Icon GC, LLC: TxDOT bid record

Icon GC, LLC submitted 14 bids on Texas DOT contracts in the data, from 07 MAR 2023 to 01 JUL 2026, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +22% above the low bid.

Owner
Texas DOT
Low bid volume
$0
Latest bid
01 JUL 2026
Data through
19 NOV 2026
14Bids
0Low bids
0Win rate, percent
+22%Median gap to the low bid when not low, 14 bids

By year

YearBidsLow bidsWin rate
2023300%
2024500%
2025200%
2026400%
Icon GC, LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Houston District1000%
Beaumont District300%
Bryan District100%
Icon GC, LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Construction exits (install) (type 1)506-7020SY53 (60%)$10.00$30.00
Vegetative watering168-7001TGL53 (60%)$12.50$37.73
Barricades, signs and traffic handling502-7001MO142 (14%)$4,924.35$5,000.00
Temporary sediment control fence (remove)506-7041LF92 (22%)$1.11$1.00
Riprap (mow strip)(4 in)432-7013CY82 (25%)$848.90$643.00
Construction exits (remove)506-7024SY72 (29%)$10.00$10.00
Excavation (roadway)110-7001CY62 (33%)$19.50$20.00
Biodegradable erosion control logs (install) (12")506-7044LF62 (33%)$7.00$6.00
RC pipe (CL III)(24 in)464-7005LF91 (11%)$132.00$108.13
Temporary sediment control fence (install)506-7039LF81 (13%)$4.20$4.00
Reflectorized pavement marker type II-A-A672-7004EACH61 (17%)$7.75$5.00
Driveways (concrete)530-7006SY61 (17%)$110.16$110.00
Icon GC, LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Icon GC, LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
01 JUL 2026A00190685Houston DistrictConstruct Frontage Roads, SH 99 (Cinco Ranch Blvd to Bay Hill Blvd)9 of 11$24,432,000+25%
06 MAY 2026A00209252Beaumont DistrictRegional Goods Movement Program, SH 146 (AT IH 10 to .)5 of 6$4,710,000+8.0%
07 JAN 2026A00205023Houston DistrictInstall/Upgrade Drainage Structure(S), FM 1314 (Cooper Rose Way to SH 242)12 of 12$3,163,900+43%
06 JAN 2026A00188847Houston DistrictSurfacing/Roadway Restoration, SH 225 (SL 8 to Miller Cut Off Rd)5 of 6$28,994,626+31%
08 OCT 2025A00186223Houston DistrictConstruct Frontage Roads, SH 99 (Longenbaugh Road to FM 529)3 of 10$8,156,594+25%
07 AUG 2025A00205904Houston DistrictBicycle And Pedestrian Improvements, SH 3 (FM 1765 to FM 519)5 of 10$2,355,238+19%
03 DEC 2024A00198078Houston DistrictTransportation Non-Roadway, US 290 (At FM 2920 to .)6 of 6$1,805,000+18%
05 APR 202404243210Houston DistrictSH 242 Install/upgrade drainage structure(s) from NEEDHAM DRIVE to IH 6911 of 11$13,400,000+63%
05 APR 202404243212Beaumont DistrictFM 160 Hazard elimination & safety from FM 787, SOUTH to US 904 of 4$5,270,000+32%
02 FEB 202402243226Houston DistrictIH 45 Highway improvement from N OF FM 830 to S OF FM 10973 of 9$3,275,000+3.0%
02 FEB 202402243231Bryan DistrictUS 190 Intersection improvements with left turn lane from AT FM 22963 of 8$1,093,000+5.0%
01 NOV 202311233014Houston DistrictVA Hike and/or bike from ON SH 96, SH 146, FM 270 & FM 20943 of 4$7,650,000+7.0%
04 MAY 202305233029Houston DistrictSH 288 Construct frontage roads from AIRPORT BLVD to SIMS BAYOU3 of 6$3,480,000+4.0%
07 MAR 202303233037Beaumont DistrictCS Bridge replacement from AT DRAINAGE DITCH to STR#201810C018350035 of 5$774,158+29%
Icon GC, LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy