TxDOT contract A00063792 bid tabulation

Bridge Replacement, SS 303 (SPUR 303/RUSH CREEK RELIEF to .). Let by Texas DOT on January 8, 2025, Tarrant, Fort Worth District. 7 bids received; low bid $7,221,685 by Ibctx, LLC, -11% against the engineer's estimate of $8,152,678.

Owner
Texas DOT
Letting
08 JAN 2025
Pay items
99
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Ibctx, LLC$7,221,685Low-11%
2Indus Road & Bridge, Inc.$7,574,410+5.0%-7.0%
3Sterling Delaware Holding Company, Inc.$7,827,476+8.0%-4.0%
4Ed Bell Construction Company$7,888,000+9.0%-3.0%
5MP Heavy Construction Inc$7,953,840+10%-2.0%
6Altus Construction LLC$8,144,563+13%0.0%
7Ragle Construction, Inc.$8,195,890+13%+1.0%
TxDOT contract A00063792: bids by rank

Engineer's estimate: $8,152,678.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Ibctx, LLC2. Indus Road & Bridge, Inc.3. Sterling Delaware Holding Company, Inc.4. Ed Bell Construction Company5. MP Heavy Construction Inc6. Altus Construction LLC
1Preparing row (100-7002)STA5.80$7,500.00$8,000.00$102,859$67,241$52,138$4,500.00$139,725
2Removing concrete (pavement) (104-7001)SY3,362$20.00$25.00$30.00$19.00$21.00$28.00$20.53
3Removing concrete (curb) (104-7016)LF2,776$15.00$11.00$6.00$12.00$21.00$12.00$8.51
4Remove (10"-14") TRT/untrt base & asphalt pavement (105-7010)SY3,925$15.00$11.00$16.00$20.00$5.25$20.00$5.96
5Excavation (roadway & channel) (110-7004)CY835$50.00$58.00$36.00$128.00$50.00$45.00$21.27
6Embankment (final)(DC)(type B) (132-7004)CY364$30.00$77.00$25.00$10.00$75.00$65.00$22.24
7Compost manuf topsoil (4") (161-7002)SY1,332$5.00$5.00$2.50$10.00$5.25$2.50$3.40
8Block sodding (162-7002)SY8,034$10.00$5.00$5.00$3.95$5.25$4.74$5.67
9Broadcast seed (temporary_warm_cool) (164-7007)SY8,034$1.00$0.60$0.30$0.55$0.55$0.66$0.23
10Vegetative watering (168-7001)TGL562$26.00$60.00$21.00$31.00$3.15$68.34$1.13
11Irrigation system (170-7001)LS1$20,000$20,000$15,000$18,776$19,000$22,531$57,853
12Lime (com or QK)(slurry) (260-7005)TON45$220.00$475.00$350.00$306.00$450.00$367.20$386.48
13Lime TRT (existing material)(8") (260-7007)SY2,723$14.00$19.00$10.00$25.00$10.00$17.00$5.10
14Prime coat(MC-30 or AE-P) (310-7013)GAL545$10.00$11.00$12.00$10.00$10.50$12.00$5.53
15D-GR HMA type-B PG64-22 (exempt) (341-7003)TON626$150.00$160.00$175.00$153.00$168.00$183.60$178.45
16Concrete pavement (CRCP) (8") (360-7002)SY2,492$140.00$147.00$80.00$70.00$125.00$125.00$173.87
17Cem stabil BKFL (400-7010)CY1,174$260.00$220.00$231.00$130.00$222.00$199.20$201.99
18Trench excavation protection (402-7001)LF390$22.00$25.00$22.00$1.00$12.00$29.99$8.51
19Temporary special shoring (403-7001)SF769$48.00$25.00$47.00$47.00$105.00$42.94$30.51
20Drilled shaft (18 in) (416-7002)LF272$140.00$190.00$200.00$118.25$175.00$153.53$196.90
21Drilled shaft (36 in) (416-7006)LF3,124$285.00$300.00$290.00$218.90$300.00$222.50$297.27
22Class C concrete (abutment)(HPC) (420-7013)CY136.80$1,500.00$1,300.00$850.00$1,800.00$1,500.00$1,620.00$1,145.52
23Class C concrete (cap)(HPC) (420-7023)CY128.60$1,800.00$1,000.00$1,100.00$1,800.00$1,500.00$1,305.00$1,241.13
24Class C concrete (column)(HPC) (420-7039)CY32.70$1,750.00$2,100.00$1,500.00$2,250.00$3,000.00$1,530.00$2,334.63
25Reinforced concrete slab (HPC) (422-7002)SF28,160$30.00$27.00$23.00$33.00$25.00$28.42$24.94
26Approach slab (HPC) (422-7014)CY710.40$750.00$520.00$500.00$405.00$400.00$850.00$527.08
27Bridge median (HPC) (422-7021)SF5,720$19.00$13.00$15.00$10.00$15.00$25.00$15.08
28Prestressed concrete girder (TX28) (425-7001)LF4,249.32$220.00$195.00$195.00$280.00$225.00$182.20$220.45
29Riprap (mow strip)(4 in) (432-7013)CY39.60$700.00$900.00$700.00$850.00$900.00$745.00$535.57
30Riprap (stone protection)(24 in) (432-7045)CY891$160.00$155.00$200.00$250.00$222.00$175.38$156.22
31Rail (type C223)(HPC) (450-7035)LF643.20$400.00$215.00$152.00$282.00$222.00$150.00$96.38
32Rail (type PR11) (450-7044)LF496$190.00$95.00$125.00$118.00$155.00$144.00$147.81
33Sealed expansion joint (4 in) (SEJ - B) (454-7006)LF250$140.00$130.00$145.00$220.00$175.00$150.00$138.05
34Removing structure (bridge 100 - 499 FT length) (496-7010)EACH1$140,000$100,000$105,000$120,000$210,000$150,000$236,546
35Mobilization (500-7001)LS1$729,300$722,000$750,000$780,000$787,286$1,439,460$806,232
36Barricades, signs and traffic handling (502-7001)MO13$10,000$4,000.00$13,250$13,060$31,500$4,000.00$29,778
37Portable changeable message sign (503-7002)EACH2$10,000$25,000$19,000$12,000$15,750$12,000$19,285
38TMA (stationary) (505-7001)DAY16$175.00$150.00$200.00$200.00$315.00$990.00$170.16
39Construction exits (install) (type 1) (506-7020)SY156$33.00$53.00$36.00$50.54$35.00$60.65$66.02
40Construction exits (remove) (506-7024)SY156$11.00$21.50$10.00$20.48$10.00$24.58$51.05
41Temporary sediment control fence (install) (506-7039)LF1,535$3.00$8.00$4.00$6.00$5.25$5.41$5.67
42Temporary sediment control fence (remove) (506-7041)LF1,535$1.00$4.00$1.10$1.47$1.10$1.76$1.13
43Biodegradable erosion control logs (install) (12") (506-7044)LF65$8.00$20.00$8.00$11.45$16.00$13.74$5.67
44Biodegradable erosion control logs (remove) (506-7046)LF65$2.00$10.00$2.00$4.29$4.00$5.15$1.13
45Constructing detours (508-7001)SY4,944$110.00$108.00$100.00$90.00$75.00$100.08$79.31
46Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001)LF4,080$80.00$38.00$65.00$60.00$30.00$27.13$53.33
47Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025)LF7,290$18.00$16.00$15.00$9.00$10.00$9.62$4.05
48Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049)LF4,080$20.00$16.00$9.00$11.00$15.00$12.00$11.66
49Concrete curb (mono) (type II) (529-7007)LF1,189$20.00$19.00$12.00$14.00$9.00$35.28$6.81
50Concrete curb (doweled) (529-7012)LF3,938$20.00$32.00$35.00$23.00$10.00$32.76$11.06
51Concrete median (536-7002)SY282$200.00$160.00$220.00$125.00$315.00$132.30$93.59
52Metal thrie-beam guard fence (timber post) (540-7003)LF350$50.00$24.00$50.00$22.00$23.10$26.40$58.70
53Metal beam guard fence trans (thrie-beam) (540-7005)EACH2$2,100.00$1,870.00$2,100.00$2,285.13$2,735.62$2,130.00$1,938.09
54Downstream anchor terminal section (540-7015)EACH2$1,600.00$1,155.00$1,700.00$1,100.00$1,155.00$1,320.00$1,276.18
55Metal beam guard fence trans (non - sym) (540-7016)EACH2$1,000.00$710.00$1,000.00$675.00$708.75$810.00$879.71
56Remove metal beam guard fence (542-7001)LF425$6.00$4.00$8.00$3.50$3.68$4.20$2.55
57RM metal beam guard fence trans (thrie-beam) (542-7004)EACH2$330.00$265.00$300.00$250.00$412.87$300.00$212.70
58Guardrail end treatment (install) (544-7001)EACH2$3,200.00$3,000.00$3,000.00$2,860.00$3,003.00$3,432.00$2,809.30
59Guardrail end treatment (remove) (544-7003)EACH2$370.00$265.00$380.00$250.00$262.50$300.00$253.61
60Crash cushion attenuator (move & reset) (545-7002)EACH9$2,000.00$2,200.00$1,500.00$1,235.00$1,478.93$1,482.00$1,442.08
61Crash cushion attenuator (remove) (545-7004)EACH4$1,300.00$1,200.00$900.00$825.00$739.47$990.00$850.79
62Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH4$10,000$10,000$9,000.00$7,075.00$10,729$8,490.00$11,945
63ITS GND box type 2 (603636) (623-7037)EACH1$2,000.00$4,800.00$6,500.00$25,000$3,150.00$5,800.00$2,467.28
64Remove ITS ground box (623-7041)EACH1$1,000.00$1,600.00$1,800.00$5,000.00$525.00$1,740.00$377.01
65Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH1$460.00$1,500.00$700.00$650.00$735.00$1,074.00$645.19
66Remove SM RD SN sup&AM (644-7073)EACH1$152.00$350.00$125.00$25.00$115.50$162.00$97.84
67Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH9$15.00$21.00$35.00$20.00$21.00$24.00$28.08
68Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH9$26.00$26.00$60.00$25.00$26.25$30.00$28.08
69Install object marker assembly (OM-2Y)(WC)GND (658-7056)EACH4$80.00$55.00$70.00$50.00$52.50$60.00$64.22
70Work zone pavement marking removing (W)6"(broken) (662-7065)LF3,010$1.00$1.05$1.00$1.00$3.15$3.60$0.79
71Work zone pavement marking removing (W)6"(DOT) (662-7066)LF633$2.00$2.80$1.00$2.65$3.15$3.60$0.79
72Work zone pavement marking removing (W)6"(solid) (662-7068)LF6,777$1.00$1.05$1.00$1.00$1.84$2.10$0.79
73Work zone pavement marking removing (W)8"(solid) (662-7072)LF1,562$1.00$2.45$1.20$2.30$2.10$2.40$1.21
74Work zone pavement marking removing (W)24"(solid) (662-7077)LF66$7.00$8.30$14.00$7.90$15.75$18.00$13.03
75Work zone pavement marking removing (W)(arrow) (662-7082)EACH14$120.00$265.00$25.00$250.00$351.75$402.00$21.24
76Work zone pavement marking removing (W)(word) (662-7092)EACH6$130.00$265.00$25.00$250.00$525.00$600.00$23.60
77Work zone pavement marking removing (Y)6"(solid) (662-7100)LF16,356$1.00$1.05$1.00$1.00$1.84$2.10$0.79
78Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH45$10.00$10.00$1.50$2.00$4.58$1.44$1.00
79Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF412$1.00$1.40$1.00$1.30$5.25$6.00$1.02
80Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH5$200.00$190.00$120.00$178.00$210.00$240.00$121.05
81Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH5$200.00$230.00$200.00$215.00$367.50$420.00$181.57
82Pavement sler 6" (666-7347)LF18,002$1.00$0.25$0.30$0.24$0.53$0.60$0.23
83Pavement sler 8" (666-7348)LF412$1.00$0.40$0.40$0.35$1.05$1.20$0.29
84Pavement sler (arrow) (666-7353)EACH5$62.00$40.00$35.00$35.00$52.50$60.00$30.79
85Pavement sler (word) (666-7354)EACH5$74.00$45.00$38.00$43.00$63.00$72.00$34.20
86Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF3,906$1.00$1.00$1.00$0.87$2.10$2.40$0.84
87Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF6,633$1.00$1.00$1.00$0.87$1.58$1.80$0.84
88Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF7,463$1.00$1.00$1.00$0.87$1.58$1.80$0.79
89Reflectorized pavement marker type II-C-R (672-7006)EACH196$6.00$6.50$14.00$6.00$10.50$12.00$12.82
90Eliminating existing PM & markers (4") (677-7001)LF10,034$0.50$0.55$0.50$0.50$1.37$1.20$0.51
91Eliminating existing PM & markers (8") (677-7004)LF205$1.20$1.00$1.00$0.93$5.25$2.40$1.02
92Eliminating existing PM & markers (arrow) (677-7009)EACH2$75.00$55.00$18.00$52.00$210.00$180.00$15.52
93Eliminating existing PM & markers (word) (677-7015)EACH2$75.00$64.00$20.00$61.00$262.50$240.00$17.24
94Pavement surface preparation for marking (6") (678-7002)LF44,778$1.00$0.05$0.20$0.02$0.21$0.24$0.18
95Pavement surface preparation for marking (8") (678-7004)LF1,974$1.00$0.10$0.30$0.09$1.05$1.20$0.24
96Pavement surface preparation for marking (24") (678-7008)LF66$1.00$0.70$3.00$0.66$3.15$3.60$2.75
97Pavement surface preparation for marking (arrow) (678-7009)EACH19$40.00$16.00$30.00$15.50$42.00$48.00$24.65
98Pavement surface preparation for marking (word) (678-7016)EACH11$45.00$19.00$30.00$18.50$52.50$60.00$27.40
99Tree removal (4" - 12" diameter) (752-7005)EACH9$300.00$2,000.00$5,000.00$750.00$787.50$287.54$76.57
TxDOT contract A00063792: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of January 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy