TxDOT contract A00124162 bid tabulation
Bridge Replacement, SH 30 (0.30 Mi. West of William D. Fitch to 0.66 Mi East of William D. Fitch). Let by Texas DOT on November 4, 2026, Brazos, Bryan District. 12 bids received; low bid $30,209,876 by Fluor Enterprises, Inc., -4.8% against the engineer's estimate of $31,732,117.
- Owner
- Texas DOT
- Letting
- 04 NOV 2026
- Pay items
- 180
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Fluor Enterprises, Inc. | $30,209,876 | Low | -5.0% |
| 2 | Big Creek Construction, LTD. | $33,187,594 | +10% | +5.0% |
| 3 | Knife River Corporation - South | $33,911,798 | +12% | +7.0% |
| 4 | R Construction Civil, LLC | $34,862,676 | +15% | +10% |
| 5 | James Construction Group, LLC | $39,237,828 | +30% | +24% |
| 6 | Texas Materials Group, Inc. | $39,562,405 | +31% | +25% |
| 7 | A. L. Helmcamp, Inc. | $39,630,699 | +31% | +25% |
| 8 | Posillico Civil, Inc. | $39,994,995 | +32% | +26% |
| 9 | Zachry Construction Corporation | $42,444,061 | +40% | +34% |
| 10 | Brizo Construction, LLC | $43,708,350 | +45% | +38% |
| 11 | Granite Construction Company | $44,387,970 | +47% | +40% |
| 12 | Isi Contracting, Inc. | $48,396,973 | +60% | +53% |
Engineer's estimate: $31,732,117.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Fluor Enterprises, Inc. | 2. Big Creek Construction, LTD. | 3. Knife River Corporation - South | 4. R Construction Civil, LLC | 5. James Construction Group, LLC | 6. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 150.50 | $1,500.00 | $4,376.74 | $2,500.00 | $595.72 | $2,000.00 | $25,225 | $5,500.00 |
| 2 | Removing concrete (pavement) (104-7002) | CY | 109 | $65.00 | $70.00 | $24.50 | $50.00 | $52.93 | $77.00 | |
| 3 | Removing concrete (riprap) (104-7007) | CY | 184 | $50.00 | $61.50 | $100.00 | $150.00 | $70.00 | $38.82 | $91.00 |
| 4 | Removing concrete (driveways) (104-7011) | SY | 810 | $20.00 | $11.50 | $30.00 | $5.35 | $10.00 | $12.08 | $50.00 |
| 5 | Removing concrete (curb) (104-7016) | LF | 107 | $6.50 | $25.00 | $3.00 | $20.00 | $4.45 | $33.00 | |
| 6 | Remove (14"-18") TRT/untrt base & asphalt pavement (105-7014) | SY | 64,084 | $10.00 | $6.50 | $5.00 | $0.72 | $16.50 | $3.84 | $9.00 |
| 7 | Remove (7") TRT/untrt base & asphalt pavement (105-7027) | SY | 1,905 | $10.00 | $14.00 | $7.00 | $11.36 | $10.00 | $3.86 | $11.00 |
| 8 | Excavation (roadway) (110-7001) | CY | 33,904 | $10.00 | $6.50 | $12.00 | $6.74 | $20.00 | $11.50 | $11.00 |
| 9 | Embankment (final)(DC)(type C) (132-7006) | CY | 283,087 | $10.00 | $10.00 | $12.00 | $17.38 | $18.00 | $21.11 | $21.60 |
| 10 | Furn & place topsoil (4") (160-7002) | SY | 166,415 | $1.00 | $1.95 | $1.00 | $0.84 | $4.50 | $0.67 | $1.00 |
| 11 | Bond fiber MTRX seed (temporary)(warm) (164-7077) | SY | 83,209 | $0.55 | $0.50 | $0.56 | $0.65 | $0.65 | $0.60 | $0.90 |
| 12 | Bond fiber MTRX seed (temporary)(cool) (164-7078) | SY | 83,208 | $0.55 | $0.50 | $0.56 | $0.65 | $0.65 | $0.60 | $0.90 |
| 13 | Bond fiber MTRX seed (permanent)(rural)(clay) (164-7083) | SY | 166,415 | $0.65 | $0.55 | $0.60 | $0.67 | $0.65 | $0.62 | $0.95 |
| 14 | Vegetative watering (168-7001) | TGL | 3,328.30 | $16.00 | $0.11 | $10.00 | $26.46 | $50.00 | $37.36 | $29.00 |
| 15 | FL BS (compacted in place)(type A GR 1-2) (9") (247-7350) | SY | 123,992 | $24.00 | $20.50 | $23.00 | $24.60 | $20.00 | $25.50 | $33.00 |
| 16 | Cement (275-7001) | TON | 2,113 | $215.00 | $185.00 | $220.00 | $215.85 | $220.00 | $217.31 | $216.00 |
| 17 | Cement TRT (subgrade)(10") (275-7028) | SY | 128,047 | $3.00 | $2.05 | $2.20 | $1.03 | $1.65 | $1.59 | $2.00 |
| 18 | Prime coat (AE-P) (310-7001) | GAL | 266 | $6.50 | $10.00 | $6.65 | $10.00 | $6.36 | $10.00 | |
| 19 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 24,532 | $6.00 | $4.20 | $5.00 | $4.47 | $4.50 | $4.24 | $5.25 |
| 20 | Asphalt (AC-20-5TR) (316-7007) | GAL | 7,051 | $6.00 | $4.65 | $4.40 | $4.72 | $10.00 | $4.66 | $3.75 |
| 21 | Aggregate (type-PB, GR-3)(sac-A) (316-7134) | CY | 133 | $175.00 | $231.00 | $300.00 | $241.00 | $250.00 | $233.20 | $546.00 |
| 22 | SP mixes SP-B PG64-22 (344-7001) | TON | 33,968 | $89.00 | $94.50 | $100.00 | $106.70 | $100.00 | $95.40 | $116.00 |
| 23 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 14,424 | $110.00 | $116.00 | $114.00 | $131.67 | $125.00 | $116.60 | $130.00 |
| 24 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 5,557 | $3.50 | $3.40 | $5.00 | $2.26 | $4.25 | $1.44 | $8.00 |
| 25 | Cem stabil BKFL (400-7010) | CY | 1,247 | $175.00 | $110.00 | $155.00 | $181.00 | $110.00 | $99.35 | $152.00 |
| 26 | Flowable backfill (401-7001) | CY | 5 | $500.00 | $900.00 | $300.00 | $158.00 | $690.00 | $703.66 | $388.00 |
| 27 | Temporary special shoring (403-7001) | SF | 2,297 | $40.00 | $48.50 | $32.00 | $50.00 | $63.00 | $68.62 | $80.03 |
| 28 | Temporary special shoring (cofferdam) (403-7002) | SF | 5,555 | $20.00 | $10.00 | $23.00 | $59.00 | $61.80 | $1.00 | |
| 29 | Foundaton loadtest(D4945)(drilld shaft) (405-7003) | EACH | 3 | $42,000 | $15,000 | $30,000 | $25,000 | $27,000 | $25,000 | $26,000 |
| 30 | Drilled shaft (18 in) (416-7002) | LF | 540 | $150.00 | $73.00 | $100.00 | $110.00 | $240.00 | $63.04 | $106.00 |
| 31 | Drilled shaft (36 in) (416-7006) | LF | 1,854 | $280.00 | $204.00 | $240.00 | $260.00 | $290.00 | $202.89 | $275.00 |
| 32 | Drilled shaft (42 in) (416-7007) | LF | 3,649 | $300.00 | $281.00 | $320.00 | $330.00 | $310.00 | $282.71 | $346.00 |
| 33 | Drilled shaft (48 in) (416-7008) | LF | 910 | $375.00 | $420.00 | $425.00 | $400.00 | $368.30 | $668.00 | |
| 34 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 11 | $277.00 | $200.00 | $205.00 | $240.00 | $190.21 | $290.00 | |
| 35 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 26 | $352.00 | $250.00 | $251.00 | $300.00 | $233.05 | $360.00 | |
| 36 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 22 | $429.00 | $450.00 | $428.00 | $350.00 | $397.55 | $440.00 | |
| 37 | Class C concrete (abutment) (420-7012) | CY | 347.50 | $1,000.00 | $1,047.00 | $1,400.00 | $1,050.00 | $830.00 | $1,007.31 | $1,345.00 |
| 38 | Class C concrete (cap) (420-7022) | CY | 421.50 | $1,100.00 | $1,378.00 | $1,600.00 | $1,350.00 | $960.00 | $1,528.26 | $1,615.00 |
| 39 | Class C concrete (column) (420-7038) | CY | 201.10 | $1,400.00 | $1,321.00 | $1,600.00 | $1,250.00 | $1,540.00 | $1,144.63 | $1,780.00 |
| 40 | Reinforced concrete slab (422-7001) | SF | 111,370 | $24.00 | $20.50 | $28.00 | $24.53 | $20.00 | $22.70 | $24.16 |
| 41 | Approach slab (422-7013) | CY | 405 | $800.00 | $648.00 | $1,000.00 | $810.00 | $960.00 | $649.77 | $812.00 |
| 42 | Prestressed concrete girder (TX34) (425-7002) | LF | 2,028 | $203.00 | $210.00 | $255.00 | $190.00 | $236.23 | $238.00 | |
| 43 | Prestressed concrete girder (TX54) (425-7005) | LF | 8,779.50 | $215.00 | $188.00 | $230.00 | $265.00 | $200.00 | $219.32 | $237.00 |
| 44 | Prestressed concrete girder (TX70) (425-7007) | LF | 1,734 | $270.00 | $270.00 | $325.00 | $400.00 | $236.67 | $268.00 | |
| 45 | Riprap (concrete)(4 in) (432-7001) | CY | 226 | $669.00 | $680.00 | $720.35 | $560.00 | $545.56 | $645.00 | |
| 46 | Riprap (mow strip)(4 in) (432-7013) | CY | 100 | $700.00 | $675.00 | $700.00 | $800.00 | $540.00 | $777.43 | $819.00 |
| 47 | Riprap (stone protection)(18 in) (432-7043) | CY | 6,840 | $150.00 | $134.00 | $140.00 | $164.00 | $160.00 | $187.57 | $215.00 |
| 48 | Rail (type SSTR) (450-7024) | LF | 2,830 | $85.00 | $43.50 | $90.00 | $105.00 | $90.00 | $62.68 | $100.00 |
| 49 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 688 | $220.00 | $236.00 | $225.00 | $220.00 | $180.00 | $182.71 | $210.00 |
| 50 | RC pipe (CL III)(18 in) (464-7003) | LF | 464 | $70.00 | $80.50 | $72.00 | $50.00 | $70.00 | $98.22 | $80.00 |
| 51 | RC pipe (CL III)(24 in) (464-7005) | LF | 74 | $90.00 | $99.00 | $92.00 | $79.00 | $110.00 | $118.75 | $90.00 |
| 52 | RC pipe (CL III)(36 in) (464-7009) | LF | 230 | $178.00 | $182.00 | $211.00 | $160.00 | $209.14 | $130.00 | |
| 53 | Headwall (CH - FW - 0) (diameter= 36 in) (466-7009) | EACH | 1 | $8,000.00 | $9,000.00 | $11,640 | $10,000 | $8,642.06 | $11,000 | |
| 54 | Set (type I) (36 in) (3: 1) (C) (467-7017) | EACH | 2 | $4,650.00 | $9,800.00 | $12,625 | $3,500.00 | $5,409.83 | $11,000 | |
| 55 | Set (type I) (36 in) (4: 1) (C) (467-7018) | EACH | 2 | $5,750.00 | $13,300 | $13,950 | $4,000.00 | $5,665.29 | $12,000 | |
| 56 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 20 | $1,300.00 | $2,117.00 | $1,650.00 | $1,485.00 | $2,000.00 | $2,324.98 | $2,500.00 |
| 57 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 2 | $2,200.00 | $2,414.00 | $2,200.00 | $1,935.00 | $3,500.00 | $4,007.50 | $2,900.00 |
| 58 | Removing structure (set) (496-7004) | EACH | 17 | $650.00 | $692.00 | $365.00 | $393.00 | $840.00 | $601.84 | $625.00 |
| 59 | Removing structure (headwall) (496-7006) | EACH | 2 | $3,840.00 | $1,700.00 | $1,439.00 | $2,520.00 | $4,719.64 | $3,645.00 | |
| 60 | Removing structure (pipe) (496-7007) | LF | 425 | $32.00 | $54.00 | $18.00 | $39.00 | $30.00 | $57.88 | $33.00 |
| 61 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 2 | $180,000 | $200,000 | $100,000 | $125,000 | $110,000 | $137,598 | $450,000 |
| 62 | Removing structure (bridge 500 - 999 FT length) (496-7011) | EACH | 1 | $155,000 | $200,000 | $197,000 | $200,000 | $137,598 | $160,000 | |
| 63 | Remove STR (drainage flume) (496-7035) | EACH | 13 | $1,500.00 | $160.00 | $950.00 | $642.85 | $2,520.00 | $1,497.15 | $1,000.00 |
| 64 | Mobilization (500-7001) | LS | 1 | $2,538,000 | $3,020,000 | $3,000,000 | $1,870,000 | $2,400,000 | $3,880,000 | $2,600,000 |
| 65 | Barricades, signs and traffic handling (502-7001) | MO | 36 | $3,000.00 | $8,381.00 | $5,000.00 | $4,377.00 | $7,710.00 | $5,264.43 | $1,850.00 |
| 66 | Portable changeable message sign (503-7002) | EACH | 3 | $7,000.00 | $3,480.00 | $12,000 | $21,770 | $21,630 | $11,398 | $9,000.00 |
| 67 | TMA (stationary) (505-7001) | DAY | 392 | $250.00 | $492.00 | $200.00 | $450.00 | $220.00 | $238.05 | $250.00 |
| 68 | TMA (mobile operation) (505-7003) | DAY | 38 | $600.00 | $706.00 | $500.00 | $800.00 | $1,050.00 | $655.52 | $250.00 |
| 69 | Rock filter dams (install) (type 2) (506-7002) | LF | 1,739 | $40.00 | $40.00 | $42.00 | $43.00 | $50.00 | $40.00 | $41.00 |
| 70 | Rock filter dams (install) (type 4) (506-7004) | LF | 380 | $60.00 | $56.00 | $65.00 | $54.00 | $50.00 | $50.00 | $66.00 |
| 71 | Rock filter dams (remove) (506-7011) | LF | 2,119 | $10.00 | $18.00 | $5.00 | $11.83 | $20.00 | $11.00 | $11.00 |
| 72 | Construction exits (install) (type 1) (506-7020) | SY | 336 | $36.00 | $50.00 | $38.00 | $41.94 | $40.00 | $39.00 | $37.00 |
| 73 | Construction exits (remove) (506-7024) | SY | 336 | $10.00 | $11.00 | $5.00 | $11.83 | $10.00 | $11.00 | $13.00 |
| 74 | Temporary sediment control fence (install) (506-7039) | LF | 21,709 | $4.00 | $3.30 | $4.00 | $4.30 | $4.00 | $4.00 | $3.50 |
| 75 | Temporary sediment control fence (remove) (506-7041) | LF | 21,709 | $1.00 | $0.60 | $0.50 | $0.43 | $1.00 | $0.40 | $1.00 |
| 76 | Biodegradable erosion control logs (install) (6") (506-7042) | LF | 42,131 | $2.00 | $3.15 | $4.00 | $5.37 | $6.00 | $4.99 | $4.00 |
| 77 | Biodegradable erosion control logs (remove) (506-7046) | LF | 42,131 | $1.00 | $0.60 | $1.00 | $0.65 | $1.00 | $0.60 | $1.00 |
| 78 | Constructing detours (508-7001) | SY | 5,819 | $90.00 | $83.00 | $80.00 | $75.92 | $85.00 | $85.79 | $82.00 |
| 79 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 14,070 | $60.00 | $7.00 | $40.00 | $50.00 | $55.00 | $40.60 | $49.00 |
| 80 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 5,100 | $15.00 | $9.00 | $6.50 | $2.00 | $6.00 | $6.23 | $6.50 |
| 81 | Portable concrete traffic barrier (stockpile)(single slope)(type 1) (512-7037) | LF | 180 | $13.00 | $25.50 | $12.00 | $24.50 | $30.00 | $26.62 | $11.00 |
| 82 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 14,070 | $13.00 | $10.50 | $11.00 | $7.00 | $9.00 | $5.86 | $13.50 |
| 83 | Concrete curb (type II) (529-7002) | LF | 107 | $38.00 | $75.00 | $36.17 | $30.00 | $19.61 | $80.00 | |
| 84 | Driveways (concrete) (530-7006) | SY | 763 | $100.00 | $115.00 | $135.00 | $145.60 | $90.00 | $164.69 | $200.00 |
| 85 | Driveways (ACP) (530-7010) | SY | 2,557 | $45.00 | $50.50 | $40.00 | $43.98 | $60.00 | $58.82 | $68.00 |
| 86 | Fill milled asphalt rumble strips (shoulder) (533-7005) | LF | 9,750 | $3.00 | $7.50 | $1.80 | $2.35 | $3.25 | $4.00 | $12.00 |
| 87 | Fill milled asphalt RMBL strip(centerline) (533-7006) | LF | 4,300 | $3.00 | $5.00 | $1.80 | $2.65 | $3.25 | $4.00 | $12.00 |
| 88 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,012.50 | $29.00 | $25.50 | $32.00 | $25.80 | $30.00 | $24.00 | $27.00 |
| 89 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 12 | $1,600.00 | $1,795.00 | $2,000.00 | $2,296.00 | $2,150.00 | $1,700.00 | $2,900.00 |
| 90 | Short radius (28") (540-7013) | LF | 37.50 | $32.50 | $35.00 | $33.50 | $30.00 | $30.00 | $35.00 | |
| 91 | Driveway terminal anchor section (540-7014) | EACH | 1 | $1,309.00 | $1,500.00 | $1,334.00 | $1,470.00 | $1,350.00 | $1,600.00 | |
| 92 | Downstream anchor terminal section (540-7015) | EACH | 7 | $1,700.00 | $1,314.00 | $1,500.00 | $1,339.00 | $1,470.00 | $900.00 | $1,600.00 |
| 93 | Metal beam guard fence trans (31"-28")(25') (540-7031) | EACH | 1 | $765.00 | $750.00 | $780.00 | $980.00 | $1,350.00 | $700.00 | |
| 94 | Remove metal beam guard fence (542-7001) | LF | 3,997.50 | $3.00 | $2.10 | $3.00 | $2.15 | $3.00 | $2.50 | $3.00 |
| 95 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 12 | $270.00 | $211.00 | $250.00 | $215.00 | $220.00 | $200.00 | $250.00 |
| 96 | Guardrail end treatment (install) (544-7001) | EACH | 6 | $3,300.00 | $3,405.00 | $3,500.00 | $3,468.00 | $3,630.00 | $3,325.00 | $3,300.00 |
| 97 | Guardrail end treatment (remove) (544-7003) | EACH | 12 | $250.00 | $211.00 | $250.00 | $215.00 | $220.00 | $200.00 | $250.00 |
| 98 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 22 | $1,200.00 | $2,058.00 | $2,000.00 | $2,957.00 | $920.00 | $2,000.00 | $1,000.00 |
| 99 | Crash cushion attenuator (remove) (545-7004) | EACH | 23 | $1,000.00 | $335.00 | $1,500.00 | $1,344.00 | $610.00 | $800.00 | $400.00 |
| 100 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 23 | $8,000.00 | $7,055.00 | $8,000.00 | $8,817.00 | $7,500.00 | $8,200.00 | $6,000.00 |
| 101 | Gate (remove) (550-7016) | EACH | 2 | $500.00 | $506.00 | $400.00 | $500.00 | $500.00 | $475.00 | $500.00 |
| 102 | Wire fence (type A) (552-7001) | LF | 252 | $20.00 | $32.00 | $15.00 | $31.72 | $30.00 | $30.00 | $17.00 |
| 103 | Gate (type 1) (552-7006) | EACH | 2 | $1,600.00 | $1,572.00 | $2,500.00 | $1,656.00 | $1,710.00 | $1,475.00 | $1,800.00 |
| 104 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 4 | $330.00 | $518.00 | $300.00 | $269.00 | $410.00 | $250.00 | $250.00 |
| 105 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 3 | $700.00 | $570.00 | $700.00 | $710.00 | $490.00 | $660.00 | $660.00 |
| 106 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 305 | $17.00 | $12.00 | $15.00 | $14.00 | $10.00 | $13.04 | $13.00 |
| 107 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 375 | $19.00 | $20.00 | $19.66 | $20.00 | $18.28 | $20.00 | |
| 108 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 135 | $29.00 | $16.50 | $20.00 | $19.39 | $20.00 | $18.03 | $17.00 |
| 109 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 375 | $23.50 | $30.00 | $27.83 | $20.00 | $25.88 | $24.00 | |
| 110 | Conduit (prepare) (618-7090) | LF | 780 | $2.00 | $2.45 | $12.00 | $11.26 | $1.00 | $10.47 | $2.50 |
| 111 | Electrical conductor (no.8) insulated (620-7008) | LF | 1,115 | $2.25 | $2.75 | $3.00 | $2.77 | $2.00 | $2.58 | $2.80 |
| 112 | Electrical conductor (no.6) insulated (620-7010) | LF | 1,035 | $2.90 | $3.25 | $4.00 | $3.83 | $3.00 | $3.56 | $3.30 |
| 113 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 2,155 | $3.50 | $3.85 | $4.00 | $4.00 | $3.00 | $3.73 | $4.00 |
| 114 | Ground box type D (162922)W/apron (624-7008) | EACH | 8 | $1,500.00 | $2,288.00 | $1,400.00 | $1,326.00 | $1,180.00 | $1,232.98 | $2,400.00 |
| 115 | Remove ground box (624-7013) | EACH | 1 | $500.00 | $751.00 | $115.00 | $113.00 | $390.00 | $104.72 | $770.00 |
| 116 | Relocate electrical services (628-7001) | EACH | 1 | $2,800.00 | $3,124.00 | $2,200.00 | $2,105.00 | $2,390.00 | $1,957.53 | $3,200.00 |
| 117 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 1 | $8,499.00 | $9,000.00 | $8,522.00 | $8,140.00 | $7,925.27 | $8,700.00 | |
| 118 | Aluminum signs (type A) (636-7001) | SF | 54.50 | $50.00 | $75.50 | $40.00 | $130.00 | $60.00 | $31.17 | $77.00 |
| 119 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 29 | $650.00 | $733.00 | $700.00 | $726.00 | $790.00 | $675.00 | $680.00 |
| 120 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 4 | $850.00 | $750.00 | $769.00 | $920.00 | $715.00 | $720.00 | |
| 121 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 2 | $1,000.00 | $1,200.00 | $1,108.00 | $1,080.00 | $1,030.00 | $1,050.00 | |
| 122 | Install small roadside sign support and assembly TYS80(1)SA(U-WC) (644-7035) | EACH | 2 | $1,500.00 | $1,100.00 | $1,400.00 | $1,269.00 | $1,190.00 | $1,180.00 | $1,200.00 |
| 123 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 1 | $475.00 | $500.00 | $484.00 | $510.00 | $450.00 | $450.00 | |
| 124 | Remove SM RD SN sup&AM (644-7073) | EACH | 32 | $100.00 | $100.00 | $150.00 | $135.00 | $110.00 | $125.00 | $130.00 |
| 125 | Install delineator assembly (D-SW)SZ 1(WFLX)GF2 (658-7001) | EACH | 22 | $25.00 | $38.00 | $30.00 | $22.00 | $30.00 | $20.00 | $36.00 |
| 126 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 26 | $19.00 | $20.00 | $20.00 | $18.00 | $20.00 | $16.00 | $17.00 |
| 127 | Install object marker assembly (OM-2Z)(WFLX)SRFHH (658-7257) | EACH | 5 | $39.00 | $200.00 | $188.00 | $140.00 | $175.00 | $180.00 | |
| 128 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 56,793 | $0.80 | $1.00 | $1.00 | $0.62 | $1.00 | $0.97 | $1.00 |
| 129 | Work zone pavement marking removing (W)8"(DOT) (662-7070) | LF | 252 | $4.65 | $2.00 | $1.50 | $0.98 | $2.00 | $1.25 | $1.30 |
| 130 | Work zone pavement marking removing (W)8"(solid) (662-7072) | LF | 1,253 | $1.90 | $1.25 | $1.40 | $0.98 | $1.00 | $1.20 | $1.30 |
| 131 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 236 | $11.00 | $12.00 | $9.00 | $7.00 | $10.00 | $8.00 | $8.00 |
| 132 | Work zone pavement marking removing (W)(arrow) (662-7082) | EACH | 8 | $200.00 | $200.00 | $85.00 | $177.00 | $220.00 | $75.00 | $75.00 |
| 133 | Work zone pavement marking removing (W)(word) (662-7092) | EACH | 8 | $230.00 | $200.00 | $100.00 | $210.00 | $220.00 | $95.00 | $95.00 |
| 134 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 70,372 | $0.80 | $1.00 | $1.00 | $0.62 | $1.00 | $0.97 | $1.00 |
| 135 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 5,504 | $1.60 | $1.50 | $1.50 | $1.00 | $0.10 | $5.00 | $1.00 |
| 136 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 4,897 | $1.70 | $1.00 | $1.50 | $1.00 | $0.10 | $5.00 | $1.00 |
| 137 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 696 | $1.60 | $1.00 | $0.70 | $0.67 | $1.00 | $0.65 | $0.65 |
| 138 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 2,422 | $1.40 | $1.00 | $1.20 | $1.02 | $1.00 | $1.10 | $1.15 |
| 139 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 117 | $11.00 | $10.00 | $8.00 | $8.00 | $10.00 | $7.25 | $7.30 |
| 140 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 13 | $190.00 | $200.00 | $180.00 | $177.00 | $220.00 | $165.00 | $170.00 |
| 141 | Reflectorized pavement marking type I(W)(lane drop arrow)(100MIL) (666-7060) | EACH | 4 | $300.00 | $450.00 | $400.00 | $200.00 | $490.00 | $373.00 | $380.00 |
| 142 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 9 | $240.00 | $200.00 | $220.00 | $210.00 | $220.00 | $195.00 | $200.00 |
| 143 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 35,636 | $1.00 | $1.05 | $0.90 | $1.34 | $1.10 | $0.80 | $0.80 |
| 144 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 41,725 | $1.00 | $1.05 | $0.90 | $1.34 | $1.10 | $0.80 | $0.86 |
| 145 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 5,576 | $1.00 | $1.05 | $0.95 | $1.34 | $1.10 | $0.85 | $0.85 |
| 146 | Pavement sler 6" (666-7347) | LF | 6,368 | $0.30 | $0.50 | $0.30 | $0.20 | $0.50 | $0.25 | $0.25 |
| 147 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 5,437 | $0.95 | $0.65 | $0.75 | $0.65 | $0.70 | $0.65 | $0.65 |
| 148 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 658 | $2.00 | $0.80 | $1.50 | $0.65 | $0.85 | $1.00 | $1.00 |
| 149 | PRFB rumble strip (BLK)(1')(centerline) (668-7002) | LF | 360 | $5.00 | $6.00 | $16.40 | $10.00 | $5.00 | $5.00 | |
| 150 | Reflectorized pavement marker type I-C (672-7002) | EACH | 347 | $5.00 | $5.00 | $6.00 | $6.18 | $10.00 | $5.00 | $5.00 |
| 151 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,675 | $5.75 | $5.00 | $6.00 | $6.18 | $10.00 | $5.00 | $5.00 |
| 152 | Eliminating existing PM & markers (4") (677-7001) | LF | 24,562 | $0.60 | $0.55 | $1.20 | $0.31 | $0.60 | $1.00 | $1.00 |
| 153 | Pavement surface preparation for marking (6") (678-7002) | LF | 6,368 | $0.35 | $0.20 | $0.85 | $0.16 | $0.25 | $0.75 | $0.75 |
| 154 | Install highway traffic signal (isolated) (680-7002) | EACH | 1 | $40,860 | $33,000 | $32,927 | $31,400 | $30,622 | $42,000 | |
| 155 | Removing traffic signals (680-7004) | EACH | 1 | $7,672.00 | $3,000.00 | $2,855.00 | $4,560.00 | $2,655.03 | $8,000.00 | |
| 156 | Install highway traffic signal (upgrade) (680-7011) | EACH | 1 | $15,000 | $11,600 | $10,000 | $9,170.00 | $10,250 | $8,527.56 | $12,000 |
| 157 | Temporary traffic signals (681-7001) | EACH | 1 | $80,000 | $27,190 | $85,000 | $80,440 | $103,030 | $74,807 | $28,000 |
| 158 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 3 | $400.00 | $287.00 | $400.00 | $403.00 | $360.00 | $374.39 | $311.00 |
| 159 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 4 | $287.00 | $400.00 | $396.00 | $360.00 | $368.10 | $311.00 | |
| 160 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 3 | $400.00 | $287.00 | $400.00 | $403.00 | $360.00 | $374.39 | $311.00 |
| 161 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 7 | $400.00 | $287.00 | $400.00 | $396.00 | $360.00 | $368.11 | $311.00 |
| 162 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 3 | $240.00 | $185.00 | $200.00 | $192.00 | $220.00 | $178.78 | $200.00 |
| 163 | Retrofit reflectorized border sheeting (3 sec) (682-7045) | EACH | 4 | $225.00 | $88.00 | $200.00 | $192.00 | $300.00 | $178.79 | $95.00 |
| 164 | Retrofit reflectorized border sheeting (4 sec) (682-7046) | EACH | 1 | $250.00 | $273.00 | $260.00 | $268.00 | $330.00 | $249.36 | $296.00 |
| 165 | Backplate W/reflectorized border (1SEC)(went)aluminum (682-7050) | EACH | 8 | $146.00 | $150.00 | $142.00 | $150.00 | $132.17 | $159.00 | |
| 166 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 1,920 | $2.75 | $2.15 | $3.00 | $2.92 | $2.50 | $2.72 | $2.30 |
| 167 | Reloct RDSD FLSH BCN AM (solar PWRD) (685-7005) | EACH | 1 | $3,400.00 | $4,432.00 | $3,500.00 | $3,257.00 | $2,590.00 | $3,028.53 | $4,810.00 |
| 168 | Ins traffic signal PL AM(S)1 arm(32')lum (686-7035) | EACH | 1 | $14,390 | $14,500 | $14,770 | $16,000 | $13,735 | $15,000 | |
| 169 | Ins traffic signal PL AM(S)1 arm(44') (686-7045) | EACH | 1 | $15,320 | $15,000 | $15,460 | $17,610 | $14,378 | $16,000 | |
| 170 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 1 | $17,600 | $17,000 | $17,974 | $19,970 | $16,715 | $18,000 | |
| 171 | Ins traffic signal PL AM(S)1 arm(55')lum (686-7059) | EACH | 1 | $39,140 | $40,000 | $40,614 | $44,870 | $37,770 | $40,000 | |
| 172 | Removal of signal head assembly (690-7024) | EACH | 2 | $250.00 | $400.00 | $100.00 | $80.00 | $100.00 | $73.85 | $434.00 |
| 173 | Removal of signal related signs (690-7027) | EACH | 1 | $400.00 | $1,199.00 | $100.00 | $60.00 | $70.00 | $55.32 | $1,301.00 |
| 174 | Bonding course (3007-7001) | GAL | 24,419 | $5.50 | $4.20 | $4.00 | $3.78 | $4.50 | $4.24 | $4.40 |
| 175 | Tip testing(drilled shaft) (4003-7001) | EACH | 15 | $8,000.00 | $4,643.00 | $6,700.00 | $4,800.00 | $6,480.00 | $4,500.00 | $4,600.00 |
| 176 | Temporary construction access (4006-7001) | LS | 1 | $395,000 | $450,000 | $330,000 | $452,000 | $3,440.00 | $290,824 | $20,000 |
| 177 | Bbu system (external battery cabinet) (6007-7001) | EACH | 1 | $8,885.57 | $10,000 | $9,570.00 | $10,130 | $8,900.13 | $9,000.00 | |
| 178 | Radar presence detector comm cable (6008-7009) | LF | 900 | $4.00 | $3.40 | $3.50 | $3.22 | $1.30 | $2.99 | $3.50 |
| 179 | Ground box (prepare) (6013-7006) | EACH | 2 | $750.00 | $565.00 | $450.00 | $450.00 | $470.00 | $418.78 | $600.00 |
| 180 | Ground box W/ apron (adjust) (6013-7008) | EACH | 2 | $1,250.00 | $847.00 | $700.00 | $715.00 | $660.00 | $664.48 | $900.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of November 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.