TxDOT contract A00124162 bid tabulation

Bridge Replacement, SH 30 (0.30 Mi. West of William D. Fitch to 0.66 Mi East of William D. Fitch). Let by Texas DOT on November 4, 2026, Brazos, Bryan District. 12 bids received; low bid $30,209,876 by Fluor Enterprises, Inc., -4.8% against the engineer's estimate of $31,732,117.

Owner
Texas DOT
Letting
04 NOV 2026
Pay items
180
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Fluor Enterprises, Inc.$30,209,876Low-5.0%
2Big Creek Construction, LTD.$33,187,594+10%+5.0%
3Knife River Corporation - South$33,911,798+12%+7.0%
4R Construction Civil, LLC$34,862,676+15%+10%
5James Construction Group, LLC$39,237,828+30%+24%
6Texas Materials Group, Inc.$39,562,405+31%+25%
7A. L. Helmcamp, Inc.$39,630,699+31%+25%
8Posillico Civil, Inc.$39,994,995+32%+26%
9Zachry Construction Corporation$42,444,061+40%+34%
10Brizo Construction, LLC$43,708,350+45%+38%
11Granite Construction Company$44,387,970+47%+40%
12Isi Contracting, Inc.$48,396,973+60%+53%
TxDOT contract A00124162: bids by rank

Engineer's estimate: $31,732,117.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Fluor Enterprises, Inc.2. Big Creek Construction, LTD.3. Knife River Corporation - South4. R Construction Civil, LLC5. James Construction Group, LLC6. Texas Materials Group, Inc.
1Preparing row (100-7002)STA150.50$1,500.00$4,376.74$2,500.00$595.72$2,000.00$25,225$5,500.00
2Removing concrete (pavement) (104-7002)CY109$65.00$70.00$24.50$50.00$52.93$77.00
3Removing concrete (riprap) (104-7007)CY184$50.00$61.50$100.00$150.00$70.00$38.82$91.00
4Removing concrete (driveways) (104-7011)SY810$20.00$11.50$30.00$5.35$10.00$12.08$50.00
5Removing concrete (curb) (104-7016)LF107$6.50$25.00$3.00$20.00$4.45$33.00
6Remove (14"-18") TRT/untrt base & asphalt pavement (105-7014)SY64,084$10.00$6.50$5.00$0.72$16.50$3.84$9.00
7Remove (7") TRT/untrt base & asphalt pavement (105-7027)SY1,905$10.00$14.00$7.00$11.36$10.00$3.86$11.00
8Excavation (roadway) (110-7001)CY33,904$10.00$6.50$12.00$6.74$20.00$11.50$11.00
9Embankment (final)(DC)(type C) (132-7006)CY283,087$10.00$10.00$12.00$17.38$18.00$21.11$21.60
10Furn & place topsoil (4") (160-7002)SY166,415$1.00$1.95$1.00$0.84$4.50$0.67$1.00
11Bond fiber MTRX seed (temporary)(warm) (164-7077)SY83,209$0.55$0.50$0.56$0.65$0.65$0.60$0.90
12Bond fiber MTRX seed (temporary)(cool) (164-7078)SY83,208$0.55$0.50$0.56$0.65$0.65$0.60$0.90
13Bond fiber MTRX seed (permanent)(rural)(clay) (164-7083)SY166,415$0.65$0.55$0.60$0.67$0.65$0.62$0.95
14Vegetative watering (168-7001)TGL3,328.30$16.00$0.11$10.00$26.46$50.00$37.36$29.00
15FL BS (compacted in place)(type A GR 1-2) (9") (247-7350)SY123,992$24.00$20.50$23.00$24.60$20.00$25.50$33.00
16Cement (275-7001)TON2,113$215.00$185.00$220.00$215.85$220.00$217.31$216.00
17Cement TRT (subgrade)(10") (275-7028)SY128,047$3.00$2.05$2.20$1.03$1.65$1.59$2.00
18Prime coat (AE-P) (310-7001)GAL266$6.50$10.00$6.65$10.00$6.36$10.00
19Prime coat(MC-30 or AE-P) (310-7013)GAL24,532$6.00$4.20$5.00$4.47$4.50$4.24$5.25
20Asphalt (AC-20-5TR) (316-7007)GAL7,051$6.00$4.65$4.40$4.72$10.00$4.66$3.75
21Aggregate (type-PB, GR-3)(sac-A) (316-7134)CY133$175.00$231.00$300.00$241.00$250.00$233.20$546.00
22SP mixes SP-B PG64-22 (344-7001)TON33,968$89.00$94.50$100.00$106.70$100.00$95.40$116.00
23SP mixes SP-C sac-A PG70-22 (344-7020)TON14,424$110.00$116.00$114.00$131.67$125.00$116.60$130.00
24Planing asphalt concrete pavement(0" to 2") (354-7032)SY5,557$3.50$3.40$5.00$2.26$4.25$1.44$8.00
25Cem stabil BKFL (400-7010)CY1,247$175.00$110.00$155.00$181.00$110.00$99.35$152.00
26Flowable backfill (401-7001)CY5$500.00$900.00$300.00$158.00$690.00$703.66$388.00
27Temporary special shoring (403-7001)SF2,297$40.00$48.50$32.00$50.00$63.00$68.62$80.03
28Temporary special shoring (cofferdam) (403-7002)SF5,555$20.00$10.00$23.00$59.00$61.80$1.00
29Foundaton loadtest(D4945)(drilld shaft) (405-7003)EACH3$42,000$15,000$30,000$25,000$27,000$25,000$26,000
30Drilled shaft (18 in) (416-7002)LF540$150.00$73.00$100.00$110.00$240.00$63.04$106.00
31Drilled shaft (36 in) (416-7006)LF1,854$280.00$204.00$240.00$260.00$290.00$202.89$275.00
32Drilled shaft (42 in) (416-7007)LF3,649$300.00$281.00$320.00$330.00$310.00$282.71$346.00
33Drilled shaft (48 in) (416-7008)LF910$375.00$420.00$425.00$400.00$368.30$668.00
34Drilled shaft (traffic signal pole) (30 in) (416-7043)LF11$277.00$200.00$205.00$240.00$190.21$290.00
35Drilled shaft (traffic signal pole) (36 in) (416-7044)LF26$352.00$250.00$251.00$300.00$233.05$360.00
36Drilled shaft (traffic signal pole) (48 in) (416-7046)LF22$429.00$450.00$428.00$350.00$397.55$440.00
37Class C concrete (abutment) (420-7012)CY347.50$1,000.00$1,047.00$1,400.00$1,050.00$830.00$1,007.31$1,345.00
38Class C concrete (cap) (420-7022)CY421.50$1,100.00$1,378.00$1,600.00$1,350.00$960.00$1,528.26$1,615.00
39Class C concrete (column) (420-7038)CY201.10$1,400.00$1,321.00$1,600.00$1,250.00$1,540.00$1,144.63$1,780.00
40Reinforced concrete slab (422-7001)SF111,370$24.00$20.50$28.00$24.53$20.00$22.70$24.16
41Approach slab (422-7013)CY405$800.00$648.00$1,000.00$810.00$960.00$649.77$812.00
42Prestressed concrete girder (TX34) (425-7002)LF2,028$203.00$210.00$255.00$190.00$236.23$238.00
43Prestressed concrete girder (TX54) (425-7005)LF8,779.50$215.00$188.00$230.00$265.00$200.00$219.32$237.00
44Prestressed concrete girder (TX70) (425-7007)LF1,734$270.00$270.00$325.00$400.00$236.67$268.00
45Riprap (concrete)(4 in) (432-7001)CY226$669.00$680.00$720.35$560.00$545.56$645.00
46Riprap (mow strip)(4 in) (432-7013)CY100$700.00$675.00$700.00$800.00$540.00$777.43$819.00
47Riprap (stone protection)(18 in) (432-7043)CY6,840$150.00$134.00$140.00$164.00$160.00$187.57$215.00
48Rail (type SSTR) (450-7024)LF2,830$85.00$43.50$90.00$105.00$90.00$62.68$100.00
49Sealed expansion joint (4 in) (SEJ - M) (454-7004)LF688$220.00$236.00$225.00$220.00$180.00$182.71$210.00
50RC pipe (CL III)(18 in) (464-7003)LF464$70.00$80.50$72.00$50.00$70.00$98.22$80.00
51RC pipe (CL III)(24 in) (464-7005)LF74$90.00$99.00$92.00$79.00$110.00$118.75$90.00
52RC pipe (CL III)(36 in) (464-7009)LF230$178.00$182.00$211.00$160.00$209.14$130.00
53Headwall (CH - FW - 0) (diameter= 36 in) (466-7009)EACH1$8,000.00$9,000.00$11,640$10,000$8,642.06$11,000
54Set (type I) (36 in) (3: 1) (C) (467-7017)EACH2$4,650.00$9,800.00$12,625$3,500.00$5,409.83$11,000
55Set (type I) (36 in) (4: 1) (C) (467-7018)EACH2$5,750.00$13,300$13,950$4,000.00$5,665.29$12,000
56Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH20$1,300.00$2,117.00$1,650.00$1,485.00$2,000.00$2,324.98$2,500.00
57Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH2$2,200.00$2,414.00$2,200.00$1,935.00$3,500.00$4,007.50$2,900.00
58Removing structure (set) (496-7004)EACH17$650.00$692.00$365.00$393.00$840.00$601.84$625.00
59Removing structure (headwall) (496-7006)EACH2$3,840.00$1,700.00$1,439.00$2,520.00$4,719.64$3,645.00
60Removing structure (pipe) (496-7007)LF425$32.00$54.00$18.00$39.00$30.00$57.88$33.00
61Removing structure (bridge 100 - 499 FT length) (496-7010)EACH2$180,000$200,000$100,000$125,000$110,000$137,598$450,000
62Removing structure (bridge 500 - 999 FT length) (496-7011)EACH1$155,000$200,000$197,000$200,000$137,598$160,000
63Remove STR (drainage flume) (496-7035)EACH13$1,500.00$160.00$950.00$642.85$2,520.00$1,497.15$1,000.00
64Mobilization (500-7001)LS1$2,538,000$3,020,000$3,000,000$1,870,000$2,400,000$3,880,000$2,600,000
65Barricades, signs and traffic handling (502-7001)MO36$3,000.00$8,381.00$5,000.00$4,377.00$7,710.00$5,264.43$1,850.00
66Portable changeable message sign (503-7002)EACH3$7,000.00$3,480.00$12,000$21,770$21,630$11,398$9,000.00
67TMA (stationary) (505-7001)DAY392$250.00$492.00$200.00$450.00$220.00$238.05$250.00
68TMA (mobile operation) (505-7003)DAY38$600.00$706.00$500.00$800.00$1,050.00$655.52$250.00
69Rock filter dams (install) (type 2) (506-7002)LF1,739$40.00$40.00$42.00$43.00$50.00$40.00$41.00
70Rock filter dams (install) (type 4) (506-7004)LF380$60.00$56.00$65.00$54.00$50.00$50.00$66.00
71Rock filter dams (remove) (506-7011)LF2,119$10.00$18.00$5.00$11.83$20.00$11.00$11.00
72Construction exits (install) (type 1) (506-7020)SY336$36.00$50.00$38.00$41.94$40.00$39.00$37.00
73Construction exits (remove) (506-7024)SY336$10.00$11.00$5.00$11.83$10.00$11.00$13.00
74Temporary sediment control fence (install) (506-7039)LF21,709$4.00$3.30$4.00$4.30$4.00$4.00$3.50
75Temporary sediment control fence (remove) (506-7041)LF21,709$1.00$0.60$0.50$0.43$1.00$0.40$1.00
76Biodegradable erosion control logs (install) (6") (506-7042)LF42,131$2.00$3.15$4.00$5.37$6.00$4.99$4.00
77Biodegradable erosion control logs (remove) (506-7046)LF42,131$1.00$0.60$1.00$0.65$1.00$0.60$1.00
78Constructing detours (508-7001)SY5,819$90.00$83.00$80.00$75.92$85.00$85.79$82.00
79Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001)LF14,070$60.00$7.00$40.00$50.00$55.00$40.60$49.00
80Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025)LF5,100$15.00$9.00$6.50$2.00$6.00$6.23$6.50
81Portable concrete traffic barrier (stockpile)(single slope)(type 1) (512-7037)LF180$13.00$25.50$12.00$24.50$30.00$26.62$11.00
82Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049)LF14,070$13.00$10.50$11.00$7.00$9.00$5.86$13.50
83Concrete curb (type II) (529-7002)LF107$38.00$75.00$36.17$30.00$19.61$80.00
84Driveways (concrete) (530-7006)SY763$100.00$115.00$135.00$145.60$90.00$164.69$200.00
85Driveways (ACP) (530-7010)SY2,557$45.00$50.50$40.00$43.98$60.00$58.82$68.00
86Fill milled asphalt rumble strips (shoulder) (533-7005)LF9,750$3.00$7.50$1.80$2.35$3.25$4.00$12.00
87Fill milled asphalt RMBL strip(centerline) (533-7006)LF4,300$3.00$5.00$1.80$2.65$3.25$4.00$12.00
88Metal W-beam guard fence (timber post) (540-7001)LF1,012.50$29.00$25.50$32.00$25.80$30.00$24.00$27.00
89Metal beam guard fence trans (thrie-beam) (540-7005)EACH12$1,600.00$1,795.00$2,000.00$2,296.00$2,150.00$1,700.00$2,900.00
90Short radius (28") (540-7013)LF37.50$32.50$35.00$33.50$30.00$30.00$35.00
91Driveway terminal anchor section (540-7014)EACH1$1,309.00$1,500.00$1,334.00$1,470.00$1,350.00$1,600.00
92Downstream anchor terminal section (540-7015)EACH7$1,700.00$1,314.00$1,500.00$1,339.00$1,470.00$900.00$1,600.00
93Metal beam guard fence trans (31"-28")(25') (540-7031)EACH1$765.00$750.00$780.00$980.00$1,350.00$700.00
94Remove metal beam guard fence (542-7001)LF3,997.50$3.00$2.10$3.00$2.15$3.00$2.50$3.00
95RM metal beam guard fence trans (thrie-beam) (542-7004)EACH12$270.00$211.00$250.00$215.00$220.00$200.00$250.00
96Guardrail end treatment (install) (544-7001)EACH6$3,300.00$3,405.00$3,500.00$3,468.00$3,630.00$3,325.00$3,300.00
97Guardrail end treatment (remove) (544-7003)EACH12$250.00$211.00$250.00$215.00$220.00$200.00$250.00
98Crash cushion attenuator (move & reset) (545-7002)EACH22$1,200.00$2,058.00$2,000.00$2,957.00$920.00$2,000.00$1,000.00
99Crash cushion attenuator (remove) (545-7004)EACH23$1,000.00$335.00$1,500.00$1,344.00$610.00$800.00$400.00
100Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH23$8,000.00$7,055.00$8,000.00$8,817.00$7,500.00$8,200.00$6,000.00
101Gate (remove) (550-7016)EACH2$500.00$506.00$400.00$500.00$500.00$475.00$500.00
102Wire fence (type A) (552-7001)LF252$20.00$32.00$15.00$31.72$30.00$30.00$17.00
103Gate (type 1) (552-7006)EACH2$1,600.00$1,572.00$2,500.00$1,656.00$1,710.00$1,475.00$1,800.00
104Mailbox install-S (TWW-post) type 4 (560-7008)EACH4$330.00$518.00$300.00$269.00$410.00$250.00$250.00
105Mailbox install-M (TWW-post) type 4 (560-7010)EACH3$700.00$570.00$700.00$710.00$490.00$660.00$660.00
106Conduit (PVC) (schedule 80) (2") (618-7054)LF305$17.00$12.00$15.00$14.00$10.00$13.04$13.00
107Conduit (PVC) (schedule 80) (2") (bore) (618-7055)LF375$19.00$20.00$19.66$20.00$18.28$20.00
108Conduit (PVC) (schedule 80) (4") (618-7064)LF135$29.00$16.50$20.00$19.39$20.00$18.03$17.00
109Conduit (PVC) (schedule 80) (4") (bore) (618-7065)LF375$23.50$30.00$27.83$20.00$25.88$24.00
110Conduit (prepare) (618-7090)LF780$2.00$2.45$12.00$11.26$1.00$10.47$2.50
111Electrical conductor (no.8) insulated (620-7008)LF1,115$2.25$2.75$3.00$2.77$2.00$2.58$2.80
112Electrical conductor (no.6) insulated (620-7010)LF1,035$2.90$3.25$4.00$3.83$3.00$3.56$3.30
113Tray cable (4 conductor) (12 AWG) (621-7006)LF2,155$3.50$3.85$4.00$4.00$3.00$3.73$4.00
114Ground box type D (162922)W/apron (624-7008)EACH8$1,500.00$2,288.00$1,400.00$1,326.00$1,180.00$1,232.98$2,400.00
115Remove ground box (624-7013)EACH1$500.00$751.00$115.00$113.00$390.00$104.72$770.00
116Relocate electrical services (628-7001)EACH1$2,800.00$3,124.00$2,200.00$2,105.00$2,390.00$1,957.53$3,200.00
117Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148)EACH1$8,499.00$9,000.00$8,522.00$8,140.00$7,925.27$8,700.00
118Aluminum signs (type A) (636-7001)SF54.50$50.00$75.50$40.00$130.00$60.00$31.17$77.00
119Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH29$650.00$733.00$700.00$726.00$790.00$675.00$680.00
120Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH4$850.00$750.00$769.00$920.00$715.00$720.00
121Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH2$1,000.00$1,200.00$1,108.00$1,080.00$1,030.00$1,050.00
122Install small roadside sign support and assembly TYS80(1)SA(U-WC) (644-7035)EACH2$1,500.00$1,100.00$1,400.00$1,269.00$1,190.00$1,180.00$1,200.00
123Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057)EACH1$475.00$500.00$484.00$510.00$450.00$450.00
124Remove SM RD SN sup&AM (644-7073)EACH32$100.00$100.00$150.00$135.00$110.00$125.00$130.00
125Install delineator assembly (D-SW)SZ 1(WFLX)GF2 (658-7001)EACH22$25.00$38.00$30.00$22.00$30.00$20.00$36.00
126Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH26$19.00$20.00$20.00$18.00$20.00$16.00$17.00
127Install object marker assembly (OM-2Z)(WFLX)SRFHH (658-7257)EACH5$39.00$200.00$188.00$140.00$175.00$180.00
128Work zone pavement marking removing (W)6"(solid) (662-7068)LF56,793$0.80$1.00$1.00$0.62$1.00$0.97$1.00
129Work zone pavement marking removing (W)8"(DOT) (662-7070)LF252$4.65$2.00$1.50$0.98$2.00$1.25$1.30
130Work zone pavement marking removing (W)8"(solid) (662-7072)LF1,253$1.90$1.25$1.40$0.98$1.00$1.20$1.30
131Work zone pavement marking removing (W)24"(solid) (662-7077)LF236$11.00$12.00$9.00$7.00$10.00$8.00$8.00
132Work zone pavement marking removing (W)(arrow) (662-7082)EACH8$200.00$200.00$85.00$177.00$220.00$75.00$75.00
133Work zone pavement marking removing (W)(word) (662-7092)EACH8$230.00$200.00$100.00$210.00$220.00$95.00$95.00
134Work zone pavement marking removing (Y)6"(solid) (662-7100)LF70,372$0.80$1.00$1.00$0.62$1.00$0.97$1.00
135Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH5,504$1.60$1.50$1.50$1.00$0.10$5.00$1.00
136Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH4,897$1.70$1.00$1.50$1.00$0.10$5.00$1.00
137Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF696$1.60$1.00$0.70$0.67$1.00$0.65$0.65
138Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF2,422$1.40$1.00$1.20$1.02$1.00$1.10$1.15
139Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF117$11.00$10.00$8.00$8.00$10.00$7.25$7.30
140Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH13$190.00$200.00$180.00$177.00$220.00$165.00$170.00
141Reflectorized pavement marking type I(W)(lane drop arrow)(100MIL) (666-7060)EACH4$300.00$450.00$400.00$200.00$490.00$373.00$380.00
142Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH9$240.00$200.00$220.00$210.00$220.00$195.00$200.00
143Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF35,636$1.00$1.05$0.90$1.34$1.10$0.80$0.80
144Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270)LF41,725$1.00$1.05$0.90$1.34$1.10$0.80$0.86
145Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274)LF5,576$1.00$1.05$0.95$1.34$1.10$0.85$0.85
146Pavement sler 6" (666-7347)LF6,368$0.30$0.50$0.30$0.20$0.50$0.25$0.25
147Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF5,437$0.95$0.65$0.75$0.65$0.70$0.65$0.65
148Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF658$2.00$0.80$1.50$0.65$0.85$1.00$1.00
149PRFB rumble strip (BLK)(1')(centerline) (668-7002)LF360$5.00$6.00$16.40$10.00$5.00$5.00
150Reflectorized pavement marker type I-C (672-7002)EACH347$5.00$5.00$6.00$6.18$10.00$5.00$5.00
151Reflectorized pavement marker type II-A-A (672-7004)EACH1,675$5.75$5.00$6.00$6.18$10.00$5.00$5.00
152Eliminating existing PM & markers (4") (677-7001)LF24,562$0.60$0.55$1.20$0.31$0.60$1.00$1.00
153Pavement surface preparation for marking (6") (678-7002)LF6,368$0.35$0.20$0.85$0.16$0.25$0.75$0.75
154Install highway traffic signal (isolated) (680-7002)EACH1$40,860$33,000$32,927$31,400$30,622$42,000
155Removing traffic signals (680-7004)EACH1$7,672.00$3,000.00$2,855.00$4,560.00$2,655.03$8,000.00
156Install highway traffic signal (upgrade) (680-7011)EACH1$15,000$11,600$10,000$9,170.00$10,250$8,527.56$12,000
157Temporary traffic signals (681-7001)EACH1$80,000$27,190$85,000$80,440$103,030$74,807$28,000
158Vehicle signal section (12")LED(green arrow) (682-7002)EACH3$400.00$287.00$400.00$403.00$360.00$374.39$311.00
159Vehicle signal section (12")LED(yel) (682-7003)EACH4$287.00$400.00$396.00$360.00$368.10$311.00
160Vehicle signal section (12")LED(yel arrow) (682-7004)EACH3$400.00$287.00$400.00$403.00$360.00$374.39$311.00
161Vehicle signal section (12")LED(red) (682-7005)EACH7$400.00$287.00$400.00$396.00$360.00$368.11$311.00
162Backplate W/ref border(3 sec)(vent)aluminum (682-7042)EACH3$240.00$185.00$200.00$192.00$220.00$178.78$200.00
163Retrofit reflectorized border sheeting (3 sec) (682-7045)EACH4$225.00$88.00$200.00$192.00$300.00$178.79$95.00
164Retrofit reflectorized border sheeting (4 sec) (682-7046)EACH1$250.00$273.00$260.00$268.00$330.00$249.36$296.00
165Backplate W/reflectorized border (1SEC)(went)aluminum (682-7050)EACH8$146.00$150.00$142.00$150.00$132.17$159.00
166Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031)LF1,920$2.75$2.15$3.00$2.92$2.50$2.72$2.30
167Reloct RDSD FLSH BCN AM (solar PWRD) (685-7005)EACH1$3,400.00$4,432.00$3,500.00$3,257.00$2,590.00$3,028.53$4,810.00
168Ins traffic signal PL AM(S)1 arm(32')lum (686-7035)EACH1$14,390$14,500$14,770$16,000$13,735$15,000
169Ins traffic signal PL AM(S)1 arm(44') (686-7045)EACH1$15,320$15,000$15,460$17,610$14,378$16,000
170Ins traffic signal PL AM(S)1 arm(44')lum (686-7047)EACH1$17,600$17,000$17,974$19,970$16,715$18,000
171Ins traffic signal PL AM(S)1 arm(55')lum (686-7059)EACH1$39,140$40,000$40,614$44,870$37,770$40,000
172Removal of signal head assembly (690-7024)EACH2$250.00$400.00$100.00$80.00$100.00$73.85$434.00
173Removal of signal related signs (690-7027)EACH1$400.00$1,199.00$100.00$60.00$70.00$55.32$1,301.00
174Bonding course (3007-7001)GAL24,419$5.50$4.20$4.00$3.78$4.50$4.24$4.40
175Tip testing(drilled shaft) (4003-7001)EACH15$8,000.00$4,643.00$6,700.00$4,800.00$6,480.00$4,500.00$4,600.00
176Temporary construction access (4006-7001)LS1$395,000$450,000$330,000$452,000$3,440.00$290,824$20,000
177Bbu system (external battery cabinet) (6007-7001)EACH1$8,885.57$10,000$9,570.00$10,130$8,900.13$9,000.00
178Radar presence detector comm cable (6008-7009)LF900$4.00$3.40$3.50$3.22$1.30$2.99$3.50
179Ground box (prepare) (6013-7006)EACH2$750.00$565.00$450.00$450.00$470.00$418.78$600.00
180Ground box W/ apron (adjust) (6013-7008)EACH2$1,250.00$847.00$700.00$715.00$660.00$664.48$900.00
TxDOT contract A00124162: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of November 4, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy