TxDOT contract A00004604 bid tabulation

Widen Road - Add Lanes, US 190 (CORYELL COUNTY LINE to US 190 W OF CLARK RD). Let by Texas DOT on November 5, 2025, Coryell, Waco District. 7 bids received; low bid $107,409,195 by James Construction Group, LLC, -16% against the engineer's estimate of $127,915,646.

Owner
Texas DOT
Letting
05 NOV 2025
Pay items
357
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1James Construction Group, LLC$107,409,195Low-16%
2Indus Road & Bridge, Inc.$112,729,963+5.0%-12%
3Webber, LLC$119,182,905+11%-7.0%
4Pulice Construction, Inc.$120,346,064+12%-6.0%
5Jordan Foster Construction, LLC$122,658,398+14%-4.0%
6Orion Construction, LLC$125,992,597+17%-2.0%
7Granite Construction Company$129,031,363+20%+1.0%
TxDOT contract A00004604: bids by rank

Engineer's estimate: $127,915,646.

Bid tabulation

LinePay itemUnitQuantityEstimate1. James Construction Group, LLC2. Indus Road & Bridge, Inc.3. Webber, LLC4. Pulice Construction, Inc.5. Jordan Foster Construction, LLC6. Orion Construction, LLC
1Preparing row (100-7002)STA344$2,200.00$23,500$8,233.59$34,646$14,650$16,650$10,750
2Removing concrete (pavement) (104-7001)SY15,005$14.00$7.35$6.50$17.30$16.66$12.10$9.00
3Removing concrete (mowstrip) (104-7005)LF1,437.50$14.00$13.63$8.00$9.30$0.63$6.25$1.00
4Removing concrete (riprap) (104-7006)SY6,360$27.50$13.60$12.00$12.50$10.92$11.00$2.00
5Removing concrete (medians) (104-7008)SY2,966$26.00$14.24$16.00$18.50$7.10$6.60$2.00
6Removing concrete (pavers) (104-7010)SY2,445$8.63$10.00$8.45$4.75$7.45$3.25
7Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY24$31.00$80.99$10.00$41.00$76.31$35.00$2.00
8Removing concrete (curb & gutter) (104-7017)LF1,532$14.00$8.02$5.00$8.75$1.70$8.75$8.00
9Removing concrete (rail) (104-7036)LF933$30.00$11.59$41.00$16.30$14.73$55.00$32.00
10Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002)SY2,353$11.00$1.93$3.59$7.40$3.99$5.50$3.00
11Remove (6") TRT/untrt base & asphalt pavement (105-7026)SY133$11.00$2.21$3.90$12.90$4.35$5.00$1.25
12Remove (13") TRT/untrt base & asphalt pavement (105-7033)SY1,733$12.00$4.11$10.00$13.60$7.75$7.60$4.25
13Remove (14") TRT/untrt base & asphalt pavement (105-7034)SY1,010$5.42$8.00$13.00$6.61$13.50$1.25
14Remove (16") TRT/untrt base & asphalt pavement (105-7036)SY67,789$14.00$4.94$6.00$9.45$9.30$6.75$4.52
15Remove (22") TRT/untrt base & asphalt pavement (105-7042)SY13,631$38.00$8.14$6.60$16.30$14.81$10.00$7.00
16Excavation (roadway) (110-7001)CY253,029$15.00$8.88$8.00$15.90$3.20$5.00$5.75
17Excavation (channel) (110-7002)CY1,112$25.00$14.57$28.00$11.80$5.24$22.00$9.75
18Embankment (final)(DC)(type C) (132-7006)CY969,158$22.00$13.22$12.00$9.70$12.50$13.65$24.50
19Embankment (final)(OC)(type D) (132-7011)CY343$25.00$14.22$21.00$13.80$16.44$37.00$10.00
20Furn & place topsoil (4") (160-7002)SY520,956$1.60$0.91$0.80$0.60$1.43$1.45$0.70
21Block sodding (162-7002)SY4,734$5.00$4.16$4.17$4.15$4.24$6.40$4.75
22Broadcast seed (permanent_rural_clay) (164-7002)SY51,646$0.40$0.18$0.19$0.20$0.18$0.32$0.21
23Broadcast seed (temporary_warm) (164-7005)SY25,823$0.20$0.12$0.13$0.10$0.12$0.32$0.14
24Broadcast seed (temporary_cool) (164-7006)SY25,823$0.20$0.12$0.13$0.10$0.12$0.32$0.14
25Drill seed (permanent_rural_clay) (164-7010)SY464,576$0.20$0.15$0.16$0.15$0.15$0.15$0.18
26Drill seed (temporary_warm) (164-7013)SY232,289$0.19$0.12$0.13$0.10$0.12$0.15$0.14
27Drill seed (temporary_cool) (164-7014)SY232,289$0.19$0.12$0.13$0.10$0.12$0.15$0.14
28Vegetative watering (168-7001)TGL8,460.50$20.00$36.09$9.40$4.00$42.74$42.00$38.00
29Soil ret BLKT(SL_steep_clay_short) (169-7005)SY25,678$5.00$0.12$0.70$0.65$0.68$1.30$1.00
30Proof rolling (216-7001)HR54$112.50$118.73$235.00$288.00$176.43$110.00$234.00
31FL BS (compacted in place)(tyd GR1-2)(final pos) (247-7188)CY83,261$67.00$38.62$55.00$46.25$40.00$58.50$56.25
32Cement (275-7001)TON282$250.00$186.60$212.00$202.00$250.00$205.00$226.00
33Cement TRT (new base)(6") (275-7010)SY31,105$3.00$2.87$2.46$3.10$2.50$4.50$2.50
34CM TRT(PT MX)(CL M)(type D)(GR 3)(FN pos) (276-7090)CY131$110.86$110.00$163.00$361.14$325.00$280.00
35Prime coat(MC-30 or AE-P) (310-7013)GAL51,278$4.65$5.00$5.20$5.10$5.00$5.08$5.75
36Asphalt (CRS-2) (316-7011)GAL97,549$4.65$3.35$3.50$3.40$4.00$3.40$4.00
37Aggregate (type-D or L, GR-4) (316-7253)CY1,611$165.00$189.00$194.00$192.00$194.00$195.00$220.00
38D-GR HMA type-B PG64-22 (341-7001)TON52,926$105.00$76.00$80.00$77.25$80.00$76.00$88.00
39D-GR HMA type-C PG64-22 (341-7015)TON9,892$145.00$102.00$106.00$104.00$105.00$107.00$118.00
40D-GR HMA type D PG64-22 (level-UP) (341-7046)TON11,305$150.00$97.00$101.00$98.50$100.00$100.00$113.00
41Tack coat (341-7082)GAL23,140$4.00$3.50$3.60$3.55$4.00$3.60$4.00
42Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009)TON45,553$175.00$105.75$114.00$107.00$112.00$112.00$124.00
43Tack coat (346-7028)GAL41,575$4.00$3.50$3.60$3.55$4.00$3.60$4.00
44Flexible pavement structure repair(8") (351-7007)SY30,000$66.00$47.60$50.00$48.00$50.00$50.00$49.50
45Planing asphalt concrete pavement(0" to 2") (354-7032)SY131,220$2.50$1.07$2.00$1.50$1.66$1.70$1.85
46Planing asphalt concrete pavement (0" to 2-1/2") (354-7083)SY72,586$3.00$0.85$2.00$1.85$2.07$2.20$2.45
47Pavement JT underseal (24") (356-7021)LF245$0.10$10.00$1.00$42.31$40.00$1.20
48Concrete pavement (CRCP) (9") (360-7003)SY26,859$100.00$95.07$80.00$88.50$98.00$98.00$96.00
49Full - depth repair CRCP (9") (361-7050)SY45$596.93$305.00$780.00$500.00$290.00$235.00
50Cut & restore asphalt paving (400-7008)SY20$180.00$396.42$450.00$853.00$516.92$190.00$140.00
51Cem stabil BKFL (400-7010)CY3,301$150.00$167.33$225.00$199.00$172.47$208.00$240.00
52Trench excavation protection (402-7001)LF6,001$8.00$0.90$23.00$5.75$14.45$5.60$28.00
53Temporary special shoring (403-7001)SF71,541$15.00$26.27$35.00$2.00$15.00$15.50$13.00
54Soil nail anchors (410-7001)LF5,340$25.00$72.67$52.00$22.80$30.71$47.00$53.00
55Rock nail anchors (411-7001)LF45,495$40.00$41.33$34.00$18.00$28.48$29.00$34.00
56Drilled shaft (18 in) (416-7002)LF934$175.00$107.83$112.00$172.00$133.72$100.00$135.00
57Drilled shaft (30 in) (416-7005)LF315$275.00$315.17$185.00$230.00$263.60$187.00$340.00
58Drilled shaft (36 in) (416-7006)LF4,211$295.00$239.84$232.00$298.00$266.76$210.00$280.00
59Drilled shaft (42 in) (416-7007)LF1,011$305.00$266.81$255.00$359.00$311.71$260.00$350.00
60Drilled shaft (48 in) (416-7008)LF343$435.00$298.79$302.00$392.00$348.83$315.00$405.00
61Drilled shaft (54 in) (416-7009)LF525$650.00$400.41$455.00$562.00$529.86$465.00$515.00
62Drilled shaft (60 in) (416-7010)LF1,276$730.00$461.67$616.00$662.00$639.42$555.00$605.00
63Drilled shaft (non - reinforced) (12 in) (416-7024)LF59.50$128.00$159.00$210.00$159.00$92.31$210.00$185.00
64Drilled shaft (sign mounts) (24 in) (416-7028)LF221$200.00$165.00$367.00$165.00$159.50$370.00$190.00
65Drilled shaft (sign mounts) (30 in) (416-7029)LF141$490.00$286.00$505.00$286.00$537.52$505.00$330.00
66Drilled shaft (sign mounts) (36 in) (416-7030)LF140$500.00$375.00$715.00$375.00$761.49$715.00$435.00
67Drilled shaft (sign mounts) (48 in) (416-7032)LF36$515.00$840.00$515.00$895.87$840.00$600.00
68Drilled shaft (roadway illumination pole) (30 in) (416-7040)LF272$320.00$355.00$500.00$355.00$489.56$495.00$415.00
69Drilled shaft (traffic signal pole) (24 in) (416-7042)LF18$230.00$178.00$490.00$178.00$479.15$485.00$210.00
70Drilled shaft (traffic signal pole) (30 in) (416-7043)LF11$400.00$489.00$620.00$489.00$604.14$610.00$570.00
71Drilled shaft (traffic signal pole) (36 in) (416-7044)LF54$475.00$578.00$690.00$578.00$666.64$675.00$670.00
72Sound wall (419-7001)SF29,678$47.50$55.60$48.00$35.00$53.00$53.00$44.00
73Class B concrete (flume) (420-7010)CY16.70$800.00$915.47$560.00$933.00$1,738.25$1,300.00$1,800.00
74Class C concrete (abutment)(HPC) (420-7013)CY564.20$1,550.00$1,033.33$835.00$1,790.00$1,652.24$1,375.00$1,650.00
75Class C concrete (cap)(HPC) (420-7023)CY806.90$1,750.00$1,160.29$1,350.00$1,860.00$1,500.00$1,900.00$2,100.00
76Class C concrete (column)(HPC) (420-7039)CY919.60$1,885.00$1,331.50$1,100.00$1,340.00$1,400.00$2,000.00$1,800.00
77Class C concrete (column)(HPC)(mass) (420-7041)CY781$1,500.00$1,247.77$1,400.00$1,110.00$1,550.00$1,400.00$1,400.00
78Class C concrete (crashwall)(HPC) (420-7051)CY7.80$3,632.38$2,100.00$3,020.00$2,550.23$2,300.00$2,300.00
79Class C concrete (rail foundation) (420-7052)CY1,079.90$555.00$513.66$450.00$620.00$559.10$590.00$650.00
80Class C concrete (miscellaneous) (420-7067)CY1.10$800.00$1,929.85$1,600.00$2,350.00$12,372$2,400.00$1,200.00
81CL F concrete (cap)(HPC)(mass) (420-7074)CY146$1,200.00$1,201.09$1,800.00$1,470.00$1,200.00$1,900.00$1,850.00
82CL F concrete (footing)(HPC)(mass) (420-7114)CY195.60$1,500.00$877.77$810.00$778.00$1,134.32$1,000.00$1,100.00
83Reinforced concrete slab (422-7001)SF201,516$28.00$25.33$22.00$26.90$25.00$29.85$32.00
84Approach slab (422-7013)CY593.10$810.00$545.04$670.00$635.00$600.00$528.00$775.00
85Approach slab (mod) (422-7026)CY84.70$810.00$536.54$725.00$673.00$600.00$650.00$800.00
86Retaining wall (MSE) (423-7001)SF73,926$75.00$45.52$71.00$81.00$61.00$75.00$88.00
87Retaining wall (soil nail) (fascia) (423-7023)SF11,537$90.00$48.05$69.00$84.00$73.00$78.00$88.00
88Retaining wall (rock nail) (fascia) (423-7024)SF45,809$70.00$44.67$69.00$69.25$63.00$65.75$80.00
89Prestressed concrete girder (TX54) (425-7005)LF3,905.75$220.00$349.34$223.00$196.00$325.00$370.00$375.00
90Prestressed concrete U-beam (U54) (425-7043)LF9,473.28$250.00$347.51$427.00$427.00$350.00$400.00$400.00
91Riprap (concrete)(4 in) (432-7001)CY921$650.00$370.33$600.00$742.00$646.19$800.00$800.00
92Riprap (concrete)(CL B) (432-7005)CY207$650.00$619.48$565.00$683.00$763.60$900.00$775.00
93Riprap (concrete) (CL B) (4 in) (432-7007)CY1,123$570.00$370.33$588.00$632.00$634.98$750.00$725.00
94Riprap (concrete)(CL B)(5 in) (432-7008)CY40$610.00$850.18$660.00$725.00$942.89$766.00$900.00
95Riprap (concrete)(flume) (432-7012)CY534$750.00$664.20$610.00$721.00$730.19$850.00$825.00
96Riprap (mow strip)(4 in) (432-7013)CY481$595.00$462.90$625.00$698.00$808.80$730.00$850.00
97Riprap (stone common)(dry)(8 in) (432-7030)CY2$195.00$159.02$570.00$247.00$620.77$450.00$500.00
98Riprap (stone common)(dry)(12 in) (432-7031)CY1,264$180.00$92.12$200.00$181.00$195.28$225.00$210.00
99Riprap (stone protection)(12 in) (432-7041)CY372$195.00$106.27$200.00$165.00$202.26$240.00$210.00
100Riprap (stone protection)(18 in) (432-7043)CY922$195.00$90.82$200.00$161.00$190.06$245.00$210.00
101Elastomeric bearing (E10) (434-7030)EACH5$4,000.00$5,589.56$5,800.00$4,662.00$6,159.92$7,900.00$5,200.00
102Elastomeric bearing (F10) (434-7040)EACH5$4,000.00$5,589.56$5,800.00$4,662.00$5,905.26$7,900.00$5,200.00
103Sliding elastomeric bearing (ES 8) (434-7048)EACH10$4,000.00$4,807.13$5,600.00$4,418.00$4,855.86$7,000.00$5,000.00
104Cleaning and sealing existing joints (CL3) (438-7004)LF140$35.00$38.00$15.00$44.54$42.00$42.00
105Cleaning and sealing existing joints (CL7) (438-7007)LF280$42.00$46.00$5.00$22.27$21.00$50.00
106Polyester polymer concrete overlay (1-1/2") (439-7016)SY1,901$173.00$190.00$221.00$244.30$221.00$220.00
107STR steel (plate girder) (442-7001)LB2,870,000$2.38$2.18$2.18$2.25$2.25$2.18$2.10
108Rail (type T402) (450-7012)LF9,356.30$160.00$141.73$154.00$164.00$139.00$190.00$215.00
109Rail (type SSTR) (450-7024)LF10,746.70$75.00$80.95$108.00$70.00$70.00$82.00$98.00
110Retrofit rail (type T402) (451-7012)LF245$175.45$270.00$356.00$422.97$220.00$300.00
111Sealed expansion joint (4 in) (SEJ - M) (454-7004)LF904$250.00$167.09$190.00$225.00$250.00$208.00$285.00
112Sealed expansion joint (5 in) (SEJ - M) (454-7005)LF90$250.00$177.77$192.00$235.00$260.00$365.00$285.00
113Header type expansion joint (454-7009)CF29$6.56$83.00$50.00$684.52$530.00$1.00
114Joint sealant (454-7010)LF280$0.10$15.00$5.00$45.35$26.00$1.00
115Concrete box culvert (4 FT X 2 FT) (462-7003)LF1,007$440.00$348.45$450.00$284.00$740.55$385.00$370.00
116Concrete box culvert (6 FT X 4 FT) (462-7012)LF684$485.00$563.66$850.00$533.00$1,151.75$625.00$800.00
117Concrete box culvert (5 FT X 3 FT)(extend) (462-7062)LF19$680.00$787.74$825.00$2,010.00$3,616.27$2,300.00$940.00
118Concrete box culvert (5 FT X 4 FT)(extend) (462-7063)LF24$750.00$756.88$925.00$1,400.00$2,594.50$1,900.00$1,060.00
119Concrete box culvert (6 FT X 3 FT)(extend) (462-7066)LF29$800.00$774.08$1,100.00$1,490.00$2,393.56$2,300.00$1,250.00
120Concrete box culvert (6 FT X 4 FT)(extend) (462-7067)LF98$850.00$627.25$1,100.00$1,030.00$1,467.49$1,100.00$800.00
121Concrete box culvert (6 FT X 6 FT)(extend) (462-7069)LF147$955.46$1,200.00$882.00$1,520.14$935.00$950.00
122Concrete box culvert (8 FT X 6 FT)(extend) (462-7078)LF254$1,000.00$1,216.12$1,400.00$1,120.00$2,193.01$1,200.00$1,250.00
123RC pipe (CL III)(18 in) (464-7003)LF2,197$75.00$96.61$100.00$84.25$301.89$155.00$100.00
124RC pipe (CL III)(24 in) (464-7005)LF3,186$110.00$107.80$130.00$98.50$488.15$210.00$121.00
125RC pipe (CL III)(30 in) (464-7007)LF3,126$144.00$136.55$145.00$124.00$618.42$225.00$142.00
126RC pipe (CL III)(36 in) (464-7009)LF1,488$235.00$167.53$195.00$127.00$676.50$205.00$185.00
127RC pipe (CL IV)(24 in) (464-7021)LF11$144.00$282.63$190.00$122.00$492.74$260.00$125.00
128Junction box(complete)(PJB)(3FTX3FT) (465-7005)EACH2$6,000.00$7,852.47$6,500.00$7,820.00$8,057.55$7,800.00$7,500.00
129Junction box(complete)(PJB)(4FTX4FT) (465-7006)EACH5$8,627.28$8,100.00$8,230.00$10,056$7,800.00$9,000.00
130Junction box(complete)(PJB)(3FTX5FT) (465-7007)EACH1$7,300.00$11,823$11,000$14,880$15,589$15,000$11,500
131Junction box(complete)(PJB)(5FTX5FT) (465-7009)EACH3$8,000.00$13,179$13,000$18,760$15,913$17,000$14,000
132Inlet (complete)(pco)(3FT)(none) (465-7013)EACH4$7,000.00$7,949.32$6,700.00$6,660.00$7,930.29$6,600.00$7,600.00
133Inlet (complete)(pco)(3FT)(left) (465-7014)EACH1$8,000.45$7,300.00$6,280.00$8,292.76$6,000.00$8,200.00
134Inlet (complete)(pco)(3FT)(right) (465-7015)EACH1$7,000.00$8,239.89$7,300.00$6,280.00$8,292.76$6,000.00$8,200.00
135Inlet (complete)(pco)(3FT)(both) (465-7016)EACH14$8,000.00$8,530.42$8,600.00$7,700.00$8,775.07$7,900.00$9,700.00
136Inlet (complete)(pco)(4FT)(both) (465-7020)EACH1$8,968.96$9,000.00$7,760.00$9,565.71$7,800.00$10,100
137Inlet (complete)(pco)(5FT)(none) (465-7021)EACH1$8,200.00$12,211$11,000$12,410$13,720$10,500$11,600
138Inlet (complete)(pco)(5FT)(right) (465-7023)EACH2$7,430.00$12,404$11,000$12,970$13,979$11,000$12,100
139Inlet (complete)(pco)(5FT)(both) (465-7024)EACH2$10,000$13,664$15,000$15,960$15,784$12,000$16,600
140Inlet (complete)(PMBD)(4FT) (465-7045)EACH5$9,000.00$7,306.20$8,300.00$8,040.00$9,335.26$7,500.00$9,300.00
141Inlet (complete)(pod)(FG)(4FTX4FT) (465-7049)EACH6$6,000.00$9,219.47$7,000.00$6,880.00$9,890.92$7,500.00$7,700.00
142Inlet(complete)(pazd)(FG)(3FTX3FT-3FTX3FT) (465-7158)EACH5$7,875.00$8,000.44$7,100.00$7,870.00$9,798.25$6,800.00$7,800.00
143Inlet(complete)(pazd)(FG)(4FTX4FT-4FTX4FT) (465-7160)EACH28$7,875.00$8,872.09$8,000.00$8,980.00$11,374$9,200.00$8,700.00
144Inl(CMP)(pazd-CZ)(FG)(4FTX4FT-4FTX4FT) (465-7165)EACH2$8,872.10$8,000.00$8,480.00$10,897$7,700.00$8,700.00
145JCT box (complete)(special) (465-7332)EACH1$11,320$14,300$34,250$17,072$23,000$38,600
146Wingwall (FW - 0) (HW=3 FT) (466-7145)EACH1$9,000.00$10,608$18,000$9,520.00$13,052$31,000$20,000
147Wingwall (PW - 1) (HW=4 FT) (466-7174)EACH1$18,000$16,531$21,000$19,040$16,549$25,000$25,000
148Wingwall (PW - 1) (HW=5 FT) (466-7175)EACH1$25,333$18,420$23,000$21,520$44,951$30,000$36,200
149Wingwall (PW - 1) (HW=6 FT) (466-7176)EACH2$32,667$23,333$21,000$39,080$37,087$43,000$49,000
150Wingwall (PW - 1) (HW=7 FT) (466-7177)EACH2$40,000$24,071$23,000$46,630$37,256$43,000$45,000
151Set (type I)(S= 4 FT)(HW= 3 FT)(6:1)(C) (467-7069)EACH5$18,000$18,768$18,000$15,210$13,302$22,000$17,000
152Set (type I)(S= 5 FT)(HW= 4 FT)(3:1)(C) (467-7099)EACH1$18,322$20,000$22,150$47,769$22,000$25,000
153Set (type I)(S= 6 FT)(HW= 4 FT)(3:1)(C) (467-7128)EACH2$10,000$22,871$20,000$16,330$25,648$23,000$18,500
154Set (type I)(S= 6 FT)(HW= 5 FT)(3:1)(C) (467-7132)EACH1$10,000$23,636$20,000$21,660$37,106$24,000$32,500
155Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307)EACH2$1,590.00$1,463.45$2,300.00$2,410.00$4,086.84$2,800.00$2,700.00
156Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325)EACH2$2,000.00$1,463.45$2,300.00$1,980.00$3,859.16$2,500.00$2,800.00
157Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327)EACH12$2,500.00$1,715.80$3,400.00$2,950.00$4,414.80$2,900.00$4,100.00
158Set (type II) (36 in) (RCP) (6: 1) (C) (467-7367)EACH4$5,000.00$4,481.17$8,500.00$6,080.00$8,352.25$7,400.00$9,250.00
159Grate & frame (471-7003)EACH11$2,100.00$3,476.64$3,100.00$4,490.00$23,471$5,800.00$3,100.00
160Adjusting manholes (479-7001)EACH8$1,250.00$1,605.14$2,900.00$3,780.00$1,137.00$2,500.00$1,650.00
161Adjusting inlets (479-7002)EACH6$1,250.00$2,608.97$2,900.00$4,440.00$1,137.00$2,500.00$1,700.00
162Clean existing culverts (480-7001)EACH18$2,500.00$4,546.09$1,700.00$6,590.00$8,266.77$3,400.00$2,000.00
163Pipe (PVC) (schedule 40) (6 in) (481-7013)LF1,311$60.00$35.29$25.00$143.00$31.71$59.00$31.00
164Removing structure (box culvert) (496-7001)EACH1$10,000$22,580$15,000$10,050$244,148$42,000$16,250
165Removing structure (inlet) (496-7002)EACH16$1,250.00$1,126.24$1,200.00$1,060.00$1,651.95$920.00$1,100.00
166Removing structure (set) (496-7004)EACH11$625.00$371.92$1,600.00$1,090.00$1,436.31$475.00$1,700.00
167Removing structure (wingwall) (496-7005)EACH7$1,650.00$1,126.24$4,000.00$2,400.00$3,592.02$5,500.00$1,700.00
168Removing structure (headwall) (496-7006)EACH1$1,126.25$2,600.00$2,160.00$3,849.47$4,000.00$1,700.00
169Removing structure (pipe) (496-7007)LF2,053$25.00$14.02$50.00$41.50$166.87$13.00$41.00
170Removing structure (box culvert) (496-7008)LF48$70.00$94.08$225.00$139.00$498.09$160.00$82.00
171Removing structure (bridge slab) (496-7013)EACH1$65,618$49,000$78,300$74,059$30,000$19,500
172Removing structure (pipe) (496-7037)EACH1$750.00$9,403.53$2,700.00$2,175.38$11,113$2,100.00$1,650.00
173Removing rock riprap (496-7040)LF221$50.00$111.23$90.00$85.50$246.47$28.50$32.00
174Mobilization (500-7001)LS1$9,430,182$8,093,376$11,000,000$11,918,200$12,034,606$12,292,063$5,000,000
175Barricades, signs and traffic handling (502-7001)MO34$10,000$25,419$20,000$30,594$11,795$43,000$16,000
176Portable changeable message sign (503-7002)EACH5$11,500$17,218$19,000$22,550$27,369$20,000$25,000
177TMA (stationary) (505-7001)DAY880$200.00$457.15$190.00$122.00$2,111.80$500.00$240.00
178TMA (mobile operation) (505-7002)HR1,920$60.00$107.83$520.00$81.00$263.70$105.00$65.00
179Rock filter dams (install) (type 2) (506-7002)LF266$45.00$42.99$45.00$43.00$43.87$36.00$43.00
180Rock filter dams (install) (type 3) (506-7003)LF156$70.00$109.32$110.00$109.00$111.55$72.00$70.00
181Rock filter dams (remove) (506-7011)LF422$15.00$16.89$17.00$16.90$17.23$42.00$15.50
182Construction exits (install) (type 1) (506-7020)SY376$28.00$39.06$42.00$39.00$39.86$26.00$45.00
183Construction exits (remove) (506-7024)SY376$10.00$11.59$12.00$11.60$11.83$16.00$10.00
184Temporary sediment control fence (install) (506-7039)LF8,921$4.00$6.26$6.50$6.25$6.39$3.30$6.00
185Temporary sediment control fence (remove) (506-7041)LF8,921$1.00$0.97$1.00$0.95$0.99$1.15$0.75
186Constructing detours (508-7001)SY15,668$70.00$79.70$80.00$91.75$79.33$97.00$87.00
187Portable concrete traffic barrier (des source)(single slope)(type 1) (512-7013)LF21,060$20.00$6.67$7.00$10.50$11.03$14.00$10.25
188Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025)LF24,960$9.00$4.63$7.50$10.10$8.70$11.00$6.00
189Portable concrete traffic barrier (stockpile)(single slope)(type 1) (512-7037)LF19,320$12.00$6.67$6.20$12.10$11.55$13.00$10.00
190Permanent CTB (single slope) (type 1) (42 ) (514-7001)LF23,748$90.00$95.04$150.00$93.25$100.00$104.00$135.00
191Permanent CTB (single slope) (type 3) (42 ) (514-7002)LF120$300.00$246.85$300.00$337.00$321.70$465.00$365.00
192Permanent CTB (single slope) (mod) (514-7035)LF280$300.00$192.71$310.00$677.00$241.39$260.00$335.00
193Permanent CTB (tran SSCB to SSTR) (mod) (514-7038)LF40$275.00$192.69$440.00$634.00$269.21$380.00$335.00
194Concrete curb (mono) (type II) (529-7007)LF9,954$15.00$12.44$6.50$5.05$5.54$12.50$5.35
195Concrete curb & gutter (type I) (529-7008)LF3,358$25.00$16.82$27.00$38.00$30.95$37.00$37.00
196Concrete curb & gutter (type II) (529-7009)LF1,994$45.00$23.91$19.00$40.50$31.64$38.00$36.00
197Driveways (concrete) (hes) (530-7007)SY1,295$125.00$92.82$116.00$122.00$121.79$140.00$125.00
198Driveways (ACP) (530-7010)SY154$117.16$124.00$92.00$87.92$120.00$155.00
199Concrete sidewalks (4") (531-7001)SY617$90.00$53.64$72.00$85.25$95.99$100.00$98.00
200Curb ramps (type 1) (531-7005)EACH5$2,800.00$2,574.77$3,500.00$3,210.00$2,595.89$2,300.00$2,700.00
201Curb ramps (type 2) (531-7006)EACH1$3,000.00$2,854.61$3,500.00$4,580.00$2,708.03$4,000.00$2,800.00
202Curb ramps (type 10) (531-7011)EACH2$3,000.00$2,854.60$4,000.00$5,010.00$2,708.03$4,300.00$2,800.00
203Mill rumble strips (asphalt) (shoulder) (533-7001)LF118,339$0.20$0.06$0.27$0.15$0.35$0.22$0.16
204Concrete directional island (536-7004)SY144$93.02$125.00$114.00$155.43$140.00$160.00
205Metal W-beam guard fence (steel post) (540-7002)LF3,735$32.00$26.75$30.00$29.50$25.22$30.00$31.00
206Metal beam guard fence trans (thrie-beam) (540-7005)EACH25$2,250.00$1,900.00$2,250.00$2,200.00$2,626.66$2,400.00$2,600.00
207Downstream anchor terminal section (540-7015)EACH6$1,450.00$1,300.00$1,250.00$1,200.00$1,239.30$1,300.00$1,868.32
208Remove metal beam guard fence (542-7001)LF1,437.50$3.33$2.50$3.00$2.80$3.29$8.35$6.00
209Remove downstream anchor terminal (542-7003)EACH5$225.00$200.00$180.00$175.00$252.25$215.00$205.00
210RM metal beam guard fence trans (thrie-beam) (542-7004)EACH15$287.50$150.00$260.00$250.00$285.15$325.00$322.00
211Guardrail end treatment (install) (544-7001)EACH22$3,220.00$3,100.00$3,000.00$2,950.00$3,564.36$3,600.00$3,500.00
212Guardrail end treatment (remove) (544-7003)EACH16$285.00$200.00$255.00$250.00$361.92$430.00$325.00
213Crash cushion attenuator (move & reset) (545-7002)EACH21$1,500.00$2,000.00$1,700.00$1,470.00$1,667.02$1,700.00$2,000.00
214Crash cushion attenuator (stockpile) (545-7003)EACH24$1,200.00$1,000.00$980.00$1,250.00$926.73$880.00$405.00
215Crash cushion attenuator (remove) (545-7004)EACH1$1,000.00$1,000.00$1,200.00$813.00$1,129.63$1,080.00$405.00
216Crash cushion attenuator (install)(R)(N)(TL3) (545-7010)EACH4$27,000$26,200$33,000$30,270$32,682$36,000$30,000
217Cca (install)(N)(TL3)(work zone) (545-7018)EACH20$7,500.00$8,175.00$9,000.00$7,480.00$8,609.29$8,200.00$8,650.00
218Pipe underdrains (type 8) (6") (556-7008)LF7,730$30.00$36.44$45.00$9.30$27.57$33.25$30.00
219Remove RD IL asm (trans-base) (610-7009)EACH18$700.00$990.00$525.00$990.00$499.98$505.00$1,200.00
220Replace luminaire W/(250W EQ) LED (610-7012)EACH12$625.00$580.00$900.00$580.00$864.55$875.00$675.00
221In RD IL (U/P) (type 1) (150W EQ) LED (610-7014)EACH10$2,020.00$1,880.00$2,200.00$1,880.00$2,083.25$2,100.00$2,200.00
222In RD IL (type SA) 40B-8 (250W EQ) LED (610-7108)EACH1$4,000.00$4,595.00$6,200.00$4,600.00$5,937.27$6,000.00$5,350.00
223In RD IL (type SA) 40T-8 (250W EQ) LED (610-7124)EACH31$6,000.00$4,286.00$4,800.00$4,290.00$4,583.16$4,600.00$5,000.00
224In RD IL (type SA) 40T-12 (250W EQ) LED (610-7128)EACH3$8,000.00$5,360.00$4,800.00$5,360.00$4,583.16$4,600.00$6,250.00
225Conduit (PVC) (schedule 40) (2") (618-7030)LF10,337$18.00$8.95$20.00$8.95$18.75$18.75$10.45
226Conduit (PVC) (schedule 40) (3") (618-7036)LF272$20.00$11.45$36.00$11.50$34.37$35.00$13.40
227Conduit (PVC) (schedule 80) (2") (bore) (618-7055)LF676$20.00$30.00$61.00$30.00$58.33$59.00$35.00
228Conduit (PVC) (schedule 80) (3") (bore) (618-7061)LF676$29.00$33.76$64.00$33.75$61.46$62.00$40.00
229Electrical conductor (no.8) bare (620-7007)LF8,304$2.00$1.86$2.20$1.85$2.08$2.10$2.17
230Electrical conductor (no.6) bare (620-7009)LF38$2.65$3.00$2.65$2.92$2.95$3.09
231Electrical conductor (no.6) insulated (620-7010)LF76$2.65$3.20$2.65$3.02$3.05$3.09
232Tray cable (3 conductor) (8 AWG) (621-7004)LF1,976$4.60$3.21$4.00$3.20$3.91$3.95$3.75
233Ground box type A (122311)W/apron (624-7002)EACH20$1,750.00$880.00$2,200.00$880.00$2,083.25$2,100.00$1,027.00
234Ground box type D (162922)W/apron (624-7008)EACH8$1,750.00$1,295.00$2,550.00$1,300.00$2,395.74$2,400.00$1,515.00
235Remove ground box (624-7013)EACH1$400.00$300.00$185.00$300.00$177.08$180.00$350.00
236Aluminum signs (type G) (636-7002)SF2,515.75$32.00$35.81$32.00$35.75$37.99$30.00$42.00
237Aluminum signs (type O) (636-7003)SF2,300$36.00$30.97$32.00$31.00$52.45$30.00$36.00
238Replace existing aluminum signs(type A) (636-7004)SF210.40$40.00$45.60$38.00$45.50$45.06$45.00$53.00
239Replace existing aluminum signs(type G) (636-7005)SF402.50$35.00$53.75$37.00$53.75$5.07$37.00$63.00
240Replace existing aluminum signs(type O) (636-7006)SF472.25$51.00$42.00$51.00$44.79$42.00$60.00
241Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH2$750.00$717.00$720.00$717.00$841.18$805.00$840.00
242Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002)EACH2$895.00$831.00$760.00$831.00$884.88$850.00$970.00
243Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH38$850.00$797.00$790.00$797.00$1,037.82$995.00$930.00
244Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH2$985.00$1,157.00$920.00$1,160.00$1,245.38$1,200.00$1,350.00
245Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026)EACH2$1,100.00$1,215.00$900.00$1,220.00$1,048.74$1,000.00$1,420.00
246Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH9$1,000.00$979.80$910.00$980.00$7.65$10.00$1,150.00
247Install small roadside sign support and assembly TYS80(1)SA(U-exal) (644-7036)EACH5$1,175.00$1,597.00$1,100.00$1,600.00$1,730.42$1,400.00$1,900.00
248Install small roadside sign support and assembly TYS80(2)SA(P-exal) (644-7049)EACH1$2,175.00$1,650.00$2,180.00$2,485.29$2,400.00$2,550.00
249Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057)EACH30$500.00$900.00$500.00$900.00$636.89$560.00$1,050.00
250In bridge MNT clearance sign assembly(type N) (644-7061)EACH7$2,390.00$3,187.00$2,700.00$3,190.00$2,690.52$2,600.00$3,750.00
251In bridge MNT clearance sign assembly(type S) (644-7062)EACH3$2,635.00$2,865.00$2,700.00$2,870.00$2,414.29$2,700.00$3,350.00
252Install small roadside sign support and assembly (rail mount) (644-7063)EACH1$5,000.00$5,800.00$6,100.00$5,800.00$4,631.93$4,500.00$6,750.00
253Remove SM RD SN sup&AM (644-7073)EACH80$120.00$89.00$102.00$89.00$109.24$105.00$104.00
254Relocate SM RD SN sup & AM type temporary (644-7077)EACH19$430.00$675.00$502.00$675.00$7.16$7.00$790.00
255Install LRSS (struct steel) (647-7001)LB12,510.90$8.00$7.80$6.30$7.80$6.72$6.35$9.15
256Remove lrsa (647-7003)EACH16$1,000.00$1,010.70$825.00$1,010.00$802.94$820.00$1,200.00
257Install overhead sign support(35 FT cant) (650-7038)EACH2$43,250$36,000$43,250$34,270$34,500$51,000
258Install overhead sign support(65 FT BRDG) (650-7074)EACH2$90,000$58,790$59,000$58,800$58,331$59,000$68,000
259Install overhead sign support(80 FT BRDG) (650-7089)EACH1$100,000$55,380$69,000$55,400$68,018$68,000$65,000
260Install overhead sign support(95 FT BRDG) (650-7104)EACH1$112,500$75,760$84,000$75,800$82,705$83,000$88,000
261Install overhead sign support(105 FT BRDG) (650-7114)EACH1$93,760$107,000$93,800$106,246$105,000$110,000
262Install overhead sign support(115 FT BRDG) (650-7124)EACH2$128,500$128,940$114,000$128,900$112,496$112,000$150,000
263Relocate existing overhd sign sup (650-7192)EACH1$40,000$15,988$32,000$15,990$31,249$31,500$18,500
264Remove overhd sign sup (650-7193)EACH2$9,670.00$5,100.00$9,670.00$4,999.81$5,000.00$11,250
265Remove overhd sign sup (sign only) (650-7194)EACH4$1,200.00$3,590.00$700.00$3,590.00$677.06$685.00$4,200.00
266Install delineator assembly (D-SW)SZ 1(WFLX)GND (658-7003)EACH65$75.00$88.00$47.00$45.00$109.24$98.00$41.00
267Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH117$12.00$15.00$22.00$20.00$26.22$16.00$41.00
268Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH35$35.00$45.00$46.00$45.00$49.16$48.00$60.00
269Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH6$45.00$46.00$45.00$49.16$48.50$60.00
270Install delineator assembly (D-SY)SZ 1(yflx)GND (658-7023)EACH13$89.00$46.00$45.00$109.24$100.00$41.00
271Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031)EACH71$22.00$15.00$21.00$20.00$26.22$16.50$41.00
272Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032)EACH241$22.00$15.00$21.00$20.00$26.22$17.00$21.00
273Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036)EACH22$30.00$45.00$46.00$45.00$49.16$48.00$41.00
274Install delineator assembly (D-DW)SZ 1(WFLX)GND (658-7045)EACH98$84.00$90.00$46.00$45.00$109.24$100.00$41.00
275Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF2,600$0.40$0.43$0.60$0.45$0.38$0.45$0.66
276Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF21,563$0.35$0.37$0.60$0.45$0.38$0.40$0.66
277Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF3,048$0.75$0.95$0.70$0.55$0.66$1.00$0.81
278Work zone pavement marking non-removing (W)12"(solid) (662-7015)LF1,332$1.50$2.15$1.80$1.35$2.08$2.25$1.99
279Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF24,942$0.35$0.37$0.61$0.40$0.38$0.40$0.62
280Work zone pavement marking removing (reflectorized) type I-C (662-7049)EACH235$3.00$6.00$5.20$4.00$3.28$6.30$5.86
281Work zone pavement marking removing (reflectorized) type II-A-A (662-7051)EACH181$3.75$5.00$5.20$4.00$3.28$5.25$5.86
282Work zone pavement marking removing (reflectorized) type II-C-R (662-7053)EACH266$5.70$7.00$5.20$4.00$3.28$7.35$5.86
283Work zone pavement marking removing (W)6"(broken) (662-7065)LF3,310$1.20$1.75$2.60$2.00$2.07$1.85$2.93
284Work zone pavement marking removing (W)6"(DOT) (662-7066)LF398$2.00$1.75$0.66$0.50$3.29$1.85$0.73
285Work zone pavement marking removing (W)6"(solid) (662-7068)LF18,542$1.00$0.70$0.66$0.50$2.07$0.75$0.73
286Work zone pavement marking removing (W)8"(solid) (662-7072)LF1,337$2.35$2.15$0.80$0.60$2.41$2.25$0.88
287Work zone pavement marking removing (W)12"(lane drop) (662-7074)LF252$4.10$1.70$1.30$4.39$4.30$1.95
288Work zone pavement marking removing (W)24"(solid) (662-7077)LF20$15.50$3.50$2.70$6.58$16.00$3.95
289Work zone pavement marking removing (W)(arrow) (662-7082)EACH7$250.00$280.00$195.00$152.00$169.99$295.00$223.00
290Work zone pavement marking removing (W)(double arrow) (662-7083)EACH1$500.00$390.00$540.00$425.00$195.21$410.00$623.00
291Work zone pavement marking removing (W)(word) (662-7092)EACH2$235.00$365.00$340.00$267.00$180.96$385.00$390.00
292Work zone pavement marking removing (Y)6"(solid) (662-7100)LF18,204$1.00$0.70$0.66$0.50$2.07$0.75$0.73
293Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF881$1.25$0.92$0.66$0.50$1.09$1.00$0.73
294Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF159$1.40$1.30$1.00$0.75$1.09$1.40$1.10
295Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF22,147$1.00$1.06$0.70$0.55$0.93$1.10$0.78
296Reflectorized pavement marking type I (W)12"(lane drop)(100MIL) (666-7027)LF1,134$2.50$1.83$0.90$0.70$3.56$1.90$1.03
297Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF9,194$3.50$4.40$0.90$0.70$3.67$4.60$1.03
298Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF787$7.00$12.15$3.40$2.65$5.48$12.75$3.85
299Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123)LF1,987$7.00$10.25$3.40$2.65$5.48$10.80$3.85
300Type I high perf PM (W)6"(broken)(100MIL) (666-7290)LF23,010$0.75$0.63$0.57$0.45$0.82$0.65$0.66
301Type I high perf PM (W)6"(solid)(100MIL) (666-7293)LF102,292$0.71$0.62$0.57$0.45$0.82$0.65$0.66
302Type I high perf PM (Y)6"(broken)(100MIL) (666-7302)LF1,520$0.63$0.66$0.50$0.82$0.65$0.73
303Type I high perf PM (Y)6"(solid)(100MIL) (666-7305)LF116,124$0.60$0.62$0.57$0.45$0.82$0.65$0.66
304Pavement sler 6" (666-7347)LF39,226$0.40$0.23$0.33$0.25$0.38$0.24$0.37
305Pavement sler 8" (666-7348)LF3,858$0.55$0.46$0.33$0.25$0.49$0.48$0.37
306Pavement sler 12" (666-7350)LF948$0.90$1.55$0.35$0.25$0.97$1.60$0.38
307Pavement sler 24" (666-7352)LF586$2.00$3.10$0.35$0.25$1.75$3.25$0.38
308Pavement sler (arrow) (666-7353)EACH18$50.00$45.00$73.00$57.00$27.42$47.00$84.00
309Pavement sler (word) (666-7354)EACH18$50.00$60.00$85.00$66.75$27.42$63.00$98.00
310Pavement sler (yld tri) (666-7365)EACH16$15.00$20.00$24.00$19.00$38.38$21.00$28.00
311Prefabricated PM type C (W)(arrow) (668-7091)EACH50$220.00$230.00$320.00$250.00$208.37$240.00$365.00
312Prefabricated PM type C (W)(LN reduct arrow) (668-7100)EACH6$450.00$630.00$590.00$466.00$383.84$660.00$680.00
313Prefabricated PM type C (W)(number) (668-7102)EACH3$220.00$490.00$290.00$219.00$274.17$515.00$320.00
314Prefabricated PM type C (W)(word) (668-7103)EACH46$280.00$295.00$360.00$280.00$274.17$310.00$410.00
315Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH16$95.00$55.00$75.00$57.00$87.74$58.00$84.00
316Reflectorized pavement marker type II-A-A (672-7004)EACH642$4.00$5.10$5.10$4.00$7.13$5.35$5.85
317Reflectorized pavement marker type II-C-R (672-7006)EACH2,648$4.00$5.10$5.10$4.00$7.13$5.35$5.85
318Eliminating existing PM & markers (4") (677-7001)LF39,951$1.00$0.55$0.26$0.20$0.79$0.58$0.29
319Eliminating existing PM & markers (8") (677-7004)LF2,119$1.00$1.45$0.26$0.20$1.32$1.50$0.29
320Eliminating existing PM & markers (12") (677-7006)LF1,000$2.00$3.85$0.50$0.40$4.39$4.05$0.57
321Eliminating existing PM & markers (24") (677-7008)LF1,915$3.50$6.25$0.60$0.45$6.58$6.60$0.64
322Eliminating existing PM & markers (arrow) (677-7009)EACH11$60.00$145.00$12.00$9.50$93.22$150.00$14.00
323Eliminating existing PM & markers (word) (677-7015)EACH9$65.00$175.00$12.00$9.50$93.22$185.00$14.00
324Install highway traffic signal (system) (680-7003)EACH1$41,886$20,000$41,890$18,853$19,000$49,000
325Removing traffic signals (680-7004)EACH1$9,680.00$7,800.00$9,680.00$7,291.39$7,400.00$11,300
326Vehicle signal section (12")LED(green) (682-7001)EACH14$300.00$358.00$400.00$358.00$385.40$390.00$420.00
327Vehicle signal section (12")LED(green arrow) (682-7002)EACH4$300.00$365.00$400.00$365.00$385.40$390.00$425.00
328Vehicle signal section (12")LED(yel) (682-7003)EACH14$300.00$358.00$400.00$358.00$385.40$390.00$420.00
329Vehicle signal section (12")LED(yel arrow) (682-7004)EACH4$300.00$365.00$400.00$365.00$385.40$390.00$425.00
330Vehicle signal section (12")LED(red) (682-7005)EACH14$300.00$358.00$400.00$358.00$385.40$390.00$420.00
331Vehicle signal section (12")LED(red arrow) (682-7006)EACH2$300.00$365.00$400.00$365.00$385.40$390.00$425.00
332Pedestrian signal section (LED)(countdown) (682-7018)EACH4$900.00$828.00$1,050.00$828.00$989.55$1,000.00$1,000.00
333Backplate W/reflectorized border(3 sec)aluminum (682-7039)EACH14$170.00$165.00$210.00$165.00$197.91$200.00$195.00
334Backplate W/reflectorized border(5 sec)aluminum (682-7041)EACH2$265.00$225.00$250.00$225.00$239.58$240.00$262.00
335Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007)LF3,406$2.00$2.25$2.50$2.25$2.29$2.35$2.65
336Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012)LF3,376$3.50$2.31$4.60$2.30$4.48$4.50$2.70
337Traffic signal CBL (type A)(12 AWG)(16 conductor) (684-7021)LF2,228$9.00$3.87$8.00$3.85$7.81$7.90$4.52
338Ins traffic signal PL AM(S)1 arm(32')lum (686-7035)EACH1$15,000$12,587$13,000$12,590$12,291$12,400$15,000
339Ins traffic signal PL AM(S)1 arm(44')lum (686-7047)EACH3$18,000$14,248$16,000$14,250$15,312$15,400$16,700
340Ins traffic signal PL AM(S)2 arm(44-36')lum (686-7167)EACH1$18,770$25,000$18,770$23,020$23,000$22,000
341Pedestrian pole assembly (687-7001)EACH3$3,300.00$2,580.00$1,600.00$2,580.00$1,562.44$1,580.00$3,025.00
342Full - width mowing (730-7019)CYC6$4,500.00$4,867.00$8,100.00$5,230.00$4,828.27$16,000$6,450.00
343Litter removal (734-7002)CYC12$1,400.00$2,206.75$4,200.00$2,560.00$2,981.33$6,700.00$4,600.00
344Debris removal (CNTR medians/mainlanes) (735-7014)CYC136$1,240.00$1,175.82$1,100.00$801.00$2,347.79$1,800.00$1,025.00
345Debris removal (spot debris) (735-7072)MI102$150.00$587.91$125.00$1,030.00$172.63$695.00$155.00
346Cleaning / sweeping (center median) (738-7001)MI34$250.00$1,969.38$350.00$729.00$576.96$195.00$292.00
347Cleaning / sweeping (outside main lane) (738-7028)CYC34$4,000.00$1,969.38$3,400.00$2,710.00$1,153.91$890.00$584.00
348Cleaning / sweeping (frontage road) (738-7050)CYC12$2,500.00$1,969.39$3,600.00$2,400.00$1,153.91$1,850.00$1,175.00
349Cleaning / sweeping (aggregate removal) (738-7103)MI8$150.00$5,908.15$1,300.00$2,360.00$2,307.82$1,750.00$1,750.00
350Anti-graffiti coatng (permnent-type III) (740-7006)SF172,376$1.00$1.07$1.10$1.05$1.07$1.10$1.25
351Underseal course (3006-7001)GAL45,078$4.00$3.05$3.20$3.10$3.16$3.20$4.10
352VDS prosr sys (6017-7001)EACH1$11,450$15,000$11,450$14,583$14,500$12,526
353VIVDS cam assy var LNS (6017-7003)EACH6$4,000.00$2,795.00$3,000.00$2,800.00$2,916.55$2,900.00$3,300.00
354VDS CNTRL software (6017-7009)EACH1$500.00$400.00$500.00$385.40$390.00$585.00
355VDS cabling (6017-7012)LF2,618$3.50$2.83$2.10$2.85$2.03$2.05$3.30
356Remove and relocate DMS (6054-7002)EACH1$38,750$25,000$38,750$24,374$25,000$45,000
357Aluminum electrical cond (#8 XHHW) (6071-7004)LF16,408$1.50$2.63$1.65$2.65$1.56$1.60$3.07
TxDOT contract A00004604: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of November 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy