TxDOT letting results, September 8, 2022
63 contracts let by Texas DOT on September 8, 2022, $296,693,921 in low bids, a median of 4 bidders per contract. On the 63 with an engineer's estimate, the low bid came in under it 34 times; median low bid -3.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 63
- Low bids, total
- $296,693,921
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 09223242 | US 90 Resurface roadway from HORAL ST. to SL 353 | San Antonio District | 5 | Austin Bridge & Road Services, LP | $28,447,459 | $29,992,012 | +5.0% | -8.0% | TxDOT |
| 09223233 | BI 20-E Preventive maintenance from FM 1788 to 1 MILE EAST OF FM 1788 | Odessa District | 1 | Ragle Construction, Inc. | $27,863,585 | +33% | TxDOT | ||
| 09223203 | US 67 Seal coat from 1.1 MI EAST OF SH 329 to REAGAN COUNTY LINE | Odessa District | 3 | Cox Paving of Texas, Inc. | $18,404,585 | $19,509,486 | +6.0% | +37% | TxDOT |
| 09223201 | FM 506 Rehabilitate existing roadway from BUS 83 to FM 3067 | Pharr District | 4 | Foremost Paving, Inc. | $15,785,772 | $16,938,321 | +7.0% | 0.0% | TxDOT |
| 09223238 | FM 1099 Respore existing pavement from US 281A to FM 99 | San Antonio District | 3 | Hunter Industries, LTD. | $14,508,839 | $15,483,190 | +7.0% | +3.0% | TxDOT |
| 09223226 | SH 153 Widen road - add lanes from NOLAN COUNTY LINE to RUNNELS COUNTY LINE | Abilene District | 3 | Nobles Road Construction, Inc. | $14,078,927 | $15,226,206 | +8.0% | +19% | TxDOT |
| 09223202 | US 290 Seal coat from W OF MILLER CREEK CEMETERY RD to BLANCO/HAYS COUNTY LINE | Austin District | 4 | Hunter Industries, LTD. | $13,188,476 | $13,294,729 | +1.0% | -3.0% | TxDOT |
| 09223243 | FM 2688 Base, acp, grad, str, pav mrks, signs from 4.356 MILES WEST OF US 83 to 8.712 MILES WEST OF US 83 | Laredo District | 4 | Hunter Industries, LTD. | $12,957,925 | $13,761,372 | +6.0% | -31% | TxDOT |
| 09223207 | SH 87 Transportation non-roadway from 0.24 MILES WEST OF SH 124 to 2.21 MILES WEST OF SH 124 | Houston District | 11 | Brizo Construction, LLC | $9,010,882 | $9,257,403 | +3.0% | +12% | TxDOT |
| 09223206 | SH 349 Seal coat from TERRELL COUNTY LINE to TEXAS STATE LINE | Odessa District | 4 | Ronald R. Wagner & Co., LP | $8,865,264 | $9,374,399 | +6.0% | +25% | TxDOT |
| 09223231 | RM 1061 Preventive maintenance from RM 2381 to TO 10.5 MILES NORTH | Amarillo District | 5 | RK Hall, LLC | $7,909,237 | $8,332,385 | +5.0% | +1.0% | TxDOT |
| 09223235 | FM 1954 Surfacing/roadway restoration from US 281 to CLAY COUNTY LINE | Wichita Falls District | 4 | A. L. Helmcamp, Inc. | $7,814,964 | $8,792,000 | +13% | +6.0% | TxDOT |
| 09223234 | US 183 Adding shoulders with no added capacity from US 277 to THROCKMORTON CL | Wichita Falls District | 3 | Zack Burkett Co. | $7,724,537 | $7,914,884 | +2.0% | +12% | TxDOT |
| 09223237 | FM 1377 Repair roadway from MAIN STREET to FM 545 | Dallas District | 3 | A. K. Gillis & Sons, LLC | $7,597,593 | $8,520,347 | +12% | +13% | TxDOT |
| 09223232 | FM 271 Rehabilitate existing roadway from SH 78 to PR 24 | Paris District | 3 | D. L. Lennon Incorporated - Contractor | $7,082,890 | $7,439,804 | +5.0% | -9.0% | TxDOT |
| 09223236 | IH 20 Preventive maintenance from JUST EAST OF US 87 RELIEF ROUTE to .5 MILES WEST OF SH 350 | Abilene District | 1 | RK Hall, LLC | $6,527,873 | +27% | TxDOT | ||
| 09223240 | US 377 Preventive maintenance from RR TRACKS,S OF SUMMIT RIDGE RD to N OF FM 243 | Austin District | 4 | Big Creek Construction, LTD. | $6,087,040 | $6,232,361 | +2.0% | -1.0% | TxDOT |
| 09223211 | IH 69 Bridge replacement from AT OYSTER CREEK | Houston District | 5 | NBG Constructors, Inc. | $5,893,967 | $6,794,244 | +15% | +46% | TxDOT |
| 09223241 | US 183 Preventive maintenance from 0.28 MI S OF MLK JR/INDUSTRIAL BLVD to 0.60 MI SOUTH OF CR 207 | Austin District | 3 | Lone Star Paving Company | $5,467,487 | $5,688,449 | +4.0% | -2.0% | TxDOT |
| 09223208 | SH 16 Surfacing/roadway restoration from 6.302 MI S OF RM 501 to SH 29 | Austin District | 5 | Big Creek Construction, LTD. | $5,354,596 | $5,419,466 | +1.0% | +18% | TxDOT |
| 09223205 | US 83 Preventive maintenance from NEAR 10TH ST to NEAR 13TH ST | Abilene District | 4 | Foutsco Paving Company, LLC | $5,224,760 | $5,533,925 | +6.0% | -14% | TxDOT |
| 09223209 | VA Install traffic signal from VARIOUS LOCATIONS to IN THE DALLAS DISTRICT | Dallas District | 3 | Durable Specialties, Inc. | $4,521,288 | $6,122,650 | +35% | +29% | TxDOT |
| 09224206 | SH0021 Limestone rock asphalt (material only) from VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT | Austin District | 1 | Vulcan Construction Materials, LLC | $4,236,352 | +13% | TxDOT | ||
| 09224219 | SH0317 Pavement markings from VARIOUS ROADWAYS to DISTRICTWIDE | Waco District | 3 | Pavement Markings Inc. | $4,082,624 | $4,287,160 | +5.0% | +21% | TxDOT |
| 09223210 | FM 1421 Seal coat from SH 100 to FM 1732 | Pharr District | 2 | Ronald R. Wagner & Co., LP | $3,309,037 | $3,421,212 | +3.0% | -4.0% | TxDOT |
| 09223212 | FM 649 Seal coat from SH 16 to FM 2687 | Pharr District | 2 | Brannan Paving Co., LTD. | $3,295,336 | $3,336,380 | +1.0% | +7.0% | TxDOT |
| 09224216 | IH0035 Signal materials from VARIOUS LOCATIONS IN EAST AND WEST to MAINTENANCE SECTIONS | San Antonio District | 1 | Am Signal, LLC | $2,637,739 | -10% | TxDOT | ||
| 09223213 | SH 6 Rehabilitation of existing roadway from SOUTH WICHITA RIVER BRIDGE, SOUTH to 200 ' N OF US 82 | Childress District | 3 | Zack Burkett Co. | $2,633,874 | $2,695,119 | +2.0% | -17% | TxDOT |
| 09223219 | FM 487 Seal coat from SH 195 BYPASS to CR 233 | Austin District | 2 | Lone Star Paving Company | $2,349,410 | $3,203,809 | +36% | -4.0% | TxDOT |
| 09223214 | VA Install traffic signal from VARIOUS LOCATIONS IN TRAVIS COUNTY to VARIOUS LOCATIONS IN TRAVIS COUNTY | Austin District | 1 | Austin Traffic Signal Construction Co., Inc. | $2,342,776 | +2.0% | TxDOT | ||
| 09224208 | US0290 Repair and/or upgrade of metal beam guard fence from VARIOUS LOCATIONS IN BASTROP, to CALDWELL, AND LEE COUNTIES | Austin District | 2 | BK Field Operations LLC | $2,144,000 | $3,142,441 | +47% | -22% | TxDOT |
| 09224221 | US0287 Flexible pavement structure repair from US77 AT to CHAMBERS CREEK | Dallas District | 4 | Foutsco Paving Company, LLC | $1,995,581 | $2,340,506 | +17% | +3.0% | TxDOT |
| 09223217 | US 80 Installing median barrier from SL 281 to TOM BROWN PARKWAY | Atlanta District | 5 | Massana Construction Inc. | $1,862,982 | $1,904,571 | +2.0% | -15% | TxDOT |
| 09224207 | SH0029 Limestone rock asphalt (material only) from VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT | Austin District | 1 | Vulcan Construction Materials, LLC | $1,812,615 | +4.0% | TxDOT | ||
| 09223215 | FM 2978 Advanced traffic management system from FM 1488 to HARRIS C/L | Houston District | 6 | Traf-Tex, Inc. | $1,697,989 | $1,873,835 | +10% | -5.0% | TxDOT |
| 09224220 | SH0317 Miscellaneous concrete repair from VARIOUS LOCATIONS to ACROSS DISTRICT | Waco District | 6 | Beck-Reit & Sons, LTD. | $1,608,702 | $1,614,100 | 0.0% | -13% | TxDOT |
| 09223221 | FM 535 Resurface roadway from FM 304 to SH 95 | Austin District | 5 | Hunter Industries, LTD. | $1,577,805 | $1,655,946 | +5.0% | +6.0% | TxDOT |
| 09223218 | SH 42 Resurface roadway from GREGG C/L, S to BU 259 | Tyler District | 4 | Madden Contracting Company, LLC. | $1,527,949 | $1,615,345 | +6.0% | +9.0% | TxDOT |
| 09224217 | SH0173 Flexible pavement structure repair from VARIOUS LOCATIONS IN KERR, BANDERA, to KENDALL AND UVALDE COUNTIES | San Antonio District | 5 | Texas Materials Group, Inc. | $1,410,326 | $1,529,692 | +8.0% | +35% | TxDOT |
| 09224218 | IH0035 Flexible pavement structure repair from VARIOUS LOCATIONS IN to BEXAR COUNTY | San Antonio District | 5 | Texas Materials Group, Inc. | $1,270,874 | $1,296,139 | +2.0% | +25% | TxDOT |
| 09224223 | IH0035E Illumination maintenance from VARIOUS ROADWAYS IN THE to THE NAVARRO COUNTY OFFICES | Dallas District | 1 | Highway Intelligent Traffic Solutions, Inc. | $1,141,068 | -5.0% | TxDOT | ||
| 09224209 | US0096 Pavement markings from DISTRICTWIDE to DISTRICTWIDE | Beaumont District | 5 | Barricades Unlimited | $1,107,270 | $1,398,240 | +26% | -30% | TxDOT |
| 09224222 | SH0031 Full depth concrete repair from VARIOUS ROADWAYS IN THE to NAVARRO COUNTY MAINTENANCE SECTION | Dallas District | 4 | Roy Jorgensen Associates, Inc. | $1,072,475 | $1,320,351 | +23% | -7.0% | TxDOT |
| 09224210 | SS0215 Rehabilitation of existing roadway from 800 N 25 TH STREET to 50 FEET BEFORE THE REALROAD | Beaumont District | 2 | Select Maintenance, L.L.C. | $1,052,781 | $1,246,748 | +18% | -3.0% | TxDOT |
| 09223239 | RM 1826 Preventive maintenance from 0.136 MI N OF NUTTY BROWN ROAD to 0.4 MI S OF DARDEN HILLS | Austin District | 4 | Lone Star Paving Company | $1,052,439 | $1,084,750 | +3.0% | +4.0% | TxDOT |
| 09224212 | FM0170 Limestone rock asphalt from VARIOUS LOCATIONS to VARIOUS LOCATIONS | El Paso District | 1 | Vulcan Construction Materials, LLC | $1,044,948 | +4.0% | TxDOT | ||
| 09224201 | US0077 Debris removal from DISTRICTWIDE to DISTRICTWIDE | Corpus Christi District | 5 | Global Emergency Services, LLC. | $793,938 | $892,996 | +12% | -34% | TxDOT |
| 09223230 | VA Preventive maintenance from DISTRICT WIDE | Amarillo District | 3 | D & M Contractors, LLC | $781,621 | $871,086 | +11% | -12% | TxDOT |
| 09223225 | FM 1625 Resurface roadway from 0.2 MILES NORTH OF COULVER LANE to 0.3 MILES SOUTH OF COULVER LANE | Austin District | 2 | Lone Star Paving Company | $755,872 | $866,574 | +15% | +27% | TxDOT |
| 09224202 | US0077 Debris removal from DISTRICTWIDE to DISTRICTWIDE | Pharr District | 4 | Global Emergency Services, LLC. | $696,553 | $786,796 | +13% | -31% | TxDOT |
| 09223220 | VA Traffic signal improvements from DISTRICTWIDE | Yoakum District | 7 | TRP Construction Group, LLC | $665,411 | $698,806 | +5.0% | -35% | TxDOT |
| 09224211 | US0190 Metal beam guard fence repair from US 190 to VARIOUS ROADS IN JASPER, NEWTON, TY | Beaumont District | 3 | Milstead Highway Services, LLC | $605,073 | $692,435 | +14% | -14% | TxDOT |
| 09223223 | SH 35 Hazard elimination & safety from 0.1 MI W OF GLENSTEIN DR to 0.1 MI E OF GLENSTEIN DR | Houston District | 5 | Traf-Tex, Inc. | $542,422 | $550,162 | +1.0% | -18% | TxDOT |
| 09223227 | VA Bridge maintenance from VARIOUS LOCATIONS DISTRICTWIDE | Lufkin District | 6 | THK Construction LLC | $439,626 | $463,875 | +6.0% | -15% | TxDOT |
| 09224213 | US0059 Bridge preventative maintenance from WITHIN THE LUFKIN DISTRICT to VARIOUS LOCATIONS | Lufkin District | 10 | Garret Shields Infrastructure | $428,990 | $439,220 | +2.0% | -21% | TxDOT |
| 09223224 | SL 230 Construct pedestrian infrastructure from MCSWEENEY STREET to GRESHAM STREET | Austin District | 5 | 3LW Civil LLC | $375,774 | $442,757 | +18% | -5.0% | TxDOT |
| 09224215 | IH0020 Cable median barrier system repair from VARIOUS to VARIOUS | Odessa District | 5 | Above All Construction | $356,600 | $364,404 | +2.0% | -8.0% | TxDOT |
| 09224214 | IH0020 Cable median barrier system repair from VARIOUS to VARIOUS | Odessa District | 5 | Above All Construction | $355,600 | $364,934 | +3.0% | -8.0% | TxDOT |
| 09224203 | IH0035 Tic public water system ground storage from LAREDO TRAVEL INFORMATION CENTER to LAREDO TRAVEL INFORMATION CENTER | Laredo District | 2 | Newton Diversified LLC | $350,000 | $400,000 | +14% | +27% | TxDOT |
| 09224204 | IH0030 Tree removal from VARIOUS ROADWAYS IN to BOWIE & CASS COUNTIES | Atlanta District | 5 | Catocon, Inc. | $299,104 | $329,474 | +10% | -20% | TxDOT |
| 09224205 | US0259 Tree removal from VARIOUS ROADWAYS IN to CAMP,CASS,MARION,MORRIS,TITUS & UPS | Atlanta District | 6 | Catocon, Inc. | $279,524 | $380,400 | +36% | -26% | TxDOT |
| 09223228 | VARIOUS Landscape development from VARIOUS LOCATIONS ON to SL 281 IN GREGG CO. | Tyler District | 2 | Tight Line Construction, LLC | $198,617 | $214,521 | +8.0% | -6.0% | TxDOT |
| 09223229 | IH 69 Hazard elimination & safety from IH 10 EB to IH 69 NB | Houston District | 6 | Republic Traffic Safety, Inc. | $184,301 | $209,594 | +14% | -4.0% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.