Granite Construction Company: TxDOT bid record
Granite Construction Company submitted 37 bids on Texas DOT contracts in the data, from 05 AUG 2021 to 04 NOV 2026, and was the low bidder on 8 of them (22%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $341,014,346
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 2 | 0 | 0% |
| 2022 | 2 | 2 | 100% |
| 2023 | 5 | 2 | 40% |
| 2024 | 6 | 0 | 0% |
| 2025 | 9 | 3 | 33% |
| 2026 | 13 | 1 | 8% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 15 | 3 | 20% |
| Dallas District | 14 | 3 | 21% |
| Fort Worth District | 2 | 1 | 50% |
| Paris District | 2 | 1 | 50% |
| Beaumont District | 1 | 0 | 0% |
| Waco District | 1 | 0 | 0% |
| Bryan District | 1 | 0 | 0% |
| Pharr District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Riprap (mow strip)(4 in) | 432-7013 | CY | 28 | 13 (46%) | $592.50 | $643.00 |
| Riprap (concrete)(4 in) | 432-7001 | CY | 18 | 13 (72%) | $392.11 | $650.00 |
| Install small roadside sign support and assembly type 10BWG(1)SA(P) | 644-7001 | EACH | 31 | 11 (35%) | $645.00 | $710.00 |
| Removing structure (set) | 496-7004 | EACH | 26 | 11 (42%) | $425.00 | $505.00 |
| Removing structure (box culvert) | 496-7008 | LF | 16 | 11 (69%) | $47.55 | $100.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 29 | 10 (34%) | $3,100.00 | $3,245.00 |
| Install small roadside sign support and assembly type 10BWG(1)SA(T) | 644-7004 | EACH | 25 | 10 (40%) | $733.00 | $825.00 |
| Metal beam guard fence trans (thrie-beam) | 540-7005 | EACH | 24 | 10 (42%) | $1,849.24 | $2,140.00 |
| Rock filter dams (remove) | 506-7011 | LF | 26 | 9 (35%) | $12.50 | $12.00 |
| Metal W-beam guard fence (timber post) | 540-7001 | LF | 25 | 9 (36%) | $25.00 | $27.00 |
| Removing structure (inlet) | 496-7002 | EACH | 22 | 9 (41%) | $645.79 | $1,000.00 |
| Portable concrete traffic barrier (move)(low prof)(type 1) | 512-7033 | LF | 15 | 9 (60%) | $4.52 | $9.30 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Webber, LLC | 15 | 8 of 15 |
| James Construction Group, LLC | 14 | 10 of 14 |
| Harper Brothers Construction LLC | 14 | 11 of 14 |
| Zachry Construction Corporation | 12 | 5 of 12 |
| Ser Construction Partners, LLC | 10 | 8 of 10 |
| Pulice Construction, Inc. | 10 | 4 of 10 |
| Ragle Construction, Inc. | 8 | 3 of 8 |
| R Construction Civil, LLC | 8 | 5 of 8 |
| Isi Contracting, Inc. | 7 | 4 of 7 |
| Texas Materials Group, Inc. | 7 | 4 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00124162 | Bryan District | Bridge Replacement, SH 30 (0.30 Mi. West of William D. Fitch to 0.66 Mi East of William D. Fitch) | 11 of 12 | $44,387,970 | +47% |
| 06 AUG 2026 | A00191470 | Houston District | Construct Frontage Roads, SH 99 (Fry Road to Westheimer Parkway) | 6 of 9 | $36,972,259 | +13% |
| 05 AUG 2026 | A00191471 | Houston District | Construct Frontage Roads, SH 99 (Westheimer Parkway to Cinco Ranch Blvd) | 5 of 8 | $29,417,878 | +13% |
| 05 AUG 2026 | A00068611 | Houston District | Widen Road - Add Lanes, UA 90 (FM 359 to W of SH 99) | 6 of 7 | $52,433,678 | +7.0% |
| 01 JUL 2026 | A00190685 | Houston District | Construct Frontage Roads, SH 99 (Cinco Ranch Blvd to Bay Hill Blvd) | 5 of 11 | $20,387,221 | +5.0% |
| 29 MAY 2026 | A00220046 | Fort Worth District | SKID RESTORATION (NON-REHAB), FM3210 (FM 2425 to End of State Maintenance) | 1 of 1 | $410,561 | Low |
| 06 MAY 2026 | A00014162 | Dallas District | Widen Road - Add Lanes, US 377 (South of FM 1171 to Crawford Road) | 2 of 9 | $112,963,312 | +1.0% |
| 08 APR 2026 | A00133118 | Houston District | Widen Road - Add Lanes, SH 99 (IH 10(W) to West Road) | 10 of 10 | $155,750,774 | +30% |
| 07 APR 2026 | A00211984 | Dallas District | Bridge Maintenance, IH 30 (At Hunnicut Road to In Dallas County) | 10 of 12 | $535,440 | +68% |
| 04 MAR 2026 | A00020688 | Dallas District | Interchange Improvement, US 67 (AT LAKE RIDGE PKWY to .) | 5 of 9 | $68,859,637 | +8.0% |
| 04 FEB 2026 | A00045441 | Dallas District | Widen Road - Add Lanes, FM 549 (SH 205 to SH 276) | 7 of 12 | $35,089,835 | +18% |
| 04 FEB 2026 | A00121975 | Houston District | Highway Improvement, US 290 (US 290/Greenhouse Rd, From Mound Rd to Skinner Rd at US 290) | 10 of 10 | $97,871,055 | +32% |
| 07 JAN 2026 | A00209704 | Paris District | Bridge Maintenance, IH 30 (At Clendeling Creek to .) | 5 of 6 | $4,176,194 | +83% |
| 05 NOV 2025 | A00004604 | Waco District | Widen Road - Add Lanes, US 190 (CORYELL COUNTY LINE to US 190 W OF CLARK RD) | 7 of 7 | $129,031,363 | +20% |
| 08 OCT 2025 | A00186223 | Houston District | Construct Frontage Roads, SH 99 (Longenbaugh Road to FM 529) | 5 of 10 | $8,467,146 | +29% |
| 05 SEP 2025 | A00121173 | Pharr District | New Arterial, SL 195 (NEW LOCATION, FM 3167 to FM 755) | 6 of 6 | $70,234,204 | +13% |
| 08 AUG 2025 | A00184821 | Dallas District | Highway Improvement, SH 243 (SH 34 to FM 2727) | 5 of 7 | $4,052,274 | +15% |
| 07 AUG 2025 | A00184820 | Dallas District | Highway Improvement, SH 198 (North of US 175 to FM 3080) | 5 of 9 | $5,608,179 | +8.0% |
| 04 JUN 2025 | A00207367 | Dallas District | REHABILITATION OF EXISTING ROADWAY, MR0682 (US 80 to 2ND STREET) | 1 of 3 | $4,164,553 | Low, 6.0% under the second |
| 03 APR 2025 | A00064052 | Dallas District | Rehabilitate Existing Roadway, FM 2727 (SH 243 to FM 429) | 7 of 9 | $21,333,904 | +27% |
| 05 MAR 2025 | A00131586 | Dallas District | Widen Road - Add Lanes, FM 548 (North of US 80 to Windmill Farms Blvd) | 1 of 6 | $80,359,417 | Low, 5.0% under the second |
| 07 JAN 2025 | A00212545 | Paris District | Bridge Maintenance, IH 30 (700' West of Bill Bradford Rd to 150' East of Bill Bradford Rd) | 1 of 12 | $339,000 | Low, 23% under the second |
| 02 AUG 2024 | 08243202 | Houston District | IH 45 Drainage improvements from S OF SHENANDOAH PARK DR to SH 242 | 2 of 4 | $49,293,486 | +16% |
| 09 JUL 2024 | 07243009 | Houston District | FM 521 Bridge replacement from AT OYSTER CREEK | 3 of 8 | $3,484,715 | +7.0% |
| 05 JUN 2024 | 06243002 | Houston District | US 90 Construct bridge from AT GREENS BAYOU | 5 of 7 | $71,242,756 | +6.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.