Brizo Construction, LLC: TxDOT bid record
Brizo Construction, LLC submitted 13 bids on Texas DOT contracts in the data, from 03 MAR 2022 to 04 NOV 2026, and was the low bidder on 4 of them (31%). When it was not low, its total sat a median +27% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $29,620,766
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 7 | 3 | 43% |
| 2023 | 5 | 1 | 20% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 11 | 3 | 27% |
| Corpus Christi District | 1 | 1 | 100% |
| Bryan District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Pavement surface preparation for marking (word) | 678-7016 | EACH | 8 | 5 (63%) | $5.78 | $20.00 |
| Curb ramps (type 7) | 531-7010 | EACH | 6 | 5 (83%) | $1,386.00 | $2,500.00 |
| Pavement sealer 24" | 666-6230-007 | LF | 6 | 4 (67%) | $0.58 | $2.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 12 | 3 (25%) | $5,050.00 | $5,000.00 |
| Pavement surface preparation for marking (6") | 678-7002 | LF | 8 | 3 (38%) | $0.04 | $0.18 |
| Pavement surface preparation for marking (arrow) | 678-7009 | EACH | 8 | 3 (38%) | $5.67 | $20.00 |
| Removing structure (pipe) | 496-7007 | LF | 7 | 3 (43%) | $15.00 | $24.00 |
| Pavement surface preparation for marking (8") | 678-7004 | LF | 7 | 3 (43%) | $0.05 | $0.20 |
| Reflectorized pavement marking type I (W)24"(solid)(100MIL) | 666-7036 | LF | 6 | 3 (50%) | $8.88 | $8.00 |
| Ground box type D (162922)W/apron | 624-7008 | EACH | 6 | 3 (50%) | $1,205.06 | $1,441.60 |
| Eliminating existing pavement marking & markers (arrow) | 677-6008 | EACH | 6 | 3 (50%) | $58.37 | $61.11 |
| Tray cable (4 conductor) (12 AWG) | 621-7006 | LF | 6 | 3 (50%) | $2.91 | $2.65 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Main Lane Industries LTD. | 7 | 1 of 7 |
| Isi Contracting, Inc. | 7 | 2 of 7 |
| James Construction Group, LLC | 6 | 4 of 6 |
| R Construction Civil, LLC | 5 | 3 of 5 |
| Texas Materials Group, Inc. | 5 | 3 of 5 |
| Harper Brothers Construction LLC | 3 | 0 of 3 |
| Ser Construction Partners, LLC | 3 | 1 of 3 |
| Forde Construction Company, Inc. | 3 | 1 of 3 |
| Sterling Delaware Holding Company, Inc. | 3 | 3 of 3 |
| Garret Shields Infrastructure | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00124162 | Bryan District | Bridge Replacement, SH 30 (0.30 Mi. West of William D. Fitch to 0.66 Mi East of William D. Fitch) | 10 of 12 | $43,708,350 | +45% |
| 05 DEC 2023 | 12233030 | Houston District | VA Hazard elimination & safety from VARIOUS | 2 of 2 | $2,394,822 | +1.0% |
| 05 MAY 2023 | 05233214 | Houston District | FM 1960 Hazard elimination & safety from 0.369 MI E OF IH 45 to 0.179 MI W OF LEE RD | 1 of 4 | $5,127,652 | Low, 29% under the second |
| 04 MAY 2023 | 05233029 | Houston District | SH 288 Construct frontage roads from AIRPORT BLVD to SIMS BAYOU | 2 of 6 | $3,474,505 | +4.0% |
| 09 MAR 2023 | 03231201 | Houston District | SL0008 Concrete structure repair from PRESIDENTS DRIVE to FM 865 (CULLEN BLVD) | 3 of 5 | $114,775 | +31% |
| 08 MAR 2023 | 03234218 | Houston District | SL0008 Bridge scour repair from VARIOUS LOCATIONS to VARIOUS LOCATIONS | 6 of 8 | $4,424,924 | +35% |
| 02 DEC 2022 | 12223210 | Houston District | BS 288B Widen road - add shoulders from FM 523 to FM 521 | 5 of 5 | $14,689,720 | +34% |
| 01 DEC 2022 | 12223025 | Corpus Christi District | VA Construct pedestrian infrastructure from AT VARIOUS LOCATIONS IN KINGSVILLE to ON KENNEDY, LOTT, 17TH, 19TH, AND 2 | 1 of 6 | $797,184 | Low, 18% under the second |
| 02 NOV 2022 | 11223010 | Houston District | US 290 Construct frontage roads from NORTH OF FM 362 to JAMES MUSE PARKWAY | 6 of 8 | $11,807,251 | +8.0% |
| 08 SEP 2022 | 09223207 | Houston District | SH 87 Transportation non-roadway from 0.24 MILES WEST OF SH 124 to 2.21 MILES WEST OF SH 124 | 1 of 11 | $9,010,882 | Low, 3.0% under the second |
| 04 AUG 2022 | 08223253 | Houston District | US 290 Construct frontage roads from NORTH OF FM 362 to JAMES MUSE PARKWAY | 3 of 9 | $11,319,471 | +3.0% |
| 07 APR 2022 | 04223205 | Houston District | FM 1488 Hazard elimination & safety from IH 45 to MOSTYN DRIVE | 6 of 7 | $12,999,602 | +27% |
| 03 MAR 2022 | 03223004 | Houston District | FM 1960 Intersection improvements from AT ELDRIDGE PARKWAY | 1 of 8 | $14,685,048 | Low, 1.0% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.