TxDOT contract A00121173 bid tabulation
New Arterial, SL 195 (NEW LOCATION, FM 3167 to FM 755). Let by Texas DOT on September 5, 2025, Starr, Pharr District. 6 bids received; low bid $62,281,400 by Posillico Civil, Inc., -17% against the engineer's estimate of $75,006,465.
- Owner
- Texas DOT
- Letting
- 05 SEP 2025
- Pay items
- 181
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Posillico Civil, Inc. | $62,281,400 | Low | -17% |
| 2 | Pulice Construction, Inc. | $62,715,991 | +1.0% | -16% |
| 3 | Ioc Company LLC | $63,186,649 | +1.0% | -16% |
| 4 | Foremost Paving, Inc. | $65,588,742 | +5.0% | -13% |
| 5 | Webber, LLC | $69,752,062 | +12% | -7.0% |
| 6 | Granite Construction Company | $70,234,204 | +13% | -6.0% |
Engineer's estimate: $75,006,465.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Posillico Civil, Inc. | 2. Pulice Construction, Inc. | 3. Ioc Company LLC | 4. Foremost Paving, Inc. | 5. Webber, LLC | 6. Granite Construction Company |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 249.50 | $15,000 | $11,500 | $25,137 | $26,550 | $19,750 | $27,219 | $28,000 |
| 2 | Removing stab base and asphalt pavement(0"-16") (105-7129) | SY | 4,118 | $8.00 | $2.00 | $10.87 | $1.00 | $9.00 | $9.20 | $4.00 |
| 3 | Removing stab base & asphalt pavement(12"-27") (105-7130) | SY | 3,942 | $12.00 | $2.00 | $17.32 | $1.00 | $10.70 | $12.69 | $5.00 |
| 4 | Excavation (roadway) (110-7001) | CY | 443,716 | $5.00 | $6.00 | $2.28 | $0.10 | $5.00 | $3.47 | $4.70 |
| 5 | Embankment (final)(DC)(type C) (132-7006) | CY | 500,014 | $13.00 | $5.00 | $3.58 | $12.00 | $6.13 | $5.16 | $5.40 |
| 6 | Backfill (type A) (134-7001) | STA | 482.90 | $400.00 | $300.00 | $281.42 | $250.00 | $238.50 | $169.16 | $77.89 |
| 7 | Furn & place topsoil (vehicle) (160-7007) | CY | 50 | $32.00 | $250.00 | $46.98 | $20.00 | $34.30 | $42.34 | $40.00 |
| 8 | Drill seed (permanent_rural_clay) (164-7042) | ACRE | 75.45 | $1,000.00 | $588.00 | $621.07 | $1,995.00 | $591.90 | $1,100.00 | $849.81 |
| 9 | Drill seed (temporary_warm) (164-7045) | ACRE | 75.45 | $1,000.00 | $543.00 | $573.46 | $1,050.00 | $546.50 | $950.00 | $785.18 |
| 10 | Drill seed (temporary_cool) (164-7046) | ACRE | 75.45 | $770.00 | $566.00 | $597.25 | $1,050.00 | $569.20 | $950.00 | $817.76 |
| 11 | Vegetative watering (168-7001) | TGL | 6,679 | $13.00 | $15.00 | $24.59 | $30.00 | $55.10 | $27.00 | $8.00 |
| 12 | Soil ret BLKT(SL_mod_clay_long_spry) (169-7018) | SY | 8,734 | $2.25 | $1.30 | $1.39 | $1.48 | $1.40 | $2.00 | $1.91 |
| 13 | Sprinkling (dust control) (204-7001) | TGL | 926 | $20.00 | $64.00 | $102.30 | $1.00 | $1.00 | $27.00 | $25.00 |
| 14 | FL BS (roadway del)(type E GR 4)(final pos) (247-7277) | CY | 67,891.30 | $30.00 | $32.00 | $17.38 | $21.00 | $33.70 | $41.00 | $45.00 |
| 15 | Lime (com or QK)(slurry) (260-7005) | TON | 6,323.80 | $250.00 | $330.00 | $347.04 | $268.00 | $268.30 | $254.00 | $300.00 |
| 16 | Lime TRT (existing material)(12") (260-7009) | SY | 212,921.90 | $3.00 | $3.00 | $1.61 | $3.00 | $3.50 | $4.26 | $4.40 |
| 17 | Cement (275-7001) | TON | 2,291.30 | $200.00 | $220.00 | $208.04 | $210.00 | $202.20 | $222.53 | $250.00 |
| 18 | Cement TRT (new base)(12") (275-7013) | SY | 203,673.80 | $2.50 | $1.51 | $2.07 | $3.00 | $2.40 | $1.00 | $3.00 |
| 19 | Prime coat (MC-30) (310-7004) | GAL | 38,891.40 | $5.00 | $6.00 | $4.30 | $4.00 | $4.70 | $6.53 | $5.69 |
| 20 | SP mixes SP-D sac-B PG76-22 (344-7065) | TON | 33,253.10 | $150.00 | $130.00 | $142.42 | $110.00 | $111.20 | $141.66 | $128.00 |
| 21 | Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009) | TON | 16,905.70 | $150.00 | $160.00 | $160.74 | $135.00 | $124.50 | $146.58 | $158.00 |
| 22 | Plane & text asphalt concrete pavement(1.5") (354-7018) | SY | 2,116.50 | $12.00 | $1.00 | $1.71 | $1.00 | $19.80 | $2.68 | $2.61 |
| 23 | Struct excavation (special) (400-7005) | CY | 3,483 | $75.00 | $4.00 | $14.57 | $75.00 | $60.30 | $9.73 | $68.05 |
| 24 | Cem stabil BKFL (400-7010) | CY | 2,491.60 | $150.00 | $52.00 | $137.55 | $75.00 | $100.50 | $133.87 | $99.34 |
| 25 | Trench excavation protection (402-7001) | LF | 125 | $2.00 | $250.00 | $615.13 | $0.10 | $10.10 | $15.02 | $64.58 |
| 26 | Soil nail anchors (410-7001) | LF | 19,351 | $28.00 | $45.00 | $34.24 | $1.00 | $62.40 | $27.55 | $35.00 |
| 27 | Drilled shaft (18 in) (416-7002) | LF | 624 | $225.00 | $72.00 | $223.15 | $79.30 | $100.50 | $229.16 | $220.00 |
| 28 | Drilled shaft (36 in) (416-7006) | LF | 7,592 | $330.00 | $255.00 | $223.67 | $229.20 | $251.30 | $340.70 | $350.00 |
| 29 | Drilled shaft (42 in) (416-7007) | LF | 468 | $520.00 | $340.00 | $239.15 | $327.50 | $351.80 | $448.74 | $400.00 |
| 30 | Drilled shaft (traffic signal pole) (24 in) (416-7042) | LF | 48 | $200.00 | $127.00 | $240.44 | $126.51 | $115.60 | $120.00 | $200.00 |
| 31 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 92 | $430.00 | $325.00 | $475.56 | $324.53 | $296.50 | $680.00 | $700.00 |
| 32 | Drilled shaft (traffic signal pole) (42 in) (416-7045) | LF | 36 | $475.00 | $470.00 | $555.30 | $468.65 | $428.20 | $810.00 | $900.00 |
| 33 | Class C concrete (abutment) (420-7012) | CY | 410 | $1,300.00 | $850.00 | $1,320.20 | $1,140.00 | $1,809.00 | $1,323.42 | $1,500.00 |
| 34 | Class C concrete (cap) (420-7022) | CY | 1,044.80 | $1,800.00 | $1,400.00 | $1,236.87 | $1,050.00 | $2,010.00 | $1,287.28 | $1,600.00 |
| 35 | Class C concrete (column) (420-7038) | CY | 894.50 | $2,000.00 | $1,000.00 | $1,359.82 | $1,265.00 | $1,507.50 | $1,091.34 | $1,200.00 |
| 36 | Reinforced concrete slab (422-7001) | SF | 283,602 | $28.00 | $23.50 | $19.47 | $21.00 | $28.20 | $22.68 | $25.00 |
| 37 | Retaining wall (soil nail) (fascia) (423-7023) | SF | 13,380 | $50.00 | $49.00 | $81.36 | $1.00 | $71.40 | $69.47 | $70.00 |
| 38 | Prestressed concrete girder (TX54) (425-7005) | LF | 35,290.76 | $290.00 | $200.00 | $193.70 | $218.35 | $216.10 | $190.82 | $210.00 |
| 39 | Riprap (concrete)(4 in) (432-7001) | CY | 5,216 | $475.00 | $500.00 | $441.88 | $421.67 | $421.10 | $429.35 | $400.00 |
| 40 | Riprap (concrete)(5 in) (432-7002) | CY | 796 | $0.10 | $438.00 | $458.75 | $437.78 | $437.20 | $417.19 | $600.00 |
| 41 | Riprap (concrete)(flume) (432-7012) | CY | 60 | $800.00 | $759.00 | $458.75 | $10.00 | $437.20 | $621.75 | $600.00 |
| 42 | Riprap (mow strip)(4 in) (432-7013) | CY | 434 | $500.00 | $438.00 | $458.75 | $437.78 | $437.20 | $497.76 | $750.00 |
| 43 | Riprap (stone protection)(18 in) (432-7043) | CY | 536 | $240.00 | $197.00 | $178.23 | $130.00 | $221.10 | $354.12 | $180.00 |
| 44 | Riprap (concrete)(CL B)(RR8&RR9) (432-7055) | CY | 193 | $640.00 | $454.00 | $458.75 | $437.78 | $437.20 | $467.72 | $480.46 |
| 45 | Rail (type SSTR) (450-7024) | LF | 14,612.20 | $80.00 | $55.00 | $62.26 | $60.00 | $65.40 | $56.76 | $71.09 |
| 46 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 1,142 | $200.00 | $250.00 | $235.22 | $180.00 | $261.30 | $248.74 | $300.00 |
| 47 | Concrete box culvert (5 FT X 3 FT) (462-7007) | LF | 468 | $600.00 | $500.00 | $593.60 | $622.83 | $673.40 | $549.05 | $450.00 |
| 48 | Concrete box culvert (5 FT X 4 FT) (462-7008) | LF | 1,800 | $600.00 | $600.00 | $612.53 | $683.87 | $565.90 | $560.48 | $500.00 |
| 49 | Concrete box culvert (5 FT X 5 FT) (462-7009) | LF | 696 | $795.00 | $556.00 | $663.08 | $732.83 | $658.30 | $627.34 | $525.00 |
| 50 | Concrete box culvert (6 FT X 3 FT) (462-7011) | LF | 328 | $700.00 | $605.00 | $714.65 | $752.33 | $773.90 | $665.38 | $550.00 |
| 51 | Concrete box culvert (6 FT X 4 FT) (462-7012) | LF | 1,490 | $775.00 | $700.00 | $743.48 | $847.52 | $693.50 | $697.23 | $600.00 |
| 52 | Concrete box culvert (8 FT X 4 FT) (462-7021) | LF | 352 | $1,220.00 | $879.00 | $995.37 | $1,100.82 | $854.30 | $922.15 | $725.00 |
| 53 | Concrete box culvert (10 FT X 4 FT) (462-7032) | LF | 688 | $1,600.00 | $1,300.00 | $1,430.08 | $1,535.74 | $869.40 | $1,352.09 | $1,000.00 |
| 54 | RC pipe (CL III)(18 in) (464-7003) | LF | 1,708 | $93.00 | $75.00 | $168.57 | $86.27 | $100.50 | $130.23 | $72.00 |
| 55 | RC pipe (CL III)(24 in) (464-7005) | LF | 272 | $130.00 | $130.00 | $161.92 | $114.69 | $105.60 | $118.67 | $83.00 |
| 56 | RC pipe (CL III)(48 in) (464-7011) | LF | 160 | $400.00 | $358.00 | $339.77 | $337.99 | $296.50 | $316.74 | $300.00 |
| 57 | RC pipe (CL IV)(24 in) (464-7021) | LF | 152 | $200.00 | $153.00 | $183.92 | $131.95 | $150.80 | $184.31 | $95.00 |
| 58 | Manh (complete)(PRM)(48IN) (465-7002) | EACH | 2 | $8,000.00 | $2,762.00 | $6,250.66 | $4,080.29 | $6,231.00 | $6,584.20 | $1,500.00 |
| 59 | Inlet (complete)(pco)(3FT)(left) (465-7014) | EACH | 1 | $7,000.00 | $5,138.00 | $7,367.50 | $5,257.69 | $804.00 | $9,953.98 | $22,000 |
| 60 | Inlet (complete)(pco)(3FT)(both) (465-7016) | EACH | 2 | $9,000.00 | $4,790.00 | $7,877.67 | $5,694.14 | $8,241.00 | $9,699.69 | $25,000 |
| 61 | Wingwall (PW - 1) (HW=5 FT) (466-7175) | EACH | 1 | $20,000 | $50,000 | $16,147 | $18,473 | $44,220 | $20,756 | $40,000 |
| 62 | Wingwall (PW - 1) (HW=7 FT) (466-7177) | EACH | 4 | $40,000 | $50,000 | $26,604 | $22,025 | $68,340 | $25,662 | $60,000 |
| 63 | Wingwall (PW - 1) (HW=9 FT) (466-7179) | EACH | 1 | $55,000 | $50,000 | $54,871 | $29,333 | $83,415 | $30,343 | $75,000 |
| 64 | Wingwall (PW - 1) (HW=10 FT) (466-7180) | EACH | 2 | $70,000 | $60,000 | $53,833 | $49,329 | $115,575 | $36,368 | $150,000 |
| 65 | Set (type I)(S= 5 FT)(HW= 4 FT)(4:1)(C) (467-7100) | EACH | 12 | $12,500 | $10,000 | $8,496.69 | $10,860 | $10,050 | $11,606 | $8,500.00 |
| 66 | Set (type I)(S= 5 FT)(HW= 5 FT)(4:1)(C) (467-7104) | EACH | 12 | $13,000 | $10,000 | $9,440.08 | $11,875 | $14,070 | $13,704 | $13,500 |
| 67 | Set (type I)(S= 6 FT)(HW= 4 FT)(6:1)(C) (467-7130) | EACH | 8 | $2,600.00 | $5,000.00 | $9,363.79 | $12,789 | $26,130 | $15,670 | $16,500 |
| 68 | Set (type I)(S= 6 FT)(HW= 5 FT)(4:1)(C) (467-7133) | EACH | 6 | $13,000 | $22,500 | $9,721.94 | $11,672 | $23,115 | $18,281 | $13,500 |
| 69 | Set (type I)(S= 6 FT)(HW= 5 FT)(6:1)(C) (467-7134) | EACH | 10 | $15,000 | $3,000.00 | $11,046 | $13,093 | $40,200 | $19,860 | $19,500 |
| 70 | Set (type I)(S= 8 FT)(HW= 5 FT)(6:1)(C) (467-7185) | EACH | 8 | $20,000 | $30,000 | $12,886 | $15,631 | $27,135 | $23,634 | $25,000 |
| 71 | Set (type I)(S= 10 FT)(HW= 5 FT)(6:1)(C) (467-7228) | EACH | 16 | $22,000 | $30,000 | $13,239 | $17,255 | $20,100 | $27,873 | $24,000 |
| 72 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 42 | $1,200.00 | $2,000.00 | $2,300.56 | $1,207.85 | $1,407.00 | $3,361.43 | $4,000.00 |
| 73 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 1 | $2,200.00 | $2,000.00 | $2,551.23 | $1,390.55 | $1,507.50 | $3,197.40 | $3,500.00 |
| 74 | Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327) | EACH | 2 | $1,900.00 | $2,000.00 | $2,549.64 | $1,664.60 | $2,010.00 | $4,108.58 | $4,800.00 |
| 75 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 8 | $1,500.00 | $2,000.00 | $2,565.25 | $1,664.60 | $2,010.00 | $4,557.77 | $4,800.00 |
| 76 | Set (type II) (48 in) (RCP) (6: 1) (P) (467-7392) | EACH | 4 | $13,500 | $10,000 | $8,338.62 | $6,567.03 | $16,080 | $18,888 | $25,000 |
| 77 | Removing structure (set) (496-7004) | EACH | 1 | $500.00 | $500.00 | $717.48 | $1,609.44 | $502.50 | $880.11 | $700.00 |
| 78 | Mobilization (500-7001) | LS | 1 | $7,000,000 | $5,661,945 | $6,267,965 | $6,500,000 | $4,000,000 | $6,945,858 | $7,000,000 |
| 79 | Barricades, signs and traffic handling (502-7001) | MO | 32 | $5,000.00 | $5,330.00 | $6,213.45 | $1,500.00 | $5,000.00 | $75,313 | $4,500.00 |
| 80 | Portable changeable message sign (503-7002) | EACH | 2 | $11,000 | $20,000 | $21,769 | $5,000.00 | $8,547.20 | $20,673 | $12,904 |
| 81 | TMA (stationary) (505-7001) | DAY | 947 | $200.00 | $75.00 | $201.02 | $1.00 | $22.90 | $150.00 | $50.00 |
| 82 | TMA (mobile operation) (505-7003) | DAY | 662 | $200.00 | $150.00 | $556.81 | $10.00 | $0.01 | $480.00 | $55.00 |
| 83 | Rock filter dams (install) (type 2) (506-7002) | LF | 3,894 | $45.00 | $60.00 | $50.62 | $42.00 | $59.00 | $48.00 | $45.88 |
| 84 | Rock filter dams (remove) (506-7011) | LF | 3,894 | $15.00 | $16.00 | $14.76 | $16.50 | $16.60 | $14.00 | $22.68 |
| 85 | Construction exits (install) (type 2) (506-7021) | SY | 936 | $20.00 | $174.00 | $40.07 | $25.00 | $31.40 | $38.00 | $38.00 |
| 86 | Construction exits (remove) (506-7024) | SY | 936 | $6.00 | $48.00 | $13.71 | $10.00 | $13.80 | $13.00 | $12.29 |
| 87 | Construction perimeter fence (506-7034) | LF | 43,876 | $3.50 | $6.00 | $5.27 | $5.00 | $4.60 | $5.00 | $1.41 |
| 88 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 1,765 | $5.00 | $10.00 | $6.33 | $5.85 | $10.40 | $6.00 | $6.44 |
| 89 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,765 | $1.25 | $1.00 | $2.11 | $1.65 | $1.10 | $2.00 | $1.80 |
| 90 | Constructing detours (508-7001) | SY | 2,309 | $60.00 | $45.00 | $98.28 | $80.00 | $86.80 | $55.55 | $100.00 |
| 91 | PCTB (fur&inst)(F-shape or SNGL SLP)type 1 (512-7089) | LF | 1,650 | $40.00 | $120.00 | $9.45 | $25.00 | $26.60 | $46.60 | $40.00 |
| 92 | PCTB (move)(F-shape or SNGL SLP)type 1 (512-7090) | LF | 1,470 | $7.00 | $3.50 | $7.47 | $5.00 | $8.70 | $9.70 | $10.00 |
| 93 | PCTB (remove)(F-shape or SNGL SLP)type 1 (512-7092) | LF | 1,650 | $7.00 | $9.00 | $8.26 | $5.00 | $10.90 | $28.62 | $13.00 |
| 94 | Concrete curb & gutter (type II) (529-7009) | LF | 1,546 | $30.00 | $15.00 | $15.29 | $18.74 | $14.60 | $35.21 | $31.25 |
| 95 | Concrete curb (ribbon) (529-7028) | LF | 466 | $50.00 | $30.00 | $26.36 | $185.00 | $25.20 | $42.65 | $23.45 |
| 96 | Driveways (ACP) (530-7010) | SY | 4,618 | $45.00 | $110.00 | $58.11 | $65.00 | $70.40 | $60.44 | $34.72 |
| 97 | Curb ramps (type 5) (531-7008) | EACH | 4 | $2,800.00 | $3,000.00 | $2,794.69 | $3,300.00 | $2,663.30 | $4,216.82 | $3,420.33 |
| 98 | Curb ramps (type 20) (531-7012) | EACH | 8 | $2,700.00 | $3,000.00 | $2,794.69 | $3,350.00 | $2,663.30 | $3,215.20 | $3,316.98 |
| 99 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 77,183 | $0.25 | $0.10 | $0.14 | $0.13 | $0.40 | $0.20 | $0.19 |
| 100 | Metal W-beam guard fence (timber post) (540-7001) | LF | 5,350 | $29.00 | $28.00 | $32.66 | $28.31 | $28.50 | $28.31 | $28.44 |
| 101 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 24 | $2,600.00 | $2,000.00 | $2,378.73 | $1,973.00 | $1,982.90 | $1,973.00 | $2,071.63 |
| 102 | Downstream anchor terminal section (540-7015) | EACH | 19 | $1,700.00 | $1,700.00 | $1,350.88 | $1,606.00 | $1,614.10 | $1,606.00 | $1,176.48 |
| 103 | Guardrail end treatment (install) (544-7001) | EACH | 19 | $3,500.00 | $3,500.00 | $3,841.21 | $3,479.00 | $3,496.40 | $3,479.00 | $3,345.30 |
| 104 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 6 | $2,000.00 | $1,500.00 | $3,524.04 | $1,325.00 | $1,331.70 | $1,325.00 | $1,338.38 |
| 105 | Crash cushion attenuator (remove) (545-7004) | EACH | 2 | $1,250.00 | $1,500.00 | $1,556.45 | $1,325.00 | $1,331.70 | $1,325.00 | $1,338.39 |
| 106 | Crash cushion attenuator (install)(R)(N)(TL3) (545-7010) | EACH | 2 | $35,000 | $3,000.00 | $33,343 | $27,250 | $27,386 | $27,250 | $27,525 |
| 107 | Chain link fence (install) (6') (550-7001) | LF | 801 | $40.00 | $90.00 | $46.98 | $32.85 | $42.00 | $48.57 | $40.40 |
| 108 | Chain link fence (install) (8') (550-7005) | LF | 4,715 | $60.00 | $75.00 | $49.33 | $42.85 | $50.90 | $58.89 | $42.42 |
| 109 | Gate (install)(6'X10') (550-7014) | EACH | 4 | $1,700.00 | $3,000.00 | $2,466.83 | $2,205.00 | $2,512.50 | $2,907.74 | $2,121.21 |
| 110 | Pipe underdrains (type 8) (6") (556-7008) | LF | 801 | $45.00 | $27.00 | $48.18 | $1.00 | $44.30 | $29.28 | $20.00 |
| 111 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 2,100 | $16.00 | $9.00 | $18.73 | $9.30 | $8.50 | $28.20 | $28.48 |
| 112 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 3,265 | $22.00 | $17.00 | $23.87 | $16.50 | $15.10 | $43.85 | $44.29 |
| 113 | Electrical conductor (no.6) bare (620-7009) | LF | 4,845 | $2.50 | $2.00 | $2.45 | $1.32 | $1.30 | $2.00 | $2.02 |
| 114 | Electrical conductor (no.6) insulated (620-7010) | LF | 1,550 | $2.50 | $2.00 | $2.79 | $1.54 | $1.50 | $2.50 | $2.53 |
| 115 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 3,260 | $3.00 | $2.00 | $3.26 | $1.98 | $1.90 | $3.80 | $3.84 |
| 116 | Ground box type D (162922)W/apron (624-7008) | EACH | 16 | $1,600.00 | $1,320.00 | $1,787.38 | $1,320.14 | $1,206.00 | $1,227.00 | $1,239.39 |
| 117 | Elc SRV type T 120/240 000(NS)GS(L)TS(O) (628-7322) | EACH | 2 | $2,500.00 | $3,157.00 | $3,847.43 | $3,157.34 | $2,884.40 | $3,883.00 | $3,922.22 |
| 118 | Aluminum signs (type A) (636-7001) | SF | 152.25 | $35.00 | $30.00 | $31.64 | $44.35 | $25.20 | $30.00 | $30.30 |
| 119 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 12 | $850.00 | $725.00 | $764.58 | $900.00 | $904.50 | $725.00 | $732.32 |
| 120 | Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025) | EACH | 62 | $900.00 | $750.00 | $790.95 | $850.00 | $854.30 | $750.00 | $757.58 |
| 121 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 35 | $950.00 | $825.00 | $870.04 | $950.00 | $954.80 | $825.00 | $833.33 |
| 122 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 33 | $1,250.00 | $875.00 | $922.77 | $1,025.00 | $1,030.20 | $875.00 | $883.84 |
| 123 | Install small roadside sign support and assembly TYS80(2)SA(P) (644-7048) | EACH | 4 | $1,800.00 | $1,250.00 | $1,318.25 | $1,675.00 | $1,683.40 | $1,250.00 | $1,262.63 |
| 124 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BR) (658-7014) | EACH | 96 | $30.00 | $25.00 | $26.36 | $15.00 | $15.10 | $13.00 | $25.25 |
| 125 | Install delineator assembly (D-SY)SZ 1(yflx)GND(BR) (658-7024) | EACH | 22 | $65.00 | $55.00 | $58.00 | $65.00 | $65.40 | $84.88 | $55.56 |
| 126 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (BR) (658-7033) | EACH | 96 | $50.00 | $25.00 | $26.36 | $15.00 | $15.10 | $11.00 | $25.25 |
| 127 | Install delineator assembly (D-DW)SZ 1(WFLX)GND(BI) (658-7046) | EACH | 23 | $200.00 | $55.00 | $58.00 | $65.00 | $65.40 | $86.02 | $55.56 |
| 128 | Install object marker assembly (OM-2Y)(WC)GND (658-7056) | EACH | 74 | $80.00 | $60.00 | $63.28 | $75.00 | $75.40 | $75.00 | $60.61 |
| 129 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 5,042 | $0.35 | $0.50 | $0.55 | $0.52 | $0.60 | $0.52 | $0.53 |
| 130 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 6,018 | $0.35 | $0.50 | $0.55 | $0.52 | $0.60 | $0.52 | $0.53 |
| 131 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 2,908 | $1.10 | $1.00 | $0.82 | $0.78 | $0.80 | $0.78 | $0.79 |
| 132 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 2,908 | $1.10 | $1.00 | $0.82 | $0.78 | $0.80 | $0.78 | $0.79 |
| 133 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 168 | $1.00 | $2.00 | $4.20 | $3.00 | $1.30 | $1.57 | $5.00 |
| 134 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 228 | $1.00 | $2.00 | $4.21 | $3.00 | $1.30 | $1.91 | $5.00 |
| 135 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 10,094 | $1.00 | $1.00 | $0.93 | $0.88 | $0.90 | $0.88 | $0.89 |
| 136 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 620 | $3.50 | $2.00 | $2.11 | $2.00 | $2.10 | $2.00 | $2.02 |
| 137 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 709 | $8.00 | $9.00 | $9.49 | $9.00 | $9.10 | $9.00 | $9.09 |
| 138 | RE PV marking type I(black)6"(shadow)(100MIL) (666-7138) | LF | 1,780 | $75.00 | $3.00 | $3.69 | $3.50 | $3.60 | $3.50 | $3.54 |
| 139 | Reflectorized pavement marking type III (W)(6")(solid) (666-7236) | LF | 7,231 | $0.70 | $3.00 | $2.64 | $2.50 | $2.60 | $2.50 | $2.53 |
| 140 | Reflectorized pavement marking type III (W)(6")(broken) (666-7237) | LF | 1,780 | $0.70 | $4.00 | $3.69 | $3.50 | $3.60 | $3.50 | $3.54 |
| 141 | Reflectorized pavement marking type III (Y)(6")(solid) (666-7248) | LF | 7,231 | $0.90 | $3.00 | $2.64 | $2.50 | $2.60 | $2.50 | $2.53 |
| 142 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 9,730 | $0.55 | $1.00 | $0.93 | $0.88 | $0.90 | $0.88 | $0.89 |
| 143 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 39,854 | $0.60 | $1.00 | $0.70 | $0.66 | $0.70 | $0.66 | $0.67 |
| 144 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 243 | $0.60 | $1.00 | $1.16 | $1.10 | $1.20 | $1.10 | $1.11 |
| 145 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 43,542 | $0.60 | $1.00 | $0.70 | $0.66 | $0.70 | $0.66 | $0.67 |
| 146 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 33 | $230.00 | $150.00 | $158.19 | $150.00 | $150.80 | $150.00 | $151.52 |
| 147 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 6 | $355.00 | $350.00 | $369.11 | $350.00 | $351.80 | $350.00 | $353.54 |
| 148 | Prefabricated PM type C (W)(uturn arrow) (668-7096) | EACH | 5 | $350.00 | $350.00 | $369.11 | $350.00 | $351.80 | $350.00 | $353.54 |
| 149 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 37 | $300.00 | $250.00 | $263.65 | $250.00 | $251.30 | $250.00 | $252.53 |
| 150 | Reflectorized pavement marker type I-C (672-7002) | EACH | 56 | $4.50 | $8.00 | $7.91 | $7.50 | $7.60 | $7.50 | $7.58 |
| 151 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 301 | $4.00 | $8.00 | $7.91 | $7.50 | $7.60 | $7.50 | $7.58 |
| 152 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 1,022 | $4.50 | $8.00 | $7.91 | $7.50 | $7.60 | $7.50 | $7.58 |
| 153 | Eliminating existing PM & markers (4") (677-7001) | LF | 3,268 | $0.30 | $1.00 | $0.69 | $0.65 | $0.70 | $0.65 | $0.66 |
| 154 | Install highway traffic signal (isolated) (680-7002) | EACH | 2 | $25,000 | $31,000 | $47,917 | $30,803 | $28,140 | $44,827 | $45,280 |
| 155 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 29 | $325.00 | $380.00 | $317.44 | $379.54 | $346.80 | $275.00 | $277.78 |
| 156 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 3 | $325.00 | $380.00 | $322.83 | $379.54 | $346.80 | $275.00 | $277.78 |
| 157 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 29 | $325.00 | $380.00 | $320.02 | $379.54 | $346.80 | $275.00 | $277.78 |
| 158 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 6 | $325.00 | $380.00 | $317.34 | $379.54 | $346.80 | $275.00 | $277.78 |
| 159 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 29 | $325.00 | $380.00 | $320.48 | $379.54 | $346.80 | $275.00 | $277.78 |
| 160 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 3 | $325.00 | $380.00 | $330.37 | $379.54 | $346.80 | $275.00 | $277.78 |
| 161 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 12 | $850.00 | $578.00 | $878.85 | $577.56 | $527.70 | $564.00 | $569.70 |
| 162 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 29 | $210.00 | $138.00 | $205.32 | $137.51 | $125.70 | $202.00 | $204.04 |
| 163 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 3 | $275.00 | $182.00 | $262.21 | $181.52 | $165.90 | $272.00 | $274.75 |
| 164 | Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007) | LF | 3,750 | $2.25 | $1.00 | $2.26 | $1.60 | $1.50 | $2.00 | $2.02 |
| 165 | Traffic signal CBL (type A)(12 AWG)(4 conductor) (684-7009) | LF | 2,450 | $2.50 | $1.00 | $2.76 | $1.93 | $1.80 | $2.80 | $2.83 |
| 166 | Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010) | LF | 4,144 | $3.00 | $2.00 | $3.28 | $2.09 | $2.00 | $3.16 | $3.19 |
| 167 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 1,245 | $3.50 | $3.00 | $3.46 | $2.75 | $2.60 | $3.83 | $3.87 |
| 168 | Ins traffic signal PL AM(S)1 arm(36')lum (686-7039) | EACH | 2 | $17,000 | $15,000 | $17,891 | $14,852 | $13,568 | $14,567 | $14,714 |
| 169 | Ins traffic signal PL AM(S)1 arm(40')lum (686-7043) | EACH | 2 | $17,500 | $16,000 | $17,839 | $15,952 | $14,573 | $15,688 | $15,846 |
| 170 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 1 | $18,000 | $18,000 | $18,811 | $17,877 | $16,331 | $16,055 | $16,217 |
| 171 | Ins traffic signal PL AM(S)2 arm(32-32')lum (686-7107) | EACH | 1 | $20,000 | $21,000 | $17,969 | $20,627 | $18,844 | $18,222 | $18,406 |
| 172 | Ins traffic signal PL AM(S)2 arm(40-36')lum (686-7147) | EACH | 2 | $23,000 | $22,000 | $23,009 | $21,672 | $19,799 | $20,103 | $20,306 |
| 173 | Pedestrian pole assembly (687-7001) | EACH | 6 | $3,500.00 | $1,375.00 | $3,221.48 | $1,375.15 | $1,256.30 | $3,717.00 | $3,754.55 |
| 174 | Pedestrian push button pole (687-7002) | EACH | 2 | $2,500.00 | $1,095.00 | $2,489.48 | $1,094.62 | $1,000.00 | $3,402.00 | $3,436.37 |
| 175 | Pedestrian detect push button (APS) (688-7001) | EACH | 12 | $1,250.00 | $1,491.00 | $1,208.65 | $1,490.66 | $1,361.80 | $1,573.00 | $1,588.89 |
| 176 | Bonding course (3007-7001) | GAL | 27,303.70 | $3.00 | $6.00 | $5.27 | $3.00 | $2.90 | $5.53 | $5.42 |
| 177 | Amphibian/reptile exclusion fence inst (5003-7001) | LF | 44,367 | $5.00 | $4.00 | $4.91 | $4.50 | $4.60 | $4.50 | $3.18 |
| 178 | Amphibian/reptile exclusion fence rem (5003-7002) | LF | 44,367 | $2.00 | $1.00 | $1.63 | $0.65 | $1.60 | $1.00 | $1.01 |
| 179 | Bird exclusion method (5029-7001) | SF | 40,472 | $1.33 | $3.00 | $5.74 | $1.00 | $5.30 | $1.49 | $3.71 |
| 180 | RVDS (presence and advance detection) (6008-7003) | EACH | 7 | $8,000.00 | $10,000 | $17,266 | $9,626.03 | $8,793.80 | $7,160.00 | $7,232.32 |
| 181 | Radar presence detector comm cable (6008-7009) | LF | 2,344 | $5.00 | $2.00 | $3.87 | $1.98 | $1.90 | $3.45 | $3.48 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 5, 2025. Compiled by Mirage Metrics.