 | 29% |
| 2024 | 7 | 0 | 0% |
| 2025 | 3 | 0 | 0% |
| 2026 | 2 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 15 | 1 | 7% |
| Dallas District | 13 | 2 | 15% |
| San Antonio District | 11 | 1 | 9% |
| Fort Worth District | 4 | 0 | 0% |
| Yoakum District | 3 | 0 | 0% |
| Odessa District | 2 | 0 | 0% |
| Austin District | 2 | 0 | 0% |
| Tyler District | 1 | 0 | 0% |
| Waco District | 1 | 0 | 0% |
| Paris District | 1 | 0 | 0% |
| Brownwood District | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Install small roadside sign support and assembly type 10BWG(1)SA(P) | 644-7001 | EACH | 43 | 26 (60%) | $625.00 | $710.00 |
| Trench excavation protection | 402-7001 | LF | 28 | 26 (93%) | $1.00 | $10.00 |
| TMA (stationary) | 505-7001 | DAY | 45 | 23 (51%) | $100.00 | $230.00 |
| Eliminating existing pavement marking & markers (4") | 677-6001 | LF | 31 | 21 (68%) | $0.48 | $0.60 |
| Remove SM RD SN sup&AM | 644-7073 | EACH | 38 | 19 (50%) | $92.50 | $110.00 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 32 | 19 (59%) | $4.92 | $5.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 39 | 18 (46%) | $2,931.54 | $3,245.00 |
| Reflectorized pavement marking type I (W)24"(solid)(100MIL) | 666-7036 | LF | 26 | 18 (69%) | $6.00 | $8.00 |
| Reflectorized pavement marking type I (W)8"(solid)(100MIL) | 666-7024 | LF | 29 | 17 (59%) | $1.00 | $1.10 |
| Portable changeable message sign | 503-7001 | DAY | 21 | 17 (81%) | $35.00 | $100.00 |
| Install small roadside sign support and assembly type 10BWG(1)SA(T) | 644-7004 | EACH | 37 | 16 (43%) | $731.00 | $825.00 |
| Metal W-beam guard fence (timber post) | 540-7001 | LF | 27 | 16 (59%) | $23.75 | $27.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| James Construction Group, LLC | 18 | 12 of 18 |
| Ed Bell Construction Company | 16 | 5 of 16 |
| Harper Brothers Construction LLC | 14 | 7 of 14 |
| Hunter Industries, LTD. | 12 | 10 of 12 |
| Ragle Construction, Inc. | 12 | 5 of 12 |
| Capital Excavation Company | 9 | 8 of 9 |
| Angel Brothers Holdings Corp. | 8 | 6 of 8 |
| Altus Construction LLC | 8 | 3 of 8 |
| Isi Contracting, Inc. | 8 | 5 of 8 |
| Austin Bridge & Road Services, LP | 7 | 7 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 06 AUG 2026 | A00187792 | Dallas District | Rehabilitate Existing Roadway, FM 981 (SH 78 to FM 1562) | 6 of 7 | $22,765,120 | +21% |
| 07 MAY 2026 | A00187130 | San Antonio District | Rehabilitate Existing Roadway, FM 1150 (FM 1104 to SH 80) | 2 of 4 | $15,335,099 | +8.0% |
| 04 APR 2025 | A00184721 | San Antonio District | Hazard Elimination & Safety, SH 16 (W Jett Rd to Bexar/Atascosa CoL) | 6 of 6 | $10,223,792 | +15% |
| 04 MAR 2025 | A00124556 | Yoakum District | Surfacing/Roadway Restoration, FM 1301 (FM 1728 to BRAZORIA C/L) | 6 of 6 | $11,247,692 | +58% |
| 08 JAN 2025 | A00063792 | Fort Worth District | Bridge Replacement, SS 303 (SPUR 303/RUSH CREEK RELIEF to .) | 3 of 7 | $7,827,476 | +8.0% |
| 04 DEC 2024 | A00190745 | Dallas District | Hazard Elimination & Safety, US 80 (Buffalo Creek Relief to FM 548) | 8 of 12 | $4,708,698 | +35% |
| 10 JUL 2024 | 07243207 | Dallas District | FM 455 Bridge replacement from AT EAST FORK TRINITY RIVER RELIEF W to AT EAST FORK TRINITY RIVER EAST | 5 of 6 | $11,455,065 | +20% |
| 09 JUL 2024 | 07243009 | Houston District | FM 521 Bridge replacement from AT OYSTER CREEK | 7 of 8 | $3,640,834 | +12% |
| 05 APR 2024 | 04243208 | San Antonio District | FM 306 Bicycle and pedestrian improvements from GUADALUPE RIVER- EASTERN CROSSSING to GUADALUPE RIVER- WESTERN CROSSING | 5 of 6 | $9,356,591 | +30% |
| 06 MAR 2024 | 03243209 | Dallas District | IH 635 Interchange improvement from AT BELT LINE RD | 3 of 5 | $8,544,985 | +9.0% |
| 05 MAR 2024 | 03243017 | San Antonio District | US 90 Hazard elimination & safety from A SH 211 | 4 of 6 | $8,829,708 | +29% |
| 02 FEB 2024 | 02243226 | Houston District | IH 45 Highway improvement from N OF FM 830 to S OF FM 1097 | 8 of 9 | $3,876,340 | +22% |
| 02 NOV 2023 | 11233218 | Dallas District | SH 78 Intersection improvements with right and/or left from N OF BENTLEY DRIVE to BENTLEY DRIVE | 2 of 6 | $2,026,492 | +2.0% |
| 03 AUG 2023 | 08233270 | Fort Worth District | CR Bridge replacement from NEW HOPE ROAD AT WARD BRANCH | 3 of 3 | $1,356,608 | +87% |
| 02 AUG 2023 | 08233006 | Brownwood District | IH 20 Bridge replacement from 0.6 MI. EAST OF SH 16 to 0.26 MI. WEST OF ERATH COUNTY LINE | 1 of 2 | $27,631,401 | Low, 7.0% under the second |
| 28 JUN 2023 | 06233612 | San Antonio District | SH 16 Widen road - add shoulders from PRIVILEGE CREEK to 0.2 MI. WEST OF FM 1283 | 2 of 5 | $5,363,798 | +6.0% |
| 27 JUN 2023 | 06233428 | Yoakum District | FM 457 Adding shoulders with no added capacity from FM 2611 to CANEY DRIVE | 5 of 5 | $4,637,246 | +17% |
| 05 MAY 2023 | 05233233 | Dallas District | CR Replace bridge and approaches from CR 110 AT JONES CREEK to CR 279 AND CR 312 | 5 of 6 | $2,100,323 | +37% |
| 04 MAY 2023 | 05233009 | San Antonio District | SH 16 Widen road - add lanes from OLD SAN ANTONIO RD. to ROBINDALE EAST RD. | 1 of 5 | $14,840,092 | Low, 0.0% under the second |
| 02 DEC 2022 | 12223210 | Houston District | BS 288B Widen road - add shoulders from FM 523 to FM 521 | 2 of 5 | $12,163,999 | +11% |
| 02 NOV 2022 | 11223010 | Houston District | US 290 Construct frontage roads from NORTH OF FM 362 to JAMES MUSE PARKWAY | 2 of 8 | $10,963,075 | 0.0% |
| 06 OCT 2022 | 10223005 | Yoakum District | FM 1301 Highway improvement from SH 60 IN WHARTON to US 59 | 3 of 5 | $15,386,133 | +6.0% |
| 08 SEP 2022 | 09223211 | Houston District | IH 69 Bridge replacement from AT OYSTER CREEK | 3 of 5 | $7,084,065 | +20% |
| 04 AUG 2022 | 08223253 | Houston District | US 290 Construct frontage roads from NORTH OF FM 362 to JAMES MUSE PARKWAY | 2 of 9 | $11,086,022 | +1.0% |
| 30 JUN 2022 | 06223614 | Dallas District | SH 31 Bridge replacement from AT HUGHES BRANCH AND to AT MELTON BRANCH | 2 of 6 | $6,083,414 | +1.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.