TxDOT contract A00014162 bid tabulation

Widen Road - Add Lanes, US 377 (South of FM 1171 to Crawford Road). Let by Texas DOT on May 6, 2026, Denton, Dallas District. 9 bids received; low bid $111,363,901 by Webber, LLC, -0.2% against the engineer's estimate of $111,532,677.

Owner
Texas DOT
Letting
06 MAY 2026
Pay items
334
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Webber, LLC$111,363,901Low0.0%
2Granite Construction Company$112,963,312+1.0%+1.0%
3Sema Construction, Inc.$113,483,925+2.0%+2.0%
4Mario Sinacola & Sons Excavating, Inc.$123,505,894+11%+11%
5Pulice Construction, Inc.$125,812,989+13%+13%
6RPM Xconstruction, LLC$126,755,164+14%+14%
7Indus Road & Bridge, Inc.$129,336,611+16%+16%
8Zachry Construction Corporation$135,215,129+21%+21%
9Austin Bridge & Road Services, LP$147,271,158+32%+32%
TxDOT contract A00014162: bids by rank

Engineer's estimate: $111,532,677.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Webber, LLC2. Granite Construction Company3. Sema Construction, Inc.4. Mario Sinacola & Sons Excavating, Inc.5. Pulice Construction, Inc.6. RPM Xconstruction, LLC
1Preparing row (100-7002)STA324$14,500$5,970.00$25,000$35,026$5,900.00$33,000$10,000
2Removing concrete (pavement) (104-7001)SY9,962$10.00$12.70$15.00$17.22$16.00$23.15$11.00
3Removing concrete (riprap) (104-7006)SY1,087$9.00$14.80$13.00$14.47$16.00$27.39$21.00
4Removing concrete (driveways) (104-7011)SY2,864$15.00$14.30$12.00$18.21$16.00$28.48$10.00
5Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY1,405$24.00$14.20$15.00$14.31$16.00$28.05$17.00
6Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002)SY16,499$8.00$4.35$2.00$8.40$5.00$7.00$6.24
7Remove (9"-13") TRT/untrt base & asphalt pavement (105-7009)SY148,447$7.00$8.00$3.00$5.62$6.00$7.00$7.68
8Remove (15"-19") TRT/untrt base & asphalt pavement (105-7015)SY20,883$15.00$15.00$4.00$9.83$10.00$24.00$12.34
9Excavation (roadway) (110-7001)CY147,533$14.00$15.70$10.00$7.00$12.00$8.50$9.39
10Embankment (final)(DC)(type C1) (132-7008)CY270,825$15.00$15.50$9.00$8.00$10.00$13.00$15.83
11Embankment (final)(DC)(type C2) (132-7010)CY7,159$30.00$32.75$50.00$35.80$40.00$65.00$35.00
12Compost manuf topsoil (4") (161-7002)SY248,153$0.90$1.80$2.15$1.97$1.25$8.00$2.00
13Block sodding (162-7002)SY248,536$4.00$3.35$3.44$3.01$4.00$3.55$3.65
14Drill seed (temporary_warm_cool) (164-7015)SY2,500$0.21$0.60$0.63$1.95$3.00$1.97$2.05
15Vegetative watering (168-7001)TGL37,344$7.00$9.55$0.10$0.01$0.10$3.78$1.00
16FL BS (compacted in place)(type D GR 1-2) (12") (247-7125)SY6,635$35.00$22.30$25.00$24.07$23.00$28.08$25.48
17Lime (com or QK)(slurry) (260-7005)TON5,785$295.00$301.00$297.00$303.11$300.00$318.00$326.00
18Lime TRT (existing material)(8") (260-7007)SY347,260$4.75$3.55$6.00$5.72$6.00$3.50$4.39
19Prime coat(MC-30 or AE-P) (310-7013)GAL1,990$5.00$7.30$7.35$7.30$7.30$7.05$7.60
20SP mixes SP-B PG64-22 (344-7001)TON77,567$95.00$99.75$100.37$99.70$99.70$95.00$103.00
21SP mixes SP-C sac-A PG70-22 (344-7020)TON1,228$160.00$151.00$151.82$150.80$150.70$145.00$155.75
22Tack coat (344-7077)GAL910$2.00$6.50$6.54$6.50$6.50$6.28$6.75
23Concrete pavement (CRCP) (12") (360-7006)SY283,993$87.00$100.00$92.00$83.46$115.00$92.75$100.00
24Concrete pavement (CRCP)(hes) (12") (360-7051)SY6,652$130.00$177.50$110.00$102.15$135.00$141.00$157.00
25Cut & restoring pavement (400-7006)SY3,984$230.00$238.00$175.00$85.00$135.00$110.00$335.00
26Cem stabil BKFL (400-7010)CY544$195.00$148.00$185.00$300.00$200.00$179.65$231.00
27Trench excavation protection (402-7001)LF26,377$3.50$6.00$2.00$9.80$1.00$3.00$11.00
28Temporary special shoring (403-7001)SF116,133$28.00$5.10$15.00$5.56$5.00$21.00$15.00
29Drilled shaft (18 in) (416-7002)LF206$100.00$115.00$110.00$80.23$100.00$214.01$78.00
30Drilled shaft (24 in) (416-7004)LF60$300.00$230.00$160.00$145.00$125.00$147.96$154.00
31Drilled shaft (36 in) (416-7006)LF1,274$160.00$211.00$220.00$187.47$200.00$274.00$176.00
32Drilled shaft (60 in) (416-7010)LF476$600.00$546.00$520.00$506.01$600.00$579.99$511.00
33Drilled shaft (traffic signal pole) (30 in) (416-7043)LF55$700.00$312.00$320.81$311.95$231.17$318.32$330.00
34Drilled shaft (traffic signal pole) (36 in) (416-7044)LF195$600.00$335.00$342.02$334.62$336.24$341.45$355.00
35Drilled shaft (traffic signal pole) (48 in) (416-7046)LF242$820.00$566.00$577.24$566.33$577.92$577.89$600.00
36Class A concrete (flume) (420-7006)CY81.90$1,000.00$771.00$1,000.00$700.11$800.00$1,269.06$868.00
37Class C concrete (abutment)(HPC) (420-7013)CY111.30$1,000.00$1,440.00$1,300.00$1,210.99$1,550.00$2,000.00$1,300.00
38Class C concrete (cap)(HPC) (420-7023)CY106.10$1,200.00$971.00$1,400.00$1,418.89$1,550.00$2,100.00$1,267.00
39Class C concrete (column)(HPC) (420-7039)CY140.50$2,000.00$1,030.00$1,600.00$1,445.80$1,550.00$1,900.00$1,210.00
40Reinforced concrete slab (HPC) (422-7002)SF25,758$20.00$23.60$25.50$22.12$25.00$22.00$26.50
41Approach slab (422-7013)CY148$550.00$636.00$710.00$603.53$600.00$852.05$770.00
42Bridge median (HPC) (422-7021)SF6,042$13.50$12.10$10.00$10.52$18.00$10.00$12.00
43Retaining wall (cast-in-place) (423-7016)SF35,502$70.00$136.00$116.00$87.58$120.00$142.00$130.00
44Retaining wall (drilled shaft) (fascia) (423-7019)SF640$120.00$102.00$100.00$134.10$250.00$125.00$120.00
45Prestressed concrete girder (TX54) (425-7005)LF3,400.17$210.00$217.00$230.00$239.08$200.00$205.00$239.00
46Riprap (concrete)(4 in) (432-7001)CY1,088$400.00$516.00$360.00$520.23$800.00$400.00$720.00
47Riprap (concrete)(5 in) (432-7002)CY42$550.00$514.00$500.00$515.10$900.00$1,100.00$765.00
48Riprap (concrete)(CL B) (432-7005)CY3$850.00$572.00$1,100.00$575.23$2,500.00$1,000.00$870.00
49Riprap (mow strip)(4 in) (432-7013)CY267$800.00$562.00$575.00$565.23$900.00$670.00$865.00
50Riprap (stone protection)(12 in) (432-7041)CY2,437$120.00$154.00$133.21$169.32$135.00$185.00$166.50
51Riprap (stone protection)(15 in) (432-7042)CY474$150.00$175.00$141.78$188.11$145.00$186.00$170.00
52Riprap (stone protection)(18 in) (432-7043)CY186$150.00$179.00$144.49$186.71$150.00$190.00$171.00
53Riprap (stone protection)(21 in) (432-7044)CY418$200.00$174.00$145.08$182.29$155.00$200.00$170.50
54Riprap (stone protection)(24 in) (432-7045)CY342$190.00$181.00$147.21$186.77$160.00$205.00$175.00
55Riprap (stone protection)(30 in) (432-7047)CY394$200.00$185.00$158.66$189.50$170.00$210.00$185.00
56Riprap (concrete)(CL B)(RR8&RR9) (432-7055)CY150$575.00$546.00$665.94$535.18$800.00$847.67$765.00
57Rail (type T221) (450-7004)LF4,475$120.00$88.75$80.00$77.73$80.00$75.00$99.98
58Rail (type T223)(HPC) (450-7009)LF708$155.00$144.00$220.00$173.00$200.00$230.00$307.81
59Rail (type C221) (450-7032)LF1,203$165.00$238.00$120.00$152.89$210.00$270.00$192.11
60Rail (type PR22) (450-7045)LF204$400.00$172.00$160.00$164.32$115.00$200.00$184.22
61Sealed expansion joint (4 in) (SEJ - M) (454-7004)LF162$180.00$257.00$240.00$182.24$230.00$185.00$188.00
62Concrete box culvert (3 FT X 2 FT) (462-7001)LF50$350.00$246.00$250.00$243.08$420.00$300.00$295.00
63Concrete box culvert (4 FT X 3 FT) (462-7004)LF944$350.00$239.00$275.00$254.13$290.00$325.00$365.50
64Concrete box culvert (4 FT X 4 FT) (462-7005)LF2,436$350.00$277.00$300.00$290.71$340.00$330.00$395.00
65Concrete box culvert (5 FT X 3 FT) (462-7007)LF177$340.00$499.00$325.00$317.75$385.00$340.00$441.50
66Concrete box culvert (5 FT X 4 FT) (462-7008)LF170$550.00$524.00$350.00$451.48$410.00$345.00$480.00
67Concrete box culvert (6 FT X 6 FT) (462-7014)LF264$1,500.00$691.00$450.00$487.59$480.00$430.00$690.00
68Concrete box culvert (7 FT X 3 FT) (462-7015)LF91$880.00$697.00$475.00$559.53$620.00$450.00$666.00
69Concrete box culvert (7 FT X 6 FT) (462-7018)LF642$880.00$758.00$525.00$554.90$585.00$530.00$815.00
70Concrete box culvert (7 FT X 7 FT) (462-7019)LF728$870.00$787.00$600.00$620.23$630.00$700.00$810.00
71Concrete box culvert (10 FT X 5 FT) (462-7033)LF107$1,000.00$952.00$700.00$755.32$870.00$1,100.00$1,300.00
72Concrete box culvert (11 FT X 8 FT) (462-7043)LF3,193$1,100.00$1,070.00$1,400.00$1,434.36$1,600.00$1,400.00$1,620.00
73RC pipe (CL III)(18 in) (464-7003)LF29$105.00$119.00$60.00$230.65$100.00$80.01$105.00
74RC pipe (CL III)(24 in) (464-7005)LF40,226$80.00$85.75$70.00$84.77$90.00$80.00$105.00
75RC pipe (CL III)(30 in) (464-7007)LF7,416$115.00$98.00$110.00$95.89$115.00$110.00$135.00
76RC pipe (CL III)(36 in) (464-7009)LF7,363$150.00$128.00$120.00$126.04$140.00$130.00$175.00
77RC pipe (CL III)(42 in) (464-7010)LF1,310$280.00$169.00$150.00$167.30$170.00$170.00$240.00
78RC pipe (CL III)(48 in) (464-7011)LF1,581$290.00$189.00$175.00$218.93$225.00$200.00$300.00
79RC pipe (CL III)(60 in) (464-7013)LF1,202$350.00$285.00$250.00$302.28$300.00$260.00$420.00
80RC pipe (CL V)(24 in) (464-7034)LF130$160.00$134.00$100.00$97.20$135.00$145.00$175.00
81Junction box(complete)(PJB)(3FTX3FT) (465-7005)EACH3$6,500.00$5,220.00$5,000.00$9,117.64$7,700.00$6,346.87$5,575.00
82Junction box(complete)(PJB)(4FTX4FT) (465-7006)EACH1$15,000$6,080.00$5,000.00$9,888.34$5,200.00$6,416.04$5,815.00
83Junction box(complete)(PJB)(5FTX5FT) (465-7009)EACH1$9,500.00$6,970.00$6,000.00$10,698$6,000.00$8,387.56$6,645.00
84Junction box(complete)(PJB)(5FTX6FT) (465-7010)EACH1$8,400.00$6,660.00$8,000.00$10,419$11,000$10,481$8,615.00
85Junction box(complete)(PJB)(8FTX8FT) (465-7012)EACH1$8,000.00$10,820$20,000$14,237$16,500$23,745$17,075
86Inlet (complete)(pcu)(3FT)(none) (465-7029)EACH35$8,000.00$7,230.00$5,000.00$6,172.48$10,000$6,581.46$7,035.00
87Inlet (complete)(pcu)(3FT)(left) (465-7030)EACH106$8,000.00$6,970.00$5,000.00$6,443.54$10,300$6,000.00$7,480.00
88Inlet (complete)(pcu)(3FT)(right) (465-7031)EACH116$8,000.00$7,040.00$6,000.00$6,459.29$10,400$6,000.00$7,585.00
89Inlet (complete)(pcu)(3FT)(both) (465-7032)EACH30$8,000.00$7,070.00$5,900.00$6,021.89$11,600$7,183.00$8,145.00
90Inlet (complete)(pcu)(4FT)(right) (465-7035)EACH3$8,000.00$7,520.00$6,500.00$6,416.73$10,400$8,181.87$8,085.00
91Inlet (complete)(PSL)(RC)(3FTX3FT) (465-7070)EACH1$7,000.00$7,320.00$4,500.00$6,948.78$6,000.00$10,145$5,650.00
92Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126)EACH22$5,500.00$5,380.00$4,100.00$6,730.12$6,000.00$6,284.51$5,840.00
93Inlet (complete)(PSL)(FG)(4FTX4FT-4FTX4FT) (465-7128)EACH10$11,000$5,920.00$5,000.00$7,526.95$7,000.00$8,391.43$6,905.00
94Inlet(complete)(pazd)(FG)(3FTX3FT-3FTX3FT) (465-7158)EACH20$7,300.00$5,760.00$5,200.00$6,814.25$7,000.00$8,655.87$5,745.00
95Inlet(complete)(pazd)(FG)(4FTX4FT-4FTX4FT) (465-7160)EACH14$5,000.00$6,850.00$5,500.00$7,778.98$8,000.00$8,418.45$7,140.00
96Inlet(complete)(pazd)(FG)(5FTX5FT-4FTX4FT) (465-7162)EACH2$25,000$7,320.00$7,000.00$8,893.07$8,600.00$9,845.31$7,645.00
97Inlet (complete)(cob)(10 FT)(FTW) (465-7201)EACH4$25,000$17,220$15,000$8,920.20$8,200.00$15,941$6,945.00
98Inlet (complete)(rwi)(type I) (465-7353)EACH15$7,500.00$7,200.00$8,000.00$4,509.93$8,800.00$9,017.12$4,605.00
99Wingwall (FW - 0) (HW=8 FT) (466-7150)EACH1$25,000$35,780$60,000$21,301$30,000$82,974$17,905
100Wingwall (FW - 0) (HW=14 FT) (466-7156)EACH1$25,000$61,900$75,000$35,286$78,000$80,685$35,065
101Wingwall (PW - 1) (HW=7 FT) (466-7177)EACH2$25,000$18,700$50,000$24,400$62,000$20,790$21,135
102Wingwall (PW - 1) (HW=8 FT) (466-7178)EACH4$30,000$32,300$55,000$43,536$68,000$57,467$43,650
103Wingwall (PW - 1) (HW=9 FT) (466-7179)EACH3$45,000$30,690$53,000$35,684$55,000$40,833$34,435
104Wingwall (PW - 1) (HW=10 FT) (466-7180)EACH2$51,000$38,950$58,000$46,624$75,000$49,709$47,130
105Wingwall (PW - 1) (HW=11 FT) (466-7181)EACH4$60,000$44,540$62,000$51,832$62,000$48,396$53,055
106Wingwall (PW - 1) (HW=12 FT) (466-7182)EACH2$60,000$57,600$75,000$77,816$116,500$64,784$83,750
107Wingwall (PW - 1) (HW=13 FT) (466-7183)EACH1$60,000$69,800$80,000$108,586$172,000$82,682$120,000
108Wingwall (SW - 0) (HW=8 FT) (466-7207)EACH1$35,000$35,790$52,000$25,905$29,000$52,197$23,145
109Wingwall (SW - 0) (HW=11 FT) (466-7209)EACH1$90,000$50,200$57,000$33,994$37,000$56,772$33,600
110Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326)EACH16$1,600.00$1,510.00$2,045.83$1,738.67$3,000.00$4,600.60$3,170.00
111Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH2$1,300.00$1,680.00$2,251.69$3,684.05$2,900.00$4,876.45$3,170.00
112Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346)EACH1$6,250.00$2,380.00$3,119.87$2,583.47$8,600.00$5,210.07$4,210.00
113Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366)EACH1$6,800.00$5,470.00$4,071.34$3,331.85$7,500.00$7,766.08$4,210.00
114Set (type II) (42 in) (RCP) (4: 1) (C) (467-7378)EACH1$5,200.00$5,310.00$2,533.23$6,246.94$13,500$8,720.02$5,075.00
115Set (type II) (42 in) (RCP) (6: 1) (P) (467-7380)EACH6$8,000.00$7,000.00$4,239.95$6,248.48$10,500$10,493$5,805.00
116Set (type II) (48 in) (RCP) (4: 1) (C) (467-7390)EACH1$8,000.00$7,810.00$4,890.08$10,046$10,500$10,023$6,815.00
117Jack bor or tun pipe(36 in)(steel casing) (476-7008)LF102$2,000.00$1,310.00$920.34$1,213.40$715.00$1,770.41$1,485.00
118Jack bor or tun pipe(24 in)(RC)(CL V) (476-7031)LF102$2,000.00$50.75$80.75$50.00$620.00$338.56$50.00
119Jack bor tun box culvert (4 FT X 4 FT) (476-7044)LF200$3,000.00$1,970.00$1,598.82$400.00$500.00$2,200.00$1,865.00
120Adjusting inlets (479-7002)EACH1$5,000.00$6,040.00$510.95$9,000.00$3,500.00$145.00$2,570.00
121Removing structure (inlet) (496-7002)EACH2$2,000.00$1,020.00$641.58$835.74$2,000.00$450.00$1,420.00
122Removing structure (set) (496-7004)EACH116$400.00$511.00$326.94$487.93$950.00$1,000.00$630.00
123Removing structure (wingwall) (496-7005)EACH24$1,000.00$2,310.00$1,192.41$5,699.74$6,000.00$3,500.00$3,705.00
124Removing structure (headwall) (496-7006)EACH16$1,800.00$1,710.00$1,163.17$5,699.74$4,700.00$3,500.00$3,235.00
125Removing structure (pipe) (496-7007)LF3,804$20.00$21.30$18.79$31.88$50.00$20.00$28.50
126Removing structure (box culvert) (496-7008)LF1,591$60.00$60.75$45.10$83.42$150.00$50.00$96.50
127Removing structure (ret wall) (496-7019)LF302$45.00$25.70$13.70$21.89$30.00$45.00$38.20
128Mobilization (500-7001)LS1$9,900,000$8,144,254$9,980,000$12,483,232$12,000,000$12,581,299$12,600,000
129Barricades, signs and traffic handling (502-7001)MO36$25,000$43,290$25,000$90,900$95,000$25,000$63,000
130TMA (stationary) (505-7001)DAY145$200.00$850.00$220.00$300.00$620.00$268.82$399.00
131TMA (mobile operation) (505-7003)DAY26$175.00$850.00$936.56$950.00$1,800.00$1,332.39$1,073.00
132Rock filter dams (install) (type 2) (506-7002)LF2,212$40.00$40.75$39.49$41.67$47.00$42.09$45.50
133Rock filter dams (remove) (506-7011)LF2,212$13.00$8.50$8.21$13.84$3.00$13.98$15.05
134Construction exits (install) (type 1) (506-7020)SY5,994$34.00$31.25$30.16$34.33$25.00$34.68$37.50
135Construction exits (remove) (506-7024)SY5,994$9.50$9.55$9.23$10.71$1.00$10.82$11.75
136Earthwork (erosion & sediment control, in vehicle) (506-7029)CY46$22.00$49.25$48.34$250.00$230.00$74.53$70.50
137Backhoe work (erosion & sediment control) (506-7030)HR22$80.00$66.00$269.66$500.00$280.00$114.25$78.80
138Temporary sediment control fence (install) (506-7039)LF54,496$4.00$3.40$3.28$3.10$1.70$3.13$3.40
139Temporary sediment control fence (remove) (506-7041)LF54,496$0.80$0.85$0.83$0.77$0.10$0.78$0.85
140Biodegradable erosion control logs (install) (12") (506-7044)LF6,220$5.00$4.20$4.04$6.11$4.25$6.17$6.65
141Biodegradable erosion control logs (remove) (506-7046)LF6,220$1.00$0.85$0.83$0.83$0.10$0.84$0.90
142Constructing detours (508-7001)SY92,955$85.00$98.25$100.00$83.18$116.00$77.00$114.00
143Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009)LF26,550$40.00$13.60$44.90$3.98$20.00$50.00$67.00
144Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010)LF1,120$50.00$105.00$45.12$7.97$20.00$63.20$69.00
145Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033)LF32,425$7.00$18.60$6.85$4.98$5.00$6.82$5.30
146Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034)LF2,540$10.00$14.60$6.83$15.69$5.00$6.32$15.20
147Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057)LF26,550$12.00$20.00$5.92$3.79$5.00$16.36$6.67
148Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058)LF1,120$12.00$18.40$6.77$7.79$5.00$29.23$7.00
149Concrete curb (type II) (529-7002)LF5,778$40.00$16.60$18.27$38.74$18.00$32.74$9.00
150Concrete curb (mono) (type I) (529-7006)LF1,161$20.00$4.70$7.34$5.00$2.00$34.68$6.10
151Concrete curb (mono) (type II) (529-7007)LF147,559$4.00$4.65$4.63$2.21$1.50$11.00$5.00
152Driveways (concrete) (530-7006)SY5,513$140.00$83.50$100.00$85.33$85.00$131.00$92.00
153Driveways (concrete) (hes) (530-7007)SY2,582$120.00$104.00$90.89$105.33$95.00$186.70$101.50
154Driveways (ACP) (530-7010)SY1,063$63.00$80.75$85.00$84.43$75.00$71.54$95.00
155Concrete sidewalks (4") (531-7001)SY28,438$50.00$57.75$60.00$47.13$60.00$80.00$77.50
156Curb ramps (type 1) (531-7005)EACH18$3,000.00$2,680.00$1,750.00$2,603.34$3,200.00$6,844.34$3,005.00
157Curb ramps (type 2) (531-7006)EACH15$5,000.00$2,730.00$2,400.00$2,603.34$3,200.00$6,844.34$2,760.00
158Curb ramps (type 7) (531-7010)EACH26$2,500.00$2,730.00$2,100.00$2,603.34$3,400.00$6,905.85$3,110.00
159Curb ramps (type 10) (531-7011)EACH21$3,000.00$2,730.00$2,500.00$2,603.34$3,500.00$7,379.71$3,110.00
160Curb ramps (type 21) (531-7013)EACH4$3,000.00$2,620.00$2,800.00$2,603.34$3,800.00$6,980.16$4,730.00
161Curb ramps (type 22) (531-7014)EACH1$7,000.00$3,930.00$3,200.00$3,703.34$4,000.00$8,179.34$6,345.00
162Concrete sidewalks (special) (531-7025)SY114$500.00$119.00$210.00$1,102.51$200.00$1,430.37$1,450.00
163Concrete median (mono nose) (536-7006)SY165$80.00$221.00$120.00$175.33$100.00$511.27$130.00
164Right of way markers (538-7001)EACH247$250.00$358.00$400.00$395.00$395.00$405.61$415.00
165Metal W-beam guard fence (steel post) (540-7002)LF1,487.50$30.00$30.00$27.27$30.00$30.00$30.24$31.00
166Metal beam guard fence trans (TL2) (540-7006)EACH16$1,100.00$1,200.00$1,202.02$1,200.00$1,200.00$1,731.30$1,775.00
167Downstream anchor terminal section (540-7015)EACH2$1,200.00$1,200.00$1,262.63$1,200.00$1,200.00$1,530.04$1,570.00
168Remove metal beam guard fence (542-7001)LF1,262.50$4.00$2.75$2.02$2.75$2.75$2.57$2.65
169Remove terminal anchor section (542-7002)EACH1$450.00$150.00$202.02$150.00$150.00$256.72$265.00
170Remove downstream anchor terminal (542-7003)EACH2$225.00$150.00$202.02$150.00$150.00$256.72$265.00
171Guardrail end treatment (install) (544-7001)EACH18$3,000.00$3,000.00$3,131.31$3,000.00$3,000.00$3,388.67$3,470.00
172Guardrail end treatment (remove) (544-7003)EACH9$300.00$250.00$202.02$250.00$250.00$256.72$265.00
173Pipe underdrains (type 6) (6") (556-7006)LF4,799$40.00$30.75$31.66$25.58$84.30$43.64$28.00
174Conduit (PVC) (schedule 40) (2") (618-7030)LF180$15.00$19.00$19.18$18.99$15.76$19.38$20.05
175Conduit (PVC) (schedule 40) (3") (618-7036)LF1,435$20.00$20.80$21.05$20.84$16.81$21.27$22.00
176Conduit (PVC) (schedule 40) (4") (618-7040)LF6,016$20.00$22.50$22.73$22.50$17.86$22.96$23.80
177Conduit (PVC) (schedule 40) (4") (bore) (618-7041)LF3,090$55.00$31.00$31.26$30.95$42.03$31.58$32.70
178Conduit (PVC) (schedule 80) (2") (618-7054)LF805$20.00$20.20$20.42$20.22$16.81$20.63$21.35
179Conduit (PVC) (schedule 80) (2") (bore) (618-7055)LF465$80.00$28.70$28.96$28.67$31.52$29.26$30.30
180Electrical conductor (no.12) insulated (620-7004)LF2,240$2.98$2.25$2.28$2.26$1.58$2.31$2.40
181Electrical conductor (no.10) bare (620-7005)LF320$2.23$2.40$2.43$2.41$1.58$2.46$2.55
182Electrical conductor (no.8) insulated (620-7008)LF8,120$2.40$2.95$3.00$2.97$1.99$3.03$3.15
183Electrical conductor (no.6) bare (620-7009)LF6,945$2.70$3.15$3.19$3.16$2.10$3.22$3.35
184Electrical conductor (no.6) insulated (620-7010)LF960$2.10$3.65$3.68$3.64$2.10$3.71$3.85
185Ground box type A (122311) (624-7001)EACH52$1,000.00$993.00$1,002.73$992.70$1,365.99$1,012.96$1,050.00
186Ground box type D (162922) (624-7007)EACH14$1,870.00$1,060.00$1,070.91$1,060.20$1,471.07$1,081.84$1,120.00
187Ground box type D (162922)W/apron (624-7008)EACH30$1,614.00$1,660.00$1,677.96$1,661.18$1,576.14$1,695.08$1,755.00
188Elc SRV type D 120/240 070(NS)SS(E)PS(U) (628-7190)EACH8$10,000$7,890.00$7,974.37$7,894.63$9,982.23$8,055.75$8,340.00
189Aluminum signs (type A) (636-7001)SF409$37.00$38.50$37.32$36.95$36.95$37.70$38.50
190Aluminum signs (type G) (636-7002)SF441$38.00$35.00$42.98$42.55$42.55$43.42$44.25
191Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH203$700.00$590.00$611.11$605.00$605.00$617.35$630.00
192Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH38$850.00$690.00$722.22$715.00$715.00$729.59$745.00
193Install small roadside sign support and assembly type 10BWG(1)SA(T-exal) (644-7006)EACH1$1,500.00$750.00$908.08$899.00$899.00$917.35$935.00
194Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009)EACH13$1,400.00$590.00$641.41$635.00$635.00$647.96$665.00
195Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012)EACH3$1,000.00$690.00$752.53$745.00$745.00$760.20$775.00
196Install small roadside sign support and assembly type 10BWG(2)SA(P) (644-7017)EACH6$1,000.00$990.00$1,338.38$1,325.00$1,325.00$1,352.04$1,380.00
197Install small roadside sign support and assembly type 10BWG(2)SA(P-exal) (644-7018)EACH7$1,300.00$990.00$1,505.05$1,490.00$1,490.00$1,520.41$1,550.00
198Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025)EACH11$700.00$800.00$908.08$899.00$899.00$917.35$935.00
199Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026)EACH7$1,200.00$990.00$934.34$925.00$925.00$943.88$965.00
200Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH4$1,200.00$800.00$1,009.09$999.00$999.00$1,019.39$1,040.00
201Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH6$360.00$990.00$1,207.07$1,195.00$1,195.00$1,219.39$1,245.00
202Install small roadside sign support and assembly TYS80(1)SA(U-exal) (644-7036)EACH2$1,185.00$990.00$1,560.61$1,545.00$1,545.00$1,576.53$1,610.00
203In bridge MNT clearance sign assembly(type N) (644-7061)EACH2$4,200.00$3,100.00$3,025.26$2,995.00$2,995.00$3,056.12$3,115.00
204In bridge MNT clearance sign assembly(type S) (644-7062)EACH2$3,000.00$3,100.00$3,025.26$2,995.00$2,995.00$3,056.12$3,115.00
205Install LRSS (struct steel) (647-7001)LB2,786$8.10$6.85$7.47$7.40$7.40$7.55$7.70
206Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH11$11.00$20.00$15.15$20.00$20.00$15.31$15.60
207Install delineator assembly (D-SW)SZ 1(BRF)GF1 (658-7015)EACH6$6.00$20.00$15.15$20.00$20.00$25.51$26.00
208Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032)EACH5$22.00$20.00$15.15$20.00$20.00$15.31$15.60
209Install delineator assembly (D-SW)SZ 1(WFLX)GNDHH (658-7106)EACH104$210.00$150.00$190.91$189.00$150.00$192.86$197.00
210Inst delineator assembly (D-SY)SZ 1(yflx)SRFHH(BI) (658-7127)EACH30$130.00$160.00$190.91$189.00$160.00$192.86$197.00
211Install delineator assembly (D-DW)SZ 5(WFLX)GNDHH (658-7151)EACH32$130.00$150.00$190.91$189.00$150.00$192.86$197.00
212Install delineator assembly (D-DY)SZ 5(yflx)SRFHH (658-7159)EACH28$130.00$150.00$190.91$189.00$150.00$192.86$197.00
213Work zone pavement marking removing (W)6"(broken) (662-7065)LF2,185$3.00$0.95$0.81$0.80$1.50$0.84$0.90
214Work zone pavement marking removing (W)6"(DOT) (662-7066)LF2,218$3.00$2.60$0.79$0.78$1.50$0.82$0.85
215Work zone pavement marking removing (W)6"(solid) (662-7068)LF254,157$1.00$0.90$0.61$0.60$1.20$0.63$0.65
216Work zone pavement marking removing (W)8"(solid) (662-7072)LF22,049$3.00$2.40$1.01$1.00$1.50$1.05$1.10
217Work zone pavement marking removing (W)24"(solid) (662-7077)LF3,415$7.00$7.75$4.04$4.00$6.25$4.18$4.45
218Work zone pavement marking removing (Y)6"(DOT) (662-7099)LF570$1.30$2.00$1.01$1.00$1.50$1.05$1.10
219Work zone pavement marking removing (Y)6"(solid) (662-7100)LF247,435$1.00$0.90$0.61$0.60$1.20$0.63$0.65
220Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF1,145$3.00$2.05$0.70$0.69$1.20$0.72$0.75
221Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF715$3.00$2.25$1.01$1.00$1.50$1.05$1.10
222Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF22,878$1.50$1.05$0.80$0.79$0.85$0.83$0.85
223Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF3,315$3.50$4.60$2.92$2.89$2.90$3.02$3.20
224Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF5,574$6.50$8.00$6.31$6.25$6.55$6.53$6.90
225Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH122$145.00$200.00$150.51$149.00$182.00$155.70$165.00
226Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045)EACH18$230.00$242.00$191.92$190.00$352.00$198.55$210.00
227Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051)EACH4$450.00$247.00$191.92$190.00$375.00$198.55$210.00
228Reflectorized pavement marking type I(W)(lane drop arrow)(100MIL) (666-7060)EACH12$200.00$339.00$393.94$390.00$500.00$407.55$430.00
229Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH123$180.00$250.00$170.71$169.00$199.00$176.60$185.00
230Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081)EACH27$350.00$1,200.00$277.78$275.00$725.00$287.37$300.00
231Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090)EACH30$60.00$75.00$40.40$40.00$32.00$41.80$44.00
232Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117)LF400$3.50$4.00$3.03$3.00$2.90$3.14$3.35
233Reflectorized pavement marking type II (W) 6" (broken) (666-7172)LF19,388$0.50$0.30$0.29$0.29$0.23$0.30$0.32
234Reflectorized pavement marking type II (W) 6" (DOT) (666-7173)LF1,145$1.00$1.45$0.30$0.30$0.23$0.31$0.33
235Reflectorized pavement marking type II (W) 6" (solid) (666-7175)LF95,062$0.30$0.20$0.17$0.17$0.23$0.18$0.20
236Reflectorized pavement marking type II (W) 8" (DOT) (666-7177)LF715$0.30$1.50$0.51$0.50$0.30$0.52$0.55
237Reflectorized pavement marking type II (W) 8" (solid) (666-7179)LF22,878$0.30$0.45$0.45$0.45$0.30$0.47$0.50
238Reflectorized pavement marking type II (W) 12" (solid) (666-7182)LF3,201$3.00$1.60$0.76$0.75$0.40$0.78$0.85
239Reflectorized pavement marking type II (W) 24" (solid) (666-7184)LF5,574$4.00$2.75$0.76$0.75$0.80$0.78$0.85
240Reflectorized pavement marking type II (W) (arrow) (666-7186)EACH122$100.00$114.00$18.18$18.00$15.00$18.81$19.85
241Reflectorized pavement marking type II (W) (double arrow) (666-7187)EACH18$150.00$116.00$28.28$28.00$20.00$29.26$31.00
242Reflectorized pavement marking type II (W) (uturn arrow) (666-7189)EACH4$150.00$140.00$28.28$28.00$15.00$29.26$31.00
243Reflectorized pavement marking type II (W) (LN reduct arrow) (666-7192)EACH12$130.00$178.00$28.28$28.00$20.00$29.26$31.00
244Reflectorized pavement marking type II (W) (word) (666-7194)EACH123$105.00$138.00$18.18$18.00$15.00$18.81$20.00
245Reflectorized pavement marking type II (W) 36" (yld tri) (666-7201)EACH30$70.00$56.00$10.10$10.00$5.00$10.45$11.05
246Reflectorized pavement marking type II (Y) 6" (broken) (666-7211)LF269$0.15$0.30$0.30$0.30$0.23$0.31$0.35
247Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF101,930$0.15$0.20$0.17$0.17$0.23$0.18$0.20
248Reflectorized pavement marking type II (Y) 12" (solid) (666-7215)LF400$0.50$1.35$0.51$0.50$0.40$0.52$0.55
249Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF19,388$1.00$0.70$0.52$0.51$0.65$0.53$0.55
250Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF95,062$1.00$0.70$0.51$0.50$0.56$0.52$0.55
251Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF269$0.42$0.70$0.52$0.51$0.65$0.53$0.55
252Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF101,930$1.00$0.70$0.51$0.50$0.56$0.52$0.55
253Reflectorized pavement marker type I-C (672-7002)EACH1,201$4.00$5.00$3.93$3.89$3.15$4.07$4.30
254Reflectorized pavement marker type II-A-A (672-7004)EACH1,310$5.00$5.00$3.93$3.89$3.15$4.07$4.30
255Reflectorized pavement marker type II-C-R (672-7006)EACH1,305$5.00$5.00$3.93$3.89$3.15$4.07$4.30
256Eliminating existing PM & markers (6") (677-7002)LF206,674$0.60$0.50$0.60$0.59$0.55$0.62$0.65
257Eliminating existing PM & markers (8") (677-7004)LF8,663$1.00$0.85$0.71$0.70$0.55$0.73$0.77
258Eliminating existing PM & markers (24") (677-7008)LF638$4.00$3.45$2.93$2.90$3.00$3.03$3.20
259Eliminating existing PM & markers (arrow) (677-7009)EACH45$60.00$41.00$49.49$49.00$55.00$51.20$54.05
260Eliminating existing PM & markers (word) (677-7015)EACH32$180.00$48.00$49.50$49.00$55.00$51.21$54.05
261Eliminating existing PM & markers (RR crossing) (677-7019)EACH3$200.00$180.00$90.91$90.00$155.00$94.05$100.00
262Pavement surface preparation for marking (6") (678-7002)LF237,179$0.10$0.15$0.15$0.15$0.05$0.16$0.17
263Pavement surface preparation for marking (8") (678-7004)LF23,593$0.20$0.30$0.20$0.20$0.05$0.21$0.22
264Pavement surface preparation for marking (12") (678-7006)LF3,201$1.00$1.00$0.76$0.75$0.10$0.78$0.85
265Pavement surface preparation for marking (24") (678-7008)LF5,574$1.00$1.50$0.66$0.65$0.20$0.68$0.75
266Pavement surface preparation for marking (arrow) (678-7009)EACH134$13.00$20.00$10.10$10.00$5.00$10.45$11.05
267Pavement surface preparation for marking (double arrow) (678-7010)EACH18$15.00$20.00$18.18$18.00$7.50$18.81$20.00
268Pavement surface preparation for marking (uturn arr) (678-7012)EACH4$40.00$20.00$18.18$18.00$7.50$18.81$20.00
269Pavement surface preparation for marking (word) (678-7016)EACH123$30.00$20.00$10.10$10.00$5.00$10.45$11.05
270Pavement surface preparation for marking (36")(yld tri) (678-7023)EACH30$13.00$5.75$10.10$10.00$2.50$10.45$11.05
271Pavement surface preparation for marking (RPM) (678-7033)EACH3,816$4.00$0.50$0.40$0.40$0.15$0.42$0.45
272Install highway traffic signal (isolated) (680-7002)EACH6$45,000$43,470$43,906$43,467$55,690$44,354$45,900
273Removing traffic signals (680-7004)EACH7$5,000.00$4,190.00$4,232.18$4,189.86$10,508$4,275.37$4,425.00
274Ins HY traffic signal (DPT sup CNT & cab)(iso) (680-7005)EACH2$20,000$18,110$18,292$18,109$35,726$18,479$19,125
275Temporary traffic signals (681-7001)EACH7$15,000$117,900$119,043$117,852$152,360$120,258$124,435
276Vehicle signal section (12")LED(green) (682-7001)EACH82$350.00$433.00$437.71$433.33$451.83$442.17$460.00
277Vehicle signal section (12")LED(green arrow) (682-7002)EACH39$350.00$451.00$455.46$450.91$451.83$460.11$480.00
278Vehicle signal section (12")LED(yel) (682-7003)EACH86$350.00$437.00$441.80$437.38$451.83$446.31$465.00
279Vehicle signal section (12")LED(yel arrow) (682-7004)EACH43$340.00$443.00$447.27$442.80$451.83$451.84$470.00
280Vehicle signal section (12")LED(red) (682-7005)EACH86$330.00$433.00$437.71$433.33$451.83$442.17$460.00
281Vehicle signal section (12")LED(red arrow) (682-7006)EACH36$328.00$443.00$447.25$442.78$451.83$451.82$470.00
282Pedestrian signal section (LED)(countdown) (682-7018)EACH46$750.00$895.00$903.60$894.56$998.22$912.82$945.00
283Backplate W/ref border(3 sec)(vent)aluminum (682-7042)EACH75$280.00$205.00$206.81$204.74$231.17$208.92$216.50
284Backplate W/ref border(4 sec)(vent)aluminum (682-7043)EACH8$300.00$321.00$324.08$320.84$336.24$327.39$340.00
285Backplate W/ref border(5 sec)(vent)aluminum (682-7044)EACH23$300.00$330.00$333.63$330.29$336.24$337.03$350.00
286Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031)LF4,471$3.00$2.95$2.98$2.95$2.63$3.01$3.15
287Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033)LF1,911$3.50$3.15$3.18$3.15$3.15$3.21$3.35
288Traffic signal CBL (type A)(14 AWG)(9 conductor) (684-7035)LF1,640$5.00$3.40$3.45$3.42$3.15$3.49$3.65
289Traffic signal CBL (type A)(14 AWG)(10 conductor) (684-7036)LF2,850$5.00$3.65$3.67$3.63$4.20$3.70$3.85
290Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046)LF5,055$8.00$7.40$7.48$7.41$9.77$7.56$7.85
291Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079)LF7,940$2.10$2.20$2.23$2.21$2.10$2.26$2.35
292Ins traffic signal PL AM(S)1 arm(24')lum (686-7027)EACH2$22,000$12,460$12,584$12,458$12,294$12,712$13,160
293Ins traffic signal PL AM (S)1 arm(28') (686-7029)EACH1$12,000$10,050$10,147$10,046$11,033$10,251$10,610
294Ins traffic signal PL AM(S)1 arm(28')lum (686-7031)EACH2$16,000$13,080$13,211$13,079$13,135$13,346$13,810
295Ins traffic signal PL AM(S)1 arm(36')lum (686-7039)EACH3$15,000$15,840$15,996$15,836$15,446$16,159$16,720
296Ins traffic signal PL AM(S)1 arm(40') (686-7041)EACH1$18,000$13,490$13,626$13,489$13,660$13,765$14,250
297Ins traffic signal PL AM(S)1 arm(40')lum (686-7043)EACH5$18,000$17,220$17,396$17,222$16,497$17,574$18,185
298Ins traffic signal PL AM(S)1 arm(44')lum (686-7047)EACH5$16,000$18,030$18,213$18,031$17,548$18,399$19,040
299Ins traffic signal PL AM(S)1 arm(48')lum (686-7051)EACH1$17,000$19,270$19,465$19,270$18,598$19,663$20,350
300Ins traffic signal PL AM(S)1 arm(50')lum (686-7055)EACH5$39,000$33,210$33,548$33,213$31,208$33,891$35,070
301Ins traffic signal PL AM(S)1 arm(55') (686-7057)EACH1$31,000$29,880$30,177$29,876$28,371$30,485$31,545
302Ins traffic signal PL AM(S)1 arm(55')lum (686-7059)EACH1$40,000$34,620$34,965$34,616$32,258$35,322$36,550
303Ins traffic signal PL AM(S)1 arm(60')lum (686-7063)EACH1$42,000$35,830$36,191$35,829$33,624$36,560$37,830
304Ins traffic signal PL AM(S)1 arm(65')lum (686-7067)EACH1$40,000$36,940$37,309$36,936$34,360$37,690$39,000
305Ins traffic signal PL AM(S)2 arm(55-32')lum (686-7211)EACH1$70,000$40,990$41,404$40,990$39,929$41,827$43,280
306Ins traffic signal PL AM(S)2 arm(60-32')lum (686-7239)EACH1$70,000$43,320$43,754$43,316$42,556$44,200$45,735
307Pedestrian pole assembly (687-7001)EACH22$2,500.00$3,330.00$3,365.38$3,331.73$3,005.18$3,399.72$3,520.00
308Pedestrian detect push button (APS) (688-7001)EACH28$1,300.00$1,010.00$1,024.06$1,013.82$1,260.91$1,034.51$1,070.50
309Pedestrian detector controller unit (688-7003)EACH9$4,000.00$3,840.00$3,878.62$3,839.83$4,518.27$3,918.19$4,055.00
310Install of pedestrian push buttons (690-7032)EACH18$600.00$262.00$264.52$261.87$525.38$267.21$280.00
311Full - width mowing (730-7019)CYC12$6,500.00$10,000$21,123$5,000.00$5,000.00$23,129$4,720.00
312VIVDS prosr sys (6006-7001)EACH5$14,000$4,510.00$4,555.77$4,510.21$4,097.97$4,602.26$4,765.00
313VIVDS cam assy FXD LNS (6006-7002)EACH5$4,000.00$5,970.00$6,033.16$5,972.83$6,619.79$6,094.72$6,310.00
314VIVDS CNTRL software (6006-7005)EACH5$500.00$580.00$585.43$579.58$2,206.60$591.41$615.00
315VIVDS cabling (6006-7007)LF1,540$4.00$3.80$3.86$3.82$3.68$3.90$4.05
316VIVDS prosr sys (install only) (6006-7009)EACH4$850.00$524.00$529.03$523.74$525.38$534.43$555.00
317VIVDS cam assy (install only) (6006-7010)EACH4$860.00$262.00$264.51$261.86$840.61$267.21$280.00
318VIVDS cabling (install only) (6006-7012)LF760$4.00$1.75$1.77$1.75$4.20$1.79$1.85
319Bbu system (external battery cabinet) (6007-7001)EACH6$10,000$10,160$10,262$10,160$9,456.85$10,367$10,730
320RVDS (presence detection only) (6008-7001)EACH11$10,000$20,360$20,570$20,364$11,558$20,780$21,505
321RVDS (presence and advance detection) (6008-7003)EACH12$10,000$13,360$13,499$13,364$16,339$13,636$14,110
322Steel split casing (7072-7001)LF105$385.00$1,800.00$3,228.22$1,332.88$2,000.00$300.00$1,320.00
323Demolition (butterfly valve assembly) (7075-7001)EACH1$11,000$3,300.00$4,452.71$34,190$4,500.00$8,000.00$33,800
3246 LF concrete riser (RCP) (7075-7002)EACH1$5,500.00$1,350.00$222.64$9,888.80$8,500.00$850.00$9,780.00
325Bollards (butterfly valve assembly) (7075-7003)EACH4$1,100.00$600.00$667.91$4,050.20$1,850.00$1,500.00$4,005.00
326Valve stem modifications (7075-7004)EACH1$22,000$7,200.00$13,358$14,833$5,750.00$4,000.00$14,665
327Fabricated metal manhole lid (7075-7005)EACH1$2,200.00$10,500$18,924$11,572$10,000$3,000.00$11,440
328Demolition (blow-off assembly) (7075-7006)EACH1$22,000$2,700.00$4,452.71$9,888.80$4,500.00$3,500.00$9,780.00
32918" ductile iron 45 degree fitting (7075-7007)EACH1$11,000$3,150.00$5,009.30$17,463$15,000$12,000$17,265
33018" ductile iron pipe (7075-7008)LF5$1,100.00$3,000.00$8,348.83$2,577.40$1,500.00$500.00$2,550.00
331Concrete slab (7075-7009)CY2$22.00$500.00$1,250.26$641.72$1,250.00$500.00$635.00
332Bollards (blow-off assembly) (7075-7010)EACH5$1,100.00$600.00$934.56$3,997.60$1,850.00$1,500.00$3,955.00
333Gate valve pad (7075-7011)EACH1$11,000$750.00$1,336.85$736.40$500.00$2,500.00$730.00
334Rip rap (7075-7012)SY9$27.50$750.00$438.09$166.59$350.00$220.00$466.50
TxDOT contract A00014162: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of May 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way