TxDOT contract A00191470 bid tabulation
Construct Frontage Roads, SH 99 (Fry Road to Westheimer Parkway). Let by Texas DOT on August 6, 2026, Fort Bend, Houston District. 9 bids received; low bid $32,673,736 by James Construction Group, LLC, -23% against the engineer's estimate of $42,352,206.
- Owner
- Texas DOT
- Letting
- 06 AUG 2026
- Pay items
- 225
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | James Construction Group, LLC | $32,673,736 | Low | -23% |
| 2 | MC2 Civil, LLC | $33,824,290 | +4.0% | -20% |
| 3 | R Construction Civil, LLC | $33,897,764 | +4.0% | -20% |
| 4 | Ser Construction Partners, LLC | $34,596,007 | +6.0% | -18% |
| 5 | Harper Brothers Construction LLC | $34,996,279 | +7.0% | -17% |
| 6 | Granite Construction Company | $36,972,259 | +13% | -13% |
| 7 | Ragle Construction, Inc. | $38,464,170 | +18% | -9.0% |
| 8 | Pulice Construction, Inc. | $38,957,868 | +19% | -8.0% |
| 9 | Isi Contracting, Inc. | $48,421,877 | +48% | +14% |
Engineer's estimate: $42,352,206.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. James Construction Group, LLC | 2. MC2 Civil, LLC | 3. R Construction Civil, LLC | 4. Ser Construction Partners, LLC | 5. Harper Brothers Construction LLC | 6. Granite Construction Company |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 68 | $10,000 | $18,370 | $40,000 | $1,400.00 | $4,300.00 | $3,000.00 | $40,000 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 8,196 | $10.00 | $8.87 | $10.00 | $15.00 | $14.70 | $9.36 | $10.00 |
| 3 | Removing concrete (riprap) (104-7006) | SY | 312 | $13.00 | $4.80 | $10.00 | $5.00 | $6.70 | $4.94 | $10.00 |
| 4 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 1,144 | $22.00 | $5.63 | $10.00 | $12.50 | $6.70 | $3.27 | $5.00 |
| 5 | Removing concrete (curb) (104-7016) | LF | 1,459 | $2.02 | $2.00 | $6.25 | $1.50 | $2.50 | $9.00 | |
| 6 | Removing concrete (curb or curb & gutter) (104-7018) | LF | 1,999 | $10.00 | $2.12 | $2.00 | $6.40 | $2.80 | $2.75 | $2.75 |
| 7 | Remove (7"-13") TRT/untrt base & asphalt pavement (105-7058) | SY | 7,977 | $8.00 | $3.46 | $5.00 | $3.75 | $6.00 | $3.54 | $5.00 |
| 8 | Excavation (roadway) (110-7001) | CY | 25,252 | $18.00 | $10.90 | $10.00 | $16.00 | $11.90 | $8.00 | $9.00 |
| 9 | Excavation (channel) (110-7002) | CY | 1,599 | $10.61 | $20.00 | $16.00 | $21.20 | $8.00 | $20.00 | |
| 10 | Embankment (final)(DC)(type C) (132-7006) | CY | 36,345 | $30.00 | $19.43 | $5.00 | $14.00 | $16.10 | $8.50 | $21.00 |
| 11 | Embankment (final)(DC)(type E)(csbe) (132-7036) | CY | 2,894 | $55.00 | $55.97 | $70.00 | $43.00 | $57.80 | $69.00 | $70.00 |
| 12 | Embankment (final)(DC)(type E)(csbe_FND impr) (132-7037) | CY | 1,567 | $55.00 | $55.52 | $70.00 | $54.00 | $57.80 | $69.00 | $75.00 |
| 13 | Embankment (final)(DC)(type E)(csbe_rwall impr) (132-7038) | CY | 2,049 | $55.63 | $70.00 | $51.00 | $57.80 | $69.00 | $75.00 | |
| 14 | Block sodding (162-7002) | SY | 30,866 | $5.00 | $3.39 | $3.50 | $4.75 | $4.00 | $3.39 | $3.41 |
| 15 | Straw or hay mulch (162-7003) | SY | 29,323 | $0.50 | $0.10 | $0.10 | $0.35 | $0.30 | $0.10 | $0.10 |
| 16 | Broadcast seed (temporary_warm) (164-7005) | SY | 1,544 | $0.50 | $0.18 | $0.20 | $0.15 | $0.20 | $0.18 | $0.18 |
| 17 | Drill seed (temporary_warm_cool) (164-7015) | SY | 29,323 | $0.25 | $0.20 | $0.20 | $0.19 | $0.10 | $0.20 | $0.20 |
| 18 | Fertilizer (166-7001) | ACRE | 8.91 | $1,000.00 | $625.00 | $650.00 | $925.00 | $587.50 | $625.00 | $628.93 |
| 19 | Vegetative watering (168-7001) | TGL | 1,069.70 | $20.00 | $28.00 | $15.00 | $40.00 | $29.20 | $22.00 | $9.00 |
| 20 | Lime (com or QK)(slurry) or QK(dry) (260-7001) | TON | 404 | $350.00 | $348.06 | $325.00 | $345.00 | $354.30 | $380.00 | $330.00 |
| 21 | Lime TRT (existing material)(6") (260-7006) | SY | 28,054 | $4.00 | $5.92 | $4.00 | $2.85 | $4.80 | $5.00 | $5.00 |
| 22 | Cement (275-7001) | TON | 191 | $220.00 | $172.28 | $175.00 | $183.00 | $154.50 | $195.00 | $163.75 |
| 23 | Cement TRT (existing material)(6") (275-7002) | SY | 12,306 | $3.00 | $2.92 | $4.00 | $3.95 | $7.10 | $4.00 | $3.00 |
| 24 | Cem TRT(PLNT MX)(CL N)(type E)(GR 4)(6") (276-7343) | SY | 41,147 | $20.00 | $18.75 | $18.00 | $20.00 | $12.40 | $20.00 | $18.00 |
| 25 | Asphalt TRT base (GR 4)(PG 64) (292-7014) | TON | 2,126 | $130.00 | $145.00 | $130.00 | $153.00 | $130.70 | $145.00 | $147.96 |
| 26 | Concrete pavement (CRCP) (10") (360-7004) | SY | 38,518 | $100.00 | $80.19 | $60.00 | $90.00 | $76.40 | $79.00 | $78.00 |
| 27 | Struct excavation (400-7001) | CY | 3,616 | $10.00 | $7.83 | $20.00 | $21.00 | $21.20 | $13.00 | $15.00 |
| 28 | Cem stabil BKFL (400-7010) | CY | 8,254 | $65.00 | $58.94 | $55.00 | $63.00 | $65.00 | $69.00 | $58.00 |
| 29 | Cement stab backfill (inlet or MH) (400-7011) | CY | 365 | $65.00 | $57.31 | $55.00 | $76.00 | $90.00 | $69.00 | $58.00 |
| 30 | Trench excavation protection (402-7001) | LF | 7,013 | $5.00 | $1.05 | $5.00 | $5.25 | $0.20 | $1.00 | $1.30 |
| 31 | Temporary special shoring (403-7001) | SF | 1,078 | $50.00 | $22.02 | $20.00 | $30.00 | $4.30 | $13.00 | $50.00 |
| 32 | Sheet piling (PZC - 18) (407-7005) | SF | 1,650 | $65.53 | $50.00 | $78.00 | $51.60 | $90.00 | $43.49 | |
| 33 | Prestressed concrete pil (16 in SQ) (409-7001) | LF | 272 | $239.75 | $250.00 | $285.00 | $178.80 | $184.00 | $260.00 | |
| 34 | Prestressed concrete pil (20 in SQ) (409-7003) | LF | 4,085 | $170.00 | $192.08 | $165.00 | $270.00 | $233.30 | $240.00 | $346.00 |
| 35 | Prestressed concrete pil (24 in SQ) (409-7004) | LF | 2,163 | $187.22 | $200.00 | $337.00 | $289.00 | $300.00 | $446.00 | |
| 36 | Drilled shaft (30 in) (416-7005) | LF | 9,825 | $300.00 | $185.21 | $190.00 | $214.00 | $210.60 | $185.00 | $200.00 |
| 37 | Drilled shaft (non - reinforced) (12 in) (416-7024) | LF | 7 | $100.00 | $100.00 | $104.00 | $75.60 | $215.14 | $25.00 | |
| 38 | Drilled shaft (sign mounts) (42 in) (416-7031) | LF | 194 | $520.00 | $596.70 | $650.00 | $536.00 | $525.90 | $506.67 | $518.38 |
| 39 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 112 | $275.00 | $255.66 | $260.00 | $168.00 | $165.50 | $159.42 | $258.24 |
| 40 | Sound wall (419-7001) | SF | 154,220 | $50.00 | $32.81 | $25.00 | $39.00 | $36.10 | $32.35 | $29.00 |
| 41 | Class C concrete (abutment) (420-7012) | CY | 260.40 | $1,620.00 | $827.15 | $1,300.00 | $615.00 | $1,129.30 | $1,300.00 | $1,200.00 |
| 42 | Class C concrete (cap) (420-7022) | CY | 285 | $1,500.00 | $1,072.75 | $1,200.00 | $910.00 | $1,246.60 | $1,300.00 | $1,500.00 |
| 43 | Class C concrete (footing) (420-7044) | CY | 20 | $700.81 | $1,600.00 | $1,150.00 | $1,323.30 | $1,800.00 | $1,300.00 | |
| 44 | Class C concrete (sign column) (420-7057) | CY | 102 | $2,000.00 | $1,654.18 | $1,600.00 | $980.00 | $1,366.10 | $2,100.00 | $1,500.00 |
| 45 | Class C concrete (sign footing) (420-7151) | CY | 20 | $2,000.00 | $806.42 | $1,400.00 | $1,020.00 | $1,337.70 | $1,800.00 | $1,200.00 |
| 46 | Reinforced concrete slab (422-7001) | SF | 44,915 | $26.00 | $21.00 | $25.00 | $28.00 | $23.20 | $23.00 | $28.00 |
| 47 | Ret wall (MSE) (horizontal scheme) (423-7004) | SF | 23,866 | $50.00 | $52.44 | $50.00 | $63.00 | $51.40 | $70.00 | $65.00 |
| 48 | Prestressed concrete girder (TX34) (425-7002) | LF | 2,075.90 | $216.00 | $185.96 | $186.00 | $238.00 | $205.10 | $316.30 | $200.00 |
| 49 | Prestressed concrete girder (TX46) (425-7004) | LF | 3,580.52 | $242.00 | $201.89 | $190.00 | $229.00 | $218.50 | $288.91 | $270.00 |
| 50 | Riprap (concrete)(4 in) (432-7001) | CY | 326.70 | $550.00 | $409.23 | $700.00 | $445.00 | $480.10 | $518.10 | $370.00 |
| 51 | Riprap (concrete)(5 in) (432-7002) | CY | 56 | $456.78 | $800.00 | $530.00 | $412.10 | $536.81 | $405.00 | |
| 52 | Riprap (concrete) (CL B) (4 in) (432-7007) | CY | 380.80 | $600.00 | $401.85 | $900.00 | $645.00 | $578.00 | $559.27 | $645.00 |
| 53 | Riprap (concrete)(CL B)(5 in) (432-7008) | CY | 394 | $389.51 | $750.00 | $520.00 | $412.10 | $528.97 | $610.00 | |
| 54 | Riprap (mow strip)(4 in) (432-7013) | CY | 132 | $600.00 | $582.24 | $850.00 | $620.00 | $532.90 | $527.61 | $585.00 |
| 55 | Riprap (mow strip)(5 in) (432-7014) | CY | 12 | $832.62 | $675.00 | $675.00 | $741.80 | $636.95 | $530.00 | |
| 56 | Riprap (stone common)(dry)(18 in) (432-7033) | CY | 29.40 | $317.71 | $225.00 | $239.00 | $221.20 | $300.00 | $300.00 | |
| 57 | Riprap (stone protection)(12 in) (432-7041) | CY | 235 | $250.00 | $230.59 | $200.00 | $272.00 | $217.10 | $205.00 | $250.00 |
| 58 | Riprap (concrete)(CL B)(RR8&RR9) (432-7055) | CY | 193 | $700.00 | $462.37 | $725.00 | $529.00 | $518.20 | $533.30 | $555.60 |
| 59 | STR steel (miscellaneous non-bridge) (442-7007) | LB | 1,033 | $40.00 | $19.19 | $20.00 | $31.00 | $29.40 | $12.37 | $21.36 |
| 60 | Rail (type SSTR) (450-7024) | LF | 5,312.30 | $85.00 | $56.51 | $67.00 | $80.00 | $56.60 | $58.00 | $61.44 |
| 61 | Rail (type C221) (450-7032) | LF | 7,146.80 | $145.00 | $74.32 | $105.00 | $132.00 | $84.30 | $100.00 | $101.79 |
| 62 | Rail (type PR11) (450-7044) | LF | 586 | $105.51 | $105.00 | $175.00 | $117.30 | $140.00 | $126.78 | |
| 63 | Rail (handrail)(type F) (450-7063) | LF | 476 | $200.00 | $127.33 | $120.00 | $200.00 | $144.60 | $195.00 | $123.96 |
| 64 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 456 | $220.00 | $212.30 | $240.00 | $200.00 | $203.90 | $250.00 | $264.00 |
| 65 | Concrete box culvert (3 FT X 3 FT) (462-7002) | LF | 837 | $350.00 | $235.69 | $350.00 | $245.00 | $293.70 | $280.00 | $250.00 |
| 66 | Concrete box culvert (4 FT X 2 FT) (462-7003) | LF | 86 | $262.15 | $400.00 | $307.00 | $298.80 | $320.00 | $275.00 | |
| 67 | Concrete box culvert (5 FT X 2 FT) (462-7006) | LF | 42 | $500.00 | $345.33 | $450.00 | $380.00 | $438.70 | $500.00 | $350.00 |
| 68 | Concrete box culvert (5 FT X 3 FT) (462-7007) | LF | 3,644 | $430.00 | $323.56 | $425.00 | $344.00 | $406.90 | $375.00 | $350.00 |
| 69 | Concrete box culvert (6 FT X 3 FT) (462-7011) | LF | 4,042.50 | $525.00 | $397.84 | $500.00 | $409.00 | $496.70 | $440.00 | $400.00 |
| 70 | RC pipe (CL III)(24 in) (464-7005) | LF | 2,236 | $100.00 | $72.42 | $130.00 | $74.00 | $106.70 | $150.00 | $90.00 |
| 71 | RC pipe (CL III)(30 in) (464-7007) | LF | 556 | $150.00 | $84.85 | $150.00 | $92.00 | $125.00 | $150.00 | $125.00 |
| 72 | RC pipe (CL III)(36 in) (464-7009) | LF | 129 | $180.00 | $134.72 | $210.00 | $133.00 | $163.00 | $220.00 | $150.00 |
| 73 | Junction box(complete)(PJB)(5FTX5FT) (465-7009) | EACH | 1 | $3,772.35 | $10,000 | $6,400.00 | $7,684.70 | $4,400.00 | $5,000.00 | |
| 74 | Junction box(complete)(PJB)(8FTX8FT) (465-7012) | EACH | 4 | $6,727.61 | $13,000 | $14,300 | $16,234 | $8,500.00 | $7,000.00 | |
| 75 | Inlet (complete)(PSL)(RC)(4FTX4FT) (465-7071) | EACH | 1 | $5,159.86 | $7,000.00 | $3,200.00 | $4,305.80 | $5,500.00 | $6,000.00 | |
| 76 | Inlet (complete)(PSL)(FG)(8FTX8FT-3FTX3FT) (465-7143) | EACH | 1 | $5,539.37 | $12,000 | $11,200 | $17,002 | $7,000.00 | $6,000.00 | |
| 77 | Inlet (complete)(curb)(type C1)(left)(hou) (465-7310) | EACH | 5 | $7,500.00 | $7,923.75 | $12,000 | $4,800.00 | $8,821.40 | $10,500 | $10,000 |
| 78 | Inlet (complete)(curb)(type C1)(right)(hou) (465-7311) | EACH | 4 | $7,500.00 | $5,008.86 | $8,000.00 | $3,950.00 | $8,263.00 | $8,000.00 | $6,500.00 |
| 79 | Inlet (complete)(curb)(type C1)(both)(hou) (465-7312) | EACH | 25 | $8,000.00 | $6,948.54 | $10,000 | $4,450.00 | $7,495.20 | $9,500.00 | $8,500.00 |
| 80 | Inlet (complete)(type AD)(hou) (465-7314) | EACH | 9 | $10,000 | $3,807.40 | $5,000.00 | $3,550.00 | $3,381.10 | $5,000.00 | $5,000.00 |
| 81 | Inlet (complete)(type aad)(hou) (465-7315) | EACH | 26 | $9,000.00 | $5,778.38 | $7,000.00 | $4,700.00 | $6,348.30 | $7,000.00 | $7,000.00 |
| 82 | Inlet (complete)(type AZ2G)(hou) (465-7317) | EACH | 4 | $12,000 | $6,408.43 | $8,000.00 | $6,300.00 | $8,231.90 | $9,000.00 | $8,000.00 |
| 83 | Inlet (complete)(type azr)(hou) (465-7318) | EACH | 3 | $3,567.59 | $11,000 | $5,600.00 | $6,836.30 | $7,167.07 | $5,500.00 | |
| 84 | Inlet (complete)(type AZR2G)(hou) (465-7319) | EACH | 3 | $12,000 | $7,132.04 | $15,000 | $7,200.00 | $11,416 | $11,410 | $9,000.00 |
| 85 | Manh(comp)(junct box) (465-7347) | EACH | 7 | $20,000 | $15,352 | $15,000 | $11,100 | $15,563 | $15,224 | $12,000 |
| 86 | Set (type I)(S= 4 FT)(HW= 2 FT)(4:1)(C) (467-7064) | EACH | 1 | $6,376.56 | $8,250.00 | $8,750.00 | $6,550.70 | $9,779.26 | $25,000 | |
| 87 | Set (type I)(S= 6 FT)(HW= 3 FT)(4:1)(C) (467-7125) | EACH | 1 | $7,350.95 | $9,250.00 | $15,900 | $11,748 | $10,840 | $35,000 | |
| 88 | Adjusting inlets (479-7002) | EACH | 1 | $1,651.33 | $2,500.00 | $500.00 | $612.60 | $1,319.33 | $2,500.00 | |
| 89 | Removing structure (inlet) (496-7002) | EACH | 15 | $1,000.00 | $895.38 | $500.00 | $760.00 | $288.30 | $567.69 | $1,000.00 |
| 90 | Removing structure (manhole) (496-7003) | EACH | 3 | $1,500.00 | $895.38 | $500.00 | $760.00 | $576.60 | $614.28 | $1,000.00 |
| 91 | Removing structure (set) (496-7004) | EACH | 2 | $600.00 | $596.90 | $500.00 | $2,250.00 | $160.90 | $460.71 | $1,500.00 |
| 92 | Removing structure (wingwall) (496-7005) | EACH | 3 | $2,916.51 | $750.00 | $3,400.00 | $2,127.00 | $855.20 | $2,000.00 | |
| 93 | Removing structure (headwall) (496-7006) | EACH | 2 | $2,000.00 | $1,269.72 | $1,000.00 | $2,700.00 | $4,253.90 | $1,000.00 | $2,000.00 |
| 94 | Removing structure (pipe) (496-7007) | LF | 1,658 | $50.00 | $12.00 | $10.00 | $35.00 | $17.20 | $15.00 | $30.00 |
| 95 | Removing structure (box culvert) (496-7008) | LF | 395 | $37.06 | $40.00 | $98.00 | $34.70 | $35.00 | $30.00 | |
| 96 | Remove STR (rail) (496-7017) | LF | 484 | $70.00 | $22.94 | $9.00 | $90.00 | $10.10 | $56.11 | $40.00 |
| 97 | Removing structure (ret wall) (496-7019) | LF | 236 | $53.25 | $10.00 | $52.00 | $35.60 | $60.00 | $15.00 | |
| 98 | Mobilization (500-7001) | LS | 1 | $4,000,000 | $3,000,000 | $3,000,000 | $1,100,000 | $3,200,000 | $3,000,000 | $2,700,000 |
| 99 | Barricades, signs and traffic handling (502-7001) | MO | 18 | $8,000.00 | $8,278.69 | $10,000 | $8,300.00 | $13,279 | $19,500 | $7,000.00 |
| 100 | Portable changeable message sign (503-7001) | DAY | 600 | $100.00 | $1.00 | $60.00 | $250.00 | $46.40 | $50.00 | $55.00 |
| 101 | TMA (stationary) (505-7001) | DAY | 20 | $220.00 | $232.81 | $470.00 | $735.00 | $309.00 | $260.00 | $430.00 |
| 102 | TMA (mobile operation) (505-7003) | DAY | 80 | $200.00 | $595.60 | $1,100.00 | $1,130.00 | $689.30 | $900.00 | $1,045.00 |
| 103 | Construction exits (install) (type 1) (506-7020) | SY | 312 | $28.00 | $32.00 | $25.00 | $29.00 | $30.80 | $32.00 | $32.35 |
| 104 | Construction exits (remove) (506-7024) | SY | 312 | $9.00 | $20.00 | $10.00 | $10.00 | $12.40 | $20.00 | $20.22 |
| 105 | Temporary sediment control fence (install) (506-7039) | LF | 7,958 | $4.00 | $2.95 | $2.25 | $1.80 | $3.70 | $2.90 | $2.98 |
| 106 | Temporary sediment control fence (remove) (506-7041) | LF | 7,958 | $1.20 | $1.00 | $0.60 | $0.60 | $1.00 | $1.00 | $1.01 |
| 107 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 440 | $8.00 | $7.00 | $6.00 | $6.80 | $8.00 | $8.09 | |
| 108 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 1,622 | $6.00 | $8.50 | $7.00 | $7.00 | $7.60 | $8.50 | $8.59 |
| 109 | Biodegradable erosion control logs (remove) (506-7046) | LF | 2,062 | $1.25 | $2.00 | $2.00 | $2.00 | $1.00 | $2.00 | $2.02 |
| 110 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 4,770 | $78.91 | $50.00 | $76.00 | $73.70 | $85.00 | $80.00 | |
| 111 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 880 | $39.82 | $25.00 | $72.00 | $20.30 | $85.00 | $70.00 | |
| 112 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 40 | $40.00 | $25.00 | $83.00 | $20.30 | $95.00 | $75.09 | |
| 113 | Portable concrete traffic barrier (des source)(single slope)(type 1) (512-7013) | LF | 4,160 | $17.00 | $9.84 | $25.00 | $6.75 | $15.90 | $9.00 | $8.99 |
| 114 | Portable concrete traffic barrier (des source)(low prof)(type 1) (512-7021) | LF | 1,820 | $30.00 | $8.83 | $15.00 | $6.00 | $14.40 | $9.00 | $8.64 |
| 115 | Portable concrete traffic barrier (des source)(low prof)(type 2) (512-7022) | LF | 40 | $30.00 | $12.84 | $15.00 | $34.00 | $19.00 | $25.00 | $28.23 |
| 116 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 2,031 | $10.00 | $6.13 | $8.00 | $8.50 | $11.00 | $9.50 | $5.32 |
| 117 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 2,440 | $10.00 | $4.98 | $8.00 | $7.00 | $11.20 | $9.50 | $4.58 |
| 118 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 60 | $15.00 | $5.37 | $8.00 | $11.00 | $11.30 | $13.00 | $10.33 |
| 119 | Portable concrete traffic barrier (stockpile)(single slope)(type 1) (512-7037) | LF | 8,276 | $13.00 | $10.05 | $10.00 | $6.75 | $15.90 | $8.00 | $7.98 |
| 120 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 2,580 | $9.00 | $7.45 | $10.00 | $4.60 | $14.40 | $8.00 | $7.29 |
| 121 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 80 | $18.00 | $36.39 | $10.00 | $5.70 | $14.30 | $10.00 | $24.43 |
| 122 | Portable concrete traffic barrier (connection hardware) (512-7070) | EACH | 179 | $35.00 | $105.86 | $100.00 | $174.00 | $102.00 | $50.00 | $99.00 |
| 123 | Concrete curb (mono) (type I) (529-7006) | LF | 604 | $4.43 | $4.00 | $11.50 | $3.70 | $6.00 | $6.00 | |
| 124 | Concrete curb (mono) (type II) (529-7007) | LF | 17,965 | $8.00 | $3.39 | $4.00 | $10.50 | $3.70 | $5.10 | $5.00 |
| 125 | Concrete sidewalks (5") (531-7002) | SY | 15,994 | $75.00 | $56.29 | $50.00 | $66.00 | $62.00 | $75.00 | $52.00 |
| 126 | Concrete sidewalks (6") (531-7003) | SY | 1,287 | $90.00 | $70.61 | $55.00 | $73.00 | $72.00 | $78.00 | $65.00 |
| 127 | Metal W-beam guard fence (timber post) (540-7001) | LF | 412.50 | $30.00 | $24.00 | $28.50 | $30.00 | $30.90 | $28.50 | $24.00 |
| 128 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,200.00 | $1,675.00 | $2,450.00 | $2,500.00 | $2,266.00 | $2,450.00 | $1,675.00 |
| 129 | Downstream anchor terminal section (540-7015) | EACH | 2 | $1,650.00 | $1,350.00 | $1,650.00 | $1,250.00 | $1,236.00 | $1,650.00 | $1,350.00 |
| 130 | Remove metal beam guard fence (542-7001) | LF | 110 | $10.00 | $3.00 | $5.00 | $3.00 | $4.00 | $5.00 | $3.00 |
| 131 | Remove terminal anchor section (542-7002) | EACH | 1 | $150.00 | $500.00 | $220.00 | $246.20 | $500.00 | $150.00 | |
| 132 | Guardrail end treatment (install) (544-7001) | EACH | 6 | $3,400.00 | $3,050.00 | $3,650.00 | $3,500.00 | $3,605.00 | $3,650.00 | $3,050.00 |
| 133 | Guardrail end treatment (remove) (544-7003) | EACH | 2 | $300.00 | $200.00 | $300.00 | $335.00 | $329.10 | $300.00 | $200.00 |
| 134 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 1 | $2,500.00 | $2,500.00 | $2,850.00 | $3,150.00 | $3,012.80 | $2,850.00 | $766.35 |
| 135 | Crash cushion attenuator (remove) (545-7004) | EACH | 4 | $1,500.00 | $1,000.00 | $1,200.00 | $1,100.00 | $1,003.20 | $1,200.00 | $1,149.54 |
| 136 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 1 | $24,500 | $25,850 | $28,200 | $23,873 | $25,850 | $23,491 | |
| 137 | Cca (install)(N)(TL3)(work zone) (545-7018) | EACH | 5 | $10,000 | $8,300.00 | $8,650.00 | $28,200 | $23,873 | $8,650.00 | $8,523.16 |
| 138 | Chain link fence (remove) (550-7007) | LF | 1,699 | $11.00 | $8.00 | $11.50 | $4.90 | $2.68 | $11.78 | |
| 139 | Remove RD IL asm (trans-base) (610-7009) | EACH | 15 | $500.00 | $252.20 | $255.00 | $970.00 | $953.00 | $919.00 | $254.75 |
| 140 | In RD IL (U/P) (type 1) (150W EQ) LED (610-7014) | EACH | 2 | $1,694.85 | $1,700.00 | $1,770.00 | $1,737.60 | $1,675.00 | $1,711.97 | |
| 141 | In RD IL (U/P) (type 1) (250W EQ) LED (610-7015) | EACH | 4 | $2,400.00 | $1,694.85 | $1,700.00 | $2,300.00 | $2,334.90 | $2,250.00 | $1,711.97 |
| 142 | In RD IL (type AL) 40S-8 (250W EQ) LED (610-7132) | EACH | 11 | $6,000.00 | $6,121.06 | $6,100.00 | $5,900.00 | $6,001.00 | $5,781.36 | $6,182.89 |
| 143 | In RD IL (type ST) 40T-8 (250W EQ) LED (610-7164) | EACH | 3 | $5,331.96 | $5,300.00 | $6,200.00 | $6,108.30 | $5,885.00 | $5,385.82 | |
| 144 | Conduit (HDPE) (2") (618-7009) | LF | 3,313 | $17.00 | $8.13 | $8.00 | $7.50 | $7.60 | $9.35 | $8.21 |
| 145 | Conduit (HDPE) (2") bore (618-7010) | LF | 252 | $50.00 | $18.05 | $18.00 | $8.00 | $8.30 | $7.95 | $18.23 |
| 146 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 11,380 | $18.00 | $8.87 | $9.00 | $10.25 | $10.50 | $10.16 | $8.96 |
| 147 | Conduit (PVC) (schedule 40) (3") (bore) (618-7037) | LF | 350 | $34.00 | $56.48 | $56.00 | $39.50 | $40.40 | $38.93 | $57.05 |
| 148 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 3,004 | $8.46 | $8.00 | $8.75 | $9.00 | $8.66 | $8.55 | |
| 149 | Conduit (RM) (2") (618-7078) | LF | 223 | $30.00 | $5.00 | $30.00 | $34.00 | $34.80 | $33.50 | $35.35 |
| 150 | ITS multi-duct CND (PVC-40)(concrete encse) (619-7003) | LF | 11,730 | $35.00 | $20.83 | $20.00 | $19.00 | $19.40 | $18.64 | $21.04 |
| 151 | ITS multi-duct CND (PVC-80)(bore) (619-7006) | LF | 300 | $28.00 | $63.93 | $64.00 | $65.00 | $66.20 | $63.75 | $64.58 |
| 152 | Electrical conductor (no.14) insulated (620-7002) | LF | 5,865 | $1.00 | $1.58 | $1.60 | $0.55 | $0.60 | $0.53 | $1.60 |
| 153 | Electrical conductor (no.8) bare (620-7007) | LF | 6,627 | $2.00 | $2.05 | $2.00 | $1.20 | $1.20 | $1.17 | $2.07 |
| 154 | Electrical conductor (no.8) insulated (620-7008) | LF | 12,088 | $2.00 | $2.31 | $2.50 | $1.50 | $1.50 | $1.46 | $2.33 |
| 155 | Electrical conductor (no.6) bare (620-7009) | LF | 150 | $1.75 | $2.51 | $2.50 | $2.40 | $2.40 | $2.34 | $2.54 |
| 156 | Electrical conductor (no.6) insulated (620-7010) | LF | 150 | $2.00 | $2.83 | $3.00 | $2.80 | $2.90 | $2.76 | $2.86 |
| 157 | Electrical conductor (no.4) bare (620-7011) | LF | 150 | $3.00 | $3.21 | $3.25 | $3.25 | $3.30 | $3.20 | $3.24 |
| 158 | Electrical conductor (no.4) insulated (620-7012) | LF | 150 | $3.50 | $3.61 | $3.50 | $3.70 | $3.80 | $3.63 | $3.65 |
| 159 | Ground box type A (122311) (624-7001) | EACH | 8 | $1,250.00 | $1,093.64 | $1,100.00 | $750.00 | $764.40 | $736.45 | $1,104.69 |
| 160 | Ground box type A (122311)W/apron (624-7002) | EACH | 11 | $1,226.17 | $1,225.00 | $1,000.00 | $1,018.50 | $1,050.00 | $1,238.56 | |
| 161 | Remove ground box (624-7013) | EACH | 5 | $400.00 | $189.16 | $190.00 | $450.00 | $458.70 | $441.91 | $191.07 |
| 162 | Elc SRV type A 240/480 060(NS)SS(E)SP(U) (628-7049) | EACH | 2 | $7,704.16 | $7,700.00 | $9,500.00 | $9,653.90 | $9,300.55 | $7,781.98 | |
| 163 | Elc SRV type A 240/480 060(SS)SS(E)SP(O) (628-7057) | EACH | 2 | $8,800.00 | $9,364.52 | $9,350.00 | $11,000 | $11,314 | $10,900 | $9,459.11 |
| 164 | Aluminum signs (type G) (636-7002) | SF | 60 | $35.00 | $42.00 | $42.00 | $41.00 | $41.50 | $40.00 | $40.72 |
| 165 | Aluminum signs (type O) (636-7003) | SF | 312.50 | $45.00 | $38.46 | $38.00 | $30.00 | $30.30 | $56.00 | $29.68 |
| 166 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 6 | $660.00 | $668.00 | $670.00 | $720.00 | $736.50 | $720.88 | $253.00 |
| 167 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 1 | $800.00 | $965.00 | $965.00 | $1,025.00 | $1,014.60 | $1,027.24 | $253.00 |
| 168 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 16 | $800.00 | $759.00 | $760.00 | $1,050.00 | $1,014.60 | $914.15 | $253.00 |
| 169 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 1 | $1,050.00 | $1,050.00 | $1,200.00 | $2,575.00 | $1,183.60 | $253.00 | |
| 170 | Remove SM RD SN sup&AM (644-7073) | EACH | 14 | $90.00 | $85.00 | $85.00 | $115.00 | $154.50 | $130.00 | $150.00 |
| 171 | Install LRSS (struct steel) (647-7001) | LB | 389.20 | $10.00 | $8.68 | $8.00 | $8.00 | $7.40 | $7.11 | $7.23 |
| 172 | Install overhead sign support(20 FT cant)(span only) (650-7020) | EACH | 2 | $20,801 | $20,800 | $20,000 | $20,278 | $19,535 | $19,886 | |
| 173 | Install overhead sign support(35 FT cant) (650-7038) | EACH | 1 | $20,000 | $29,033 | $29,000 | $30,000 | $30,290 | $29,182 | $29,705 |
| 174 | Remove overhd sign sup (650-7193) | EACH | 2 | $10,000 | $315.26 | $315.00 | $8,500.00 | $8,700.00 | $8,381.54 | $8,531.91 |
| 175 | Work zone pavement marking removing (W)4"(solid) (662-7064) | LF | 5,541 | $0.75 | $2.00 | $1.20 | $1.50 | $2.10 | $1.17 | $1.18 |
| 176 | Work zone pavement marking removing (Y)4"(solid) (662-7097) | LF | 2,826 | $0.75 | $2.00 | $1.20 | $1.50 | $2.10 | $1.17 | $1.18 |
| 177 | Reflectorized pavement marking type II (W) (entr gore) (666-7195) | EACH | 1 | $200.00 | $289.00 | $100.00 | $128.00 | $297.78 | $100.00 | $101.01 |
| 178 | Reflectorized pavement marking type II (W) (exit gore) (666-7196) | EACH | 1 | $200.00 | $289.00 | $100.00 | $130.00 | $297.70 | $100.00 | $101.01 |
| 179 | Reflectorized pavement marking type III (W)(6")(solid) (666-7236) | LF | 8,686 | $1.00 | $1.00 | $1.00 | $1.20 | $1.00 | $0.92 | $0.93 |
| 180 | Reflectorized pavement marking type III (W)(6")(broken) (666-7237) | LF | 10,320 | $0.80 | $1.00 | $1.00 | $1.20 | $1.00 | $0.92 | $0.93 |
| 181 | Reflectorized pavement marking type III (W)(6")(DOT) (666-7238) | LF | 808 | $3.00 | $1.00 | $1.00 | $1.30 | $1.00 | $3.50 | $0.50 |
| 182 | Reflectorized pavement marking type III (W)(8")(solid) (666-7239) | LF | 2,420 | $2.00 | $2.00 | $2.00 | $2.80 | $2.10 | $2.15 | $2.17 |
| 183 | Reflectorized pavement marking type III (W)(12")(solid) (666-7242) | LF | 2,635 | $2.50 | $5.00 | $4.50 | $6.00 | $5.20 | $4.50 | $4.55 |
| 184 | Reflectorized pavement marking type III (W)(24")(solid) (666-7244) | LF | 950 | $8.00 | $10.00 | $10.00 | $13.00 | $10.30 | $10.00 | $10.10 |
| 185 | Reflectorized pavement marking type III (Y)(6")(solid) (666-7248) | LF | 3,426 | $1.00 | $1.00 | $1.00 | $1.20 | $1.00 | $0.92 | $0.93 |
| 186 | Reflectorized pavement marking type III (BLK)(6")(shadow) (666-7262) | LF | 10,320 | $0.80 | $1.00 | $1.00 | $1.20 | $1.00 | $0.92 | $0.93 |
| 187 | Pavement sler (arrow) (666-7353) | EACH | 8 | $35.00 | $20.00 | $5.00 | $6.50 | $20.60 | $5.00 | $5.05 |
| 188 | Pavement sler (word) (666-7354) | EACH | 8 | $40.00 | $20.00 | $5.00 | $6.50 | $20.60 | $5.00 | $5.05 |
| 189 | Pavement sler (double arrow) (666-7356) | EACH | 2 | $40.00 | $20.00 | $5.00 | $6.50 | $20.60 | $5.00 | $5.05 |
| 190 | Pavement sler (uturn arrow) (666-7358) | EACH | 2 | $40.00 | $20.00 | $5.00 | $6.50 | $20.60 | $5.00 | $5.05 |
| 191 | Pavement sler (entr gore) (666-7361) | EACH | 1 | $250.00 | $20.00 | $50.00 | $64.00 | $20.60 | $50.00 | $50.51 |
| 192 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 8 | $200.00 | $250.00 | $270.00 | $340.00 | $257.50 | $267.42 | $270.12 |
| 193 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 2 | $300.00 | $250.00 | $360.00 | $460.00 | $257.50 | $362.34 | $366.00 |
| 194 | Prefabricated PM type C (W)(uturn arrow) (668-7096) | EACH | 2 | $320.00 | $250.00 | $375.00 | $475.00 | $257.50 | $373.98 | $377.76 |
| 195 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 8 | $275.00 | $250.00 | $320.00 | $405.00 | $257.50 | $318.12 | $321.33 |
| 196 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 871 | $5.00 | $7.00 | $6.00 | $8.00 | $7.20 | $6.00 | $6.06 |
| 197 | Eliminating existing PM & markers (6") (677-7002) | LF | 3,423 | $0.45 | $0.35 | $0.50 | $0.65 | $0.40 | $0.49 | $0.49 |
| 198 | Eliminating existing PM & markers (8") (677-7004) | LF | 1,157 | $0.80 | $0.45 | $1.00 | $1.25 | $0.50 | $0.96 | $1.27 |
| 199 | Eliminating existing PM & markers (24") (677-7008) | LF | 100 | $3.00 | $2.00 | $2.50 | $3.40 | $2.10 | $2.65 | $2.68 |
| 200 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 8 | $50.00 | $25.00 | $70.00 | $90.00 | $25.80 | $70.00 | $70.71 |
| 201 | Eliminating existing PM & markers (word) (677-7015) | EACH | 6 | $55.00 | $25.00 | $75.00 | $95.00 | $25.80 | $75.00 | $75.76 |
| 202 | Pavement surface preparation for marking (6") (678-7002) | LF | 4,725 | $0.05 | $0.03 | $0.05 | $0.08 | $0.10 | $0.06 | $0.06 |
| 203 | Pavement surface preparation for marking (8") (678-7004) | LF | 3,620 | $0.12 | $0.05 | $0.10 | $0.11 | $0.10 | $0.08 | $0.08 |
| 204 | Pavement surface preparation for marking (24") (678-7008) | LF | 100 | $0.50 | $0.25 | $0.25 | $0.32 | $0.30 | $0.24 | $0.24 |
| 205 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 6 | $20.00 | $10.00 | $5.00 | $6.40 | $10.30 | $5.00 | $5.05 |
| 206 | Pavement surface preparation for marking (word) (678-7016) | EACH | 5 | $25.00 | $10.00 | $5.00 | $6.40 | $10.30 | $5.00 | $5.05 |
| 207 | VIVDS cable (install) (690-7137) | LF | 200 | $2.50 | $1.27 | $1.25 | $1.25 | $1.30 | $1.21 | $1.28 |
| 208 | Full - width mowing (730-7019) | CYC | 6 | $4,000.00 | $1,137.42 | $2,500.00 | $1,300.00 | $3,927.20 | $4,000.00 | $2,510.00 |
| 209 | Litter removal (734-7002) | CYC | 6 | $2,800.00 | $867.76 | $900.00 | $3,200.00 | $3,848.20 | $1,433.58 | $502.00 |
| 210 | Debris removing-CNTR med/MN LNS/ramps (735-7002) | CYC | 6 | $1,000.00 | $1,315.74 | $900.00 | $400.00 | $3,848.20 | $1,433.58 | $1,000.00 |
| 211 | Cleaning / sweeping (frontage road) (738-7050) | CYC | 16 | $3,000.00 | $2,031.36 | $2,500.00 | $900.00 | $1,527.40 | $1,500.00 | $1,667.20 |
| 212 | Wide flange pavement terminals (3003-7001) | LF | 250 | $640.00 | $805.38 | $840.00 | $220.00 | $716.90 | $950.00 | $1,800.00 |
| 213 | Install bridge identification numbers (4019-7001) | EACH | 1 | $500.00 | $500.00 | $500.00 | $500.00 | $103.03 | $500.00 | $500.00 |
| 214 | Ground box (install) (6013-7004) | EACH | 12 | $900.00 | $4,406.24 | $4,400.00 | $1,100.00 | $5,526.50 | $5,321.23 | $4,450.75 |
| 215 | FO CBL (12 SMF)(pigtail) (6027-7020) | LF | 1,720 | $3.00 | $3.56 | $3.50 | $7.70 | $7.90 | $7.58 | $3.60 |
| 216 | FO CBL (96 SMF) (6027-7029) | LF | 11,730 | $3.00 | $5.05 | $5.00 | $3.20 | $3.30 | $3.14 | $5.10 |
| 217 | Wireless WWD system (6028-7001) | EACH | 1 | $70,000 | $13,871 | $14,000 | $57,000 | $58,214 | $56,083 | $14,011 |
| 218 | Water main pipe (PVC)(C900)(6 in) (7004-7004) | LF | 392 | $75.00 | $68.00 | $46.00 | $28.00 | $60.30 | $80.00 | $125.00 |
| 219 | Water main pipe (PVC)(C900)(12 in) (7004-7007) | LF | 773 | $150.00 | $189.50 | $90.00 | $46.00 | $169.40 | $140.00 | $200.00 |
| 220 | Casing steel (18 in) (7004-7022) | LF | 89 | $300.00 | $330.00 | $350.00 | $115.00 | $169.70 | $200.00 | $2,000.00 |
| 221 | Cut and plug water main (6 in) (7004-7025) | EACH | 1 | $2,000.00 | $581.00 | $1,300.00 | $1,950.00 | $1,173.90 | $750.00 | $2,500.00 |
| 222 | Cut and plug water main (12 in) (7004-7027) | EACH | 1 | $2,000.00 | $802.50 | $1,450.00 | $1,950.00 | $1,441.70 | $1,100.00 | $5,000.00 |
| 223 | Wet connection (12 in) (7004-7047) | EACH | 2 | $2,000.00 | $2,627.00 | $1,900.00 | $3,500.00 | $2,864.50 | $4,500.00 | $5,000.00 |
| 224 | Remove existing water pipe (12 in) (7004-7052) | LF | 193 | $20.00 | $14.50 | $10.00 | $36.00 | $26.10 | $14.00 | $50.00 |
| 225 | Wet connection (6 in) (7004-7059) | EACH | 1 | $1,000.00 | $1,427.50 | $2,500.00 | $3,500.00 | $1,351.90 | $2,000.00 | $4,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 6, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.