TxDOT contract A00212545 bid tabulation
Bridge Maintenance, IH 30 (700' West of Bill Bradford Rd to 150' East of Bill Bradford Rd). Let by Texas DOT on January 7, 2025, Hopkins, Paris District. 12 bids received; low bid $339,000 by Granite Construction Company, -68% against the engineer's estimate of $1,068,480.
- Owner
- Texas DOT
- Letting
- 07 JAN 2025
- Pay items
- 9
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Granite Construction Company | $339,000 | Low | -68% |
| 2 | Macias Specialty Contracting LLC | $417,075 | +23% | -61% |
| 3 | Icos Management, LLC | $727,794 | +115% | -32% |
| 4 | THK Construction LLC | $745,031 | +120% | -30% |
| 5 | GHB Equipment Company, L.L.C. | $787,750 | +132% | -26% |
| 6 | Garret Shields Infrastructure | $823,000 | +143% | -23% |
| 7 | 12Twelve Road and Bridge LLC | $972,092 | +187% | -9.0% |
| 8 | Aad Contracting Inc. | $1,021,850 | +201% | -4.0% |
| 9 | Rhino Equity, LLC | $1,060,850 | +213% | -1.0% |
| 10 | Built Right Construction of Oklahoma, LLC | $1,068,900 | +215% | 0.0% |
| 11 | FNH Construction, LLC | $1,308,600 | +286% | +22% |
| 12 | Hodges and Son Construction Company, Inc. | $1,534,100 | +353% | +44% |
Engineer's estimate: $1,068,480.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Granite Construction Company | 2. Macias Specialty Contracting LLC | 3. Icos Management, LLC | 4. THK Construction LLC | 5. GHB Equipment Company, L.L.C. | 6. Garret Shields Infrastructure |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Flowable backfill (401-7001) | CY | 10 | $250.00 | $1,000.00 | $850.00 | $440.00 | $1,750.00 | $600.00 | $600.00 |
| 2 | Retaining wall (special) (423-7029) | SF | 151 | $500.00 | $450.00 | $375.00 | $792.00 | $550.00 | $800.00 | $2,000.00 |
| 3 | Concrete structure repair(deck rep(part depth)) (429-7003) | SF | 245 | $100.00 | $250.00 | $200.00 | $440.00 | $280.62 | $150.00 | $200.00 |
| 4 | Cleaning and sealing existing joints (438-7001) | LF | 4,600 | $125.00 | $3.00 | $22.00 | $55.00 | $5.00 | $72.00 | $50.00 |
| 5 | Mobilization (500-7001) | LS | 1 | $96,980 | $33,000 | $35,000 | $112,500 | $70,000 | $100,000 | $100,000 |
| 6 | Barricades, signs and traffic handling (502-7001) | MO | 2 | $15,000 | $11,000 | $30,000 | $1.00 | $131,864 | $38,500 | $5,000.00 |
| 7 | Portable changeable message sign (503-7001) | DAY | 180 | $200.00 | $75.00 | $150.00 | $50.00 | $191.67 | $50.00 | $100.00 |
| 8 | TMA (stationary) (505-7001) | DAY | 60 | $300.00 | $500.00 | $600.00 | $100.00 | $425.00 | $1,200.00 | $400.00 |
| 9 | Concrete rail replacement (in-kind) (778-7004) | LF | 70 | $3,000.00 | $1,250.00 | $625.00 | $1,650.00 | $2,271.43 | $500.00 | $1,200.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.