TxDOT contract A00186223 bid tabulation

Construct Frontage Roads, SH 99 (Longenbaugh Road to FM 529). Let by Texas DOT on October 8, 2025, Harris, Houston District. 10 bids received; low bid $6,547,219 by Ser Construction Partners, LLC, -25% against the engineer's estimate of $8,730,472.

Owner
Texas DOT
Letting
08 OCT 2025
Pay items
138
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Ser Construction Partners, LLC$6,547,219Low-25%
2MC2 Civil, LLC$7,835,083+20%-10%
3Icon GC, LLC$8,156,594+25%-7.0%
4Isi Contracting, Inc.$8,353,698+28%-4.0%
5Granite Construction Company$8,467,146+29%-3.0%
6Texas Materials Group, Inc.$8,530,410+30%-2.0%
7Environmental Allies, Inc.$8,573,510+31%-2.0%
8C. E. Barker, LTD.$8,955,745+37%+3.0%
9MBN Enterprises LLC$10,021,013+53%+15%
10R Construction Civil, LLC$10,488,104+60%+20%
TxDOT contract A00186223: bids by rank

Engineer's estimate: $8,730,472.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Ser Construction Partners, LLC2. MC2 Civil, LLC3. Icon GC, LLC4. Isi Contracting, Inc.5. Granite Construction Company6. Texas Materials Group, Inc.
1Preparing row (100-7002)STA52.93$4,000.00$1,600.00$7,350.00$3,991.00$2,969.00$16,000$1,000.00
2Removing concrete (pavement) (104-7001)SY223$25.00$100.60$130.00$109.00$113.00$50.00$113.00
3Removing concrete (riprap) (104-7006)SY2,191$12.00$13.50$10.00$9.00$12.00$10.00$14.00
4Removing concrete (curb ramp) (104-7015)SY8$135.00$11.50$80.00$63.00$275.00$50.00$205.00
5Remove (4") TRT/untrt base & asphalt pavement (105-7024)SY12$20.00$11.50$150.00$59.00$115.00$50.00$130.00
6Remove (7"-13") TRT/untrt base & asphalt pavement (105-7058)SY557$25.00$33.90$20.00$5.00$72.00$15.00$37.00
7Excavation (roadway) (110-7001)CY36,812$22.50$6.50$5.00$6.00$15.00$10.00$9.00
8Embankment (final)(DC)(type C) (132-7006)CY34,216$15.00$3.10$5.00$16.00$10.50$6.00$20.00
9Compost manuf topsoil (4") (161-7002)SY4,560$3.00$1.30$1.00$3.00$0.93$0.84$1.00
10Block sodding (162-7002)SY51,443$5.25$4.60$3.50$4.00$3.76$3.41$4.00
11Straw or hay mulch (162-7003)SY16,320$0.35$0.30$0.25$0.26$0.22$0.20$0.25
12Broadcast seed (temporary_warm_cool) (164-7007)SY514$0.25$0.20$0.15$0.17$0.15$0.13$0.15
13Broadcast seed (OPT1) (164-7008)SY46$0.25$0.20$0.18$0.20$0.17$0.15$0.20
14Drill seed (temporary_warm_cool) (164-7015)SY11,201$0.30$0.20$0.15$0.17$0.15$0.13$0.15
15Drill seed (OPT1) (164-7016)SY4,560$0.40$0.20$0.18$0.20$0.17$0.15$0.20
16Fertilizer (166-7001)ACRE14.01$1,150.00$14.40$650.00$755.00$655.00$594.04$690.00
17Vegetative watering (168-7001)TGL1,680$40.00$31.90$35.00$43.00$38.00$25.00$40.00
18Lime (com or QK)(slurry) or QK(dry) (260-7001)TON351$360.00$344.50$400.00$419.00$357.00$324.00$380.00
19Lime TRT (existing material)(8") (260-7007)SY19,476$5.00$3.70$6.00$7.00$12.10$5.18$10.75
20Cem TRT(PLNT MX)(CL N)(type E)(GR 4)(6") (276-7343)SY19,476$16.00$20.70$25.00$34.59$20.00$17.26$29.00
21Asphalt TRT base (GR 4)(PG 64) (292-7014)TON1,071$150.00$159.80$110.00$196.00$181.00$200.00$175.00
22Concrete pavement (CRCP) (10") (360-7004)SY16,388$90.00$73.90$80.00$125.00$89.00$100.00$91.15
23Concrete pavement (CRCP) (12") (360-7006)SY2,140$105.00$89.40$120.00$191.28$151.00$205.00$135.00
24Cem stabil BKFL (400-7010)CY2,299$70.00$57.30$60.00$6.00$59.00$75.00$63.00
25Cement stab backfill (inlet or MH) (400-7011)CY283$60.00$57.30$60.00$6.00$59.00$75.00$63.00
26Trench excavation protection (402-7001)LF2,890$5.00$0.10$2.00$0.01$4.13$1.00$6.00
27Class C concrete (rail foundation) (420-7052)CY12$1,100.00$846.40$1,200.00$1,026.00$2,529.00$633.07$744.00
28Riprap (concrete)(CL B)(5 in) (432-7008)CY1,503$500.00$531.60$725.00$370.00$415.00$310.54$764.00
29Riprap (concrete) (CL B) (6 in) (432-7009)CY7$1,500.00$545.70$2,000.00$444.00$1,194.00$604.99$811.00
30Rail (type SSTR) (450-7024)LF458$115.00$61.90$115.00$186.00$84.00$87.91$85.00
31Concrete box culvert (5 FT X 3 FT) (462-7007)LF116$450.00$416.70$450.00$447.00$431.00$450.00$458.00
32Concrete box culvert (6 FT X 3 FT) (462-7011)LF116$500.00$506.50$525.00$543.00$518.00$500.00$540.00
33Concrete box culvert (6 FT X 4 FT) (462-7012)LF652$550.00$556.90$600.00$593.00$470.00$550.00$590.00
34Concrete box culvert (6 FT X 4 FT)(extend) (462-7067)LF140$1,200.00$586.90$600.00$593.00$839.00$750.00$599.00
35Concrete box culvert (8 FT X 4 FT)(extend) (462-7076)LF106$1,500.00$784.10$860.00$886.00$1,258.00$950.00$900.00
36RC pipe (CL III)(24 in) (464-7005)LF2,778$125.00$85.80$80.00$92.00$127.00$100.00$105.00
37RC pipe (CL III)(30 in) (464-7007)LF49$135.00$141.10$225.00$151.00$488.00$150.00$210.00
38RC pipe (CL III)(42 in) (464-7010)LF152$215.00$182.90$240.00$282.00$300.00$200.00$221.00
39RC pipe (CL III)(54 in) (464-7012)LF4$450.00$645.30$1,000.00$814.00$5,365.00$1,000.00$1,017.00
40Inlet (complete)(curb)(type C)(none)(hou) (465-7305)EACH25$6,000.00$4,952.60$7,500.00$7,166.00$6,271.00$10,000$7,830.00
41Inlet (complete)(curb)(type C)(right)(hou) (465-7307)EACH1$7,500.00$5,560.80$10,000$9,219.00$7,989.00$11,000$9,425.00
42Inlet (complete)(type aad)(hou) (465-7315)EACH6$9,000.00$5,736.20$9,500.00$9,379.00$8,125.00$10,000$9,750.00
43Inlet (complete)(type AZ)(hou) (465-7316)EACH1$8,500.00$5,057.70$3,000.00$7,846.00$6,869.00$9,500.00$8,375.00
44Manh (complete)(type A)(hou) (465-7320)EACH4$8,000.00$5,941.90$7,700.00$6,939.00$5,131.00$10,000$6,885.00
45JCT box (complete)(special) (465-7332)EACH1$50,000$33,001$50,000$25,746$30,837$50,000$31,450
46Wingwall (SW - 0) (HW=5 FT) (466-7204)EACH2$7,000.00$17,723$18,000$34,407$25,727$20,000$10,000
47Set (type I)(S= 6 FT)(HW= 5 FT)(4:1)(C) (467-7133)EACH4$14,000$15,498$13,000$12,950$12,581$15,000$12,850
48Set (type I)(S= 6 FT)(HW= 5 FT)(6:1)(P) (467-7135)EACH10$15,000$17,823$18,000$17,230$16,180$20,000$16,800
49Set (type I)(S= 8 FT)(HW= 5 FT)(4:1)(C) (467-7184)EACH3$30,000$19,613$18,000$15,658$14,032$25,000$14,450
50Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326)EACH13$1,500.00$2,028.90$1,800.00$1,754.00$3,217.00$3,000.00$1,600.00
51Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346)EACH1$2,300.00$3,035.80$2,800.00$2,473.00$3,776.00$3,500.00$2,150.00
52Set (type II) (42 in) (RCP) (6: 1) (P) (467-7380)EACH2$7,000.00$12,019$11,000$12,539$12,206$15,000$11,400
53Removing structure (inlet) (496-7002)EACH2$850.00$520.20$350.00$652.00$1,159.00$500.00$1,155.00
54Removing structure (set) (496-7004)EACH12$600.00$520.20$700.00$652.00$2,590.00$500.00$900.00
55Removing structure (headwall) (496-7006)EACH2$2,500.00$1,184.50$1,600.00$1,899.00$10,360$1,000.00$2,065.00
56Removing structure (pipe) (496-7007)LF152$35.00$24.70$30.00$33.00$159.00$50.00$50.00
57Removing structure (box culvert) (496-7008)LF132$85.00$49.40$75.00$98.00$130.00$100.00$47.00
58Remove STR (rail) (496-7017)LF22$25.00$24.70$30.00$44.00$236.85$200.00$57.00
59Mobilization (500-7001)LS1$794,000$640,000$780,000$218,022$800,000$830,000$514,000
60Barricades, signs and traffic handling (502-7001)MO12$8,500.00$1,759.60$7,000.00$3,484.00$10,076$5,500.00$3,750.00
61Portable changeable message sign (503-7001)DAY12$130.00$154.50$200.00$321.00$238.00$120.00$190.00
62TMA (stationary) (505-7001)DAY24$275.00$360.50$250.00$391.72$315.00$250.00$380.00
63TMA (mobile operation) (505-7002)HR120$50.00$103.00$80.00$116.00$78.00$105.00$75.00
64Rock filter dams (install) (type 2) (506-7002)LF249$50.00$82.40$35.00$45.00$38.88$35.26$41.00
65Rock filter dams (remove) (506-7011)LF249$15.00$20.60$9.00$11.00$9.86$8.94$10.00
66Construction exits (install) (type 1) (506-7020)SY156$40.00$28.80$35.00$43.00$37.64$34.14$40.00
67Construction exits (remove) (506-7024)SY156$15.00$10.30$10.00$12.00$10.23$9.27$10.00
68Temporary sediment control fence (install) (506-7039)LF6,257$4.00$1.90$3.50$4.00$3.61$5.00$3.85
69Temporary sediment control fence (remove) (506-7041)LF6,257$1.00$0.60$0.80$1.00$0.85$0.77$0.90
70Biodegradable erosion control logs (install) (8") (506-7043)LF285$5.00$5.20$5.00$6.00$5.18$4.70$5.50
71Biodegradable erosion control logs (install) (12") (506-7044)LF15$7.00$6.20$6.00$7.00$6.07$5.46$6.50
72Biodegradable erosion control logs (remove) (506-7046)LF300$2.00$2.10$0.80$1.00$0.89$0.81$0.95
73Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009)LF1,020$70.00$11.40$38.00$90.00$40.00$75.00$93.00
74Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010)LF60$110.00$11.40$85.00$91.00$71.00$120.00$76.00
75Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033)LF540$10.00$12.00$15.00$13.00$35.00$5.00$19.00
76Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034)LF40$12.00$12.00$14.00$15.00$55.00$5.00$19.00
77Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057)LF1,020$30.50$12.30$12.00$22.00$31.00$12.00$17.00
78Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058)LF60$29.00$12.30$10.00$22.00$48.00$15.00$17.00
79Concrete curb (mono) (type II) (529-7007)LF10,466$15.00$3.80$6.00$6.11$9.27$3.44$8.30
80Driveways (concrete) (530-7006)SY327$100.00$78.30$105.00$115.00$200.00$78.94$140.00
81Curb ramps (type 1) (531-7005)EACH1$4,000.00$1,645.40$2,800.00$2,145.00$20,453$1,890.70$3,500.00
82Fixed bollard (531-7027)EACH8$1,200.00$292.30$400.00$513.00$372.00$798.18$1,200.00
83Metal beam guard fence trans (thrie-beam) (540-7005)EACH1$2,400.00$2,595.60$2,500.00$3,776.00$1,874.00$2,520.00$2,950.00
84Guardrail end treatment (install) (544-7001)EACH1$3,200.00$3,553.50$3,500.00$5,169.00$3,816.00$3,450.00$4,000.00
85Conduit (PVC) (schedule 80) (3") (618-7060)LF500$22.00$25.00$25.00$21.00$17.39$16.02$17.00
86Conduit (PVC) (schedule 80) (3") (bore) (618-7061)LF149$32.00$36.50$35.00$28.00$23.30$21.47$25.85
87Conduit (prepare) (618-7090)LF2,885$1.50$3.40$3.50$4.00$3.08$2.84$3.50
88Electrical conductor (no.6) bare (620-7009)LF1,320$2.00$2.10$2.25$3.00$2.69$2.48$2.35
89Electrical conductor (no.4) bare (620-7011)LF985$2.50$3.60$4.00$4.00$3.78$3.45$3.50
90Electrical conductor (no.4) insulated (620-7012)LF1,970$4.00$4.00$4.00$5.00$4.05$3.73$3.50
91Tray cable (4 conductor) (12 AWG) (621-7006)LF1,560$3.50$3.40$4.00$5.00$4.24$3.91$2.35
92ITS GND box type 1 (362422)W/apron (623-7030)EACH3$4,000.00$6,810.10$7,500.00$7,748.00$6,552.00$6,037.17$2,150.00
93Ground box type D (162922)W/apron (624-7008)EACH1$1,500.00$1,876.60$2,000.00$1,509.00$1,276.00$1,175.53$2,550.00
94Remove ground box (624-7013)EACH2$200.00$2,164.50$2,250.00$335.00$284.00$261.32$965.00
95Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH6$550.00$667.70$825.00$1,502.00$742.00$680.00$800.00
96Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH8$750.00$921.60$1,100.00$1,403.00$997.00$920.00$1,080.00
97Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH1$1,000.00$874.50$1,400.00$1,645.00$1,169.00$1,195.00$1,400.00
98Remove SM RD SN sup&AM (644-7073)EACH5$95.00$108.20$130.00$199.00$141.00$110.00$130.00
99Work zone pavement marking removing (W)6"(broken) (662-7065)LF147$2.75$2.10$1.50$2.00$1.47$2.00$1.50
100Work zone pavement marking removing (W)6"(solid) (662-7068)LF1,267$1.50$1.00$1.50$2.00$1.47$2.00$1.50
101Work zone pavement marking removing (W)8"(solid) (662-7072)LF688$2.00$2.10$3.00$4.00$2.93$3.50$3.20
102Work zone pavement marking removing (W)(arrow) (662-7082)EACH3$200.00$206.00$220.00$298.00$212.00$245.00$230.00
103Work zone pavement marking removing (W)(double arrow) (662-7083)EACH1$300.00$360.50$250.00$344.00$244.00$315.00$260.00
104Work zone pavement marking removing (W)(TPL arrow) (662-7090)EACH1$250.00$463.50$310.00$420.00$299.00$385.00$320.00
105Work zone pavement marking removing (Y)6"(solid) (662-7100)LF1,606$1.50$1.00$2.50$2.00$1.47$2.00$1.60
106Reflectorized pavement marking type III (W)(6")(solid) (666-7236)LF320$1.25$2.10$2.00$3.00$1.90$1.50$2.00
107Reflectorized pavement marking type III (W)(6")(broken) (666-7237)LF1,340$1.25$2.10$2.00$3.00$1.90$1.50$2.00
108Reflectorized pavement marking type III (W)(8")(solid) (666-7239)LF2,684$1.75$2.10$2.50$3.00$2.44$2.00$2.75
109Reflectorized pavement marking type III (W)(12")(solid) (666-7242)LF244$7.00$5.20$4.00$5.00$3.80$5.00$4.10
110Reflectorized pavement marking type III (W)(24")(solid) (666-7244)LF58$11.00$15.50$14.00$19.00$13.57$10.00$14.50
111Reflectorized pavement marking type III (Y)(6")(solid) (666-7248)LF821$1.25$2.10$2.00$3.00$1.90$1.50$2.00
112Reflectorized pavement marking type III (W)(arrow) (666-7254)EACH8$425.00$257.50$350.00$497.00$353.00$300.00$380.00
113Reflectorized pavement marking type III (W)(word) (666-7257)EACH6$425.00$257.50$400.00$542.00$385.00$350.00$420.00
114Reflectorized pavement marking type III (BLK)(6")(shadow) (666-7262)LF1,340$1.00$2.10$2.00$3.00$1.90$2.00$2.00
115Reflectorized pavement marker type II-C-R (672-7006)EACH194$7.00$7.20$7.00$9.00$6.51$6.00$7.00
116Eliminating existing PM & markers (6") (677-7002)LF3,019$0.60$0.60$0.70$1.00$0.67$0.50$0.75
117Eliminating existing PM & markers (8") (677-7004)LF688$1.00$0.70$1.00$1.00$0.96$0.75$1.00
118Pavement surface preparation for marking (6") (678-7002)LF3,821$0.10$0.10$0.07$0.09$0.07$0.05$0.05
119Pavement surface preparation for marking (8") (678-7004)LF2,684$0.10$0.10$0.09$0.12$0.09$0.10$0.10
120Pavement surface preparation for marking (12") (678-7006)LF244$0.25$0.20$0.14$0.19$0.13$0.50$0.15
121Pavement surface preparation for marking (24") (678-7008)LF58$1.00$0.40$0.25$0.37$0.26$1.00$0.30
122Pavement surface preparation for marking (arrow) (678-7009)EACH8$15.00$5.20$5.50$8.00$5.43$10.00$6.00
123Pavement surface preparation for marking (word) (678-7016)EACH6$15.00$5.20$5.50$8.00$5.43$10.00$6.00
124Pedestrian signal section (LED)(countdown) (682-7018)EACH2$800.00$1,125.80$1,200.00$844.00$713.00$657.41$975.00
125Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007)LF2,800$2.00$2.00$2.25$2.00$1.80$1.66$3.50
126Traffic signal CBL (type A)(12 AWG)(4 conductor) (684-7009)LF3,235$2.50$3.10$3.50$3.00$2.69$2.48$3.50
127Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012)LF2,075$3.25$4.50$5.00$5.00$3.99$3.68$6.00
128Remove traffic signal CBL (684-7085)LF13,945$2.50$0.40$0.50$1.00$1.25$1.15$1.20
129Pedestrian pole assembly (687-7001)EACH1$3,000.00$4,716.20$5,000.00$3,754.00$3,175.00$2,925.36$5,350.00
130Remove pedestrian pole assembly (687-7005)EACH1$325.00$835.60$900.00$148.00$125.00$115.05$1,150.00
131Pedestrian detect push button (APS) (688-7001)EACH2$1,000.00$1,340.90$1,400.00$1,109.00$938.00$864.46$1,300.00
132VIVDS cabling (install only) (6006-7012)LF1,550$2.75$0.90$1.00$1.00$1.25$1.15$4.70
133VIVDS cabling (remove) (6006-7020)LF1,550$0.50$0.90$1.00$1.00$1.25$1.15$2.35
134RVDS (advance det)(install only) (6008-7005)EACH2$1,000.00$3,000.30$3,200.00$295.00$250.00$230.12$2,100.00
135Remove RVDS (6008-7008)EACH2$300.00$763.30$800.00$295.00$250.00$230.12$230.00
136Ground box (prepare) (6013-7006)EACH3$750.00$1,024.30$1,100.00$419.00$355.00$326.67$830.00
137Fiber optic CBL (single-mode)(12 fiber) (6027-7001)LF815$3.00$4.90$5.00$6.00$5.30$4.89$11.75
138Lightning protection system (6085-7001)EACH1$12,000$20,425$20,000$14,871$12,576$11,588$14,000
TxDOT contract A00186223: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of October 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy