Above All Construction submitted 21 bids on Texas DOT contracts in the data, from 09 SEP 2021 to 01 FEB 2024, and was the low bidder on 6 of them (29%). When it was not low, its total sat a median +25% above the low bid.

Owner
Texas DOT
Low bid volume
$1,448,958
Latest bid
01 FEB 2024
Data through
19 NOV 2026
21Bids
6Low bids
29Win rate, percent
+25%Median gap to the low bid when not low, 15 bids

By year

YearBidsLow bidsWin rate
20218113%
20224375%
20238225%
2024100%
Above All Construction, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Odessa District6233%
Yoakum District500%
El Paso District3267%
Houston District3133%
Bryan District200%
Lufkin District100%
San Antonio District11100%
Above All Construction, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Remove gdrail end TRT / repl with SGT770-6027EACH95 (56%)$3,500.00$3,500.00
Mobilization (emergency)500-7033EACH65 (83%)$400.00$1,000.00
Mobilization (callout)500-7002EACH55 (100%)$200.00$688.00
Janitorial services - strip/wax floors7158-6003CYC55 (100%)$100.00$660.00
Repl single gdrail terminal impact head770-7015EACH64 (67%)$1,000.00$1,000.00
Rem & reset SGT impact head770-6029EACH64 (67%)$125.00$150.00
Janitorial services - window washing7158-6004CYC54 (80%)$10.00$75.00
Rem / repl timber/steel post W/O concrete FND770-6010EACH73 (43%)$50.00$50.00
Replace single gdrail terminal rail770-7016LF63 (50%)$33.00$35.00
Install delineator assembly (D-SW)SZ 1(BRF)GF2658-7018EACH53 (60%)$25.00$32.50
Install delineator assembly (D-SY)SZ 1(BRF)GF2658-7036EACH53 (60%)$25.00$31.50
Janitorial services - weekly7158-6001CYC53 (60%)$50.00$118.94
Above All Construction, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Ross Sa Enterprise LLC63 of 6
Ace Global55 of 5
RWCS Janitorial LLC55 of 5
Alpha and Omega Cleaning Services, LLC52 of 5
Maxpro Enterprise LLC51 of 5
Roy Jorgensen Associates, Inc.50 of 5
Garret Shields Infrastructure32 of 3
Isi Contracting, Inc.31 of 3
E.V.G. Enterprise32 of 3
Lukeda Sandblasting & Services LLC21 of 2
Above All Construction, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
01 FEB 202402244015Houston DistrictIH0045 Metal beam guard fence repair from VARIOUS HIGHWAYS IN MONTGOMERY COUN to VARIOUS HIGHWAYS IN MONTGOMERY COUN3 of 5$1,487,464+11%
15 NOV 202311231501San Antonio DistrictUS0090 Picnic area maintenance from US 90 PICNIC AREA to SH 173 PICNIC AREA1 of 3$62,427Low, 46% under the second
04 MAY 202305234019Houston DistrictIH0045 Metal beam guard fence repair from VARIOUS HIGHWAYS IN MONTGOMERY COUN to VARIOUS HIGHWAYS IN MONTGOMERY COUN1 of 4$555,451Low, 9.0% under the second
22 MAR 202303231103Lufkin DistrictUS0059 Metal beam guard fence repair from POLK COUNTY to VARIOUS LOCATIONS2 of 3$304,050+40%
08 MAR 202303234219Houston DistrictSH0288 Metal beam guard fence repair from VARIOUS LOCATIONS IN BRAZORIA COUNT to VARIOUS LOCATIONS IN BRAZORIA COUNT2 of 4$1,047,125+23%
08 MAR 202303234223Odessa DistrictIH0020 Metal beam guard fence repair from VARIOUS to VARIOUS3 of 4$483,510+27%
08 MAR 202303234225Odessa DistrictIH0010 Metal beam guard fence repair from VARIOUS to VARIOUS2 of 3$424,500+14%
08 MAR 202303234226Odessa DistrictIH0020 Metal beam guard fence repair from VARIOUS to VARIOUS3 of 4$326,260+72%
01 FEB 202302234037Bryan DistrictSH0030 Metal beam guard fence repair from VARIOUS to VARIOUS2 of 4$658,600+20%
02 NOV 202211224008Bryan DistrictIH0045 Metal beam guard fence repair from VARIOUS to VARIOUS4 of 6$504,925+32%
08 SEP 202209224214Odessa DistrictIH0020 Cable median barrier system repair from VARIOUS to VARIOUS1 of 5$355,600Low, 3.0% under the second
08 SEP 202209224215Odessa DistrictIH0020 Cable median barrier system repair from VARIOUS to VARIOUS1 of 5$356,600Low, 2.0% under the second
01 SEP 202209222402El Paso DistrictIH0010 Picnic area maintenance from VARIOUS LOCATIONS to VARIOUS LOCATIONS1 of 2$64,100Low, 36% under the second
12 OCT 202110210603Odessa DistrictSH0176 Landscape maintenance from VARIOUS to VARIOUS2 of 2$80,000+56%
30 SEP 202109212409El Paso DistrictUS0090 Surface finishes - painting from VARIOUS LOCATIONS to VARIOUS LOCATIONS2 of 3$109,500+39%
23 SEP 202109212408El Paso DistrictUS0062 Picnic area maintenance from VARIOUS LOCATIONS to VARIOUS LOCATIONS1 of 1$54,780Low
09 SEP 202109211301Yoakum DistrictBS0035H Janitorial maintenance from MATAGORDA COUNTY3 of 5$13,160+20%
09 SEP 202109211302Yoakum DistrictUA0090 Janitorial maintenance from GONZALES COUNTY4 of 5$9,420+20%
09 SEP 202109211303Yoakum DistrictUS0183 Janitorial maintenance from DE WITT COUNTY3 of 5$12,340+13%
09 SEP 202109211304Yoakum DistrictSH0071 Janitorial maintenance from FAYETTE COUNTY4 of 5$15,810+25%
09 SEP 202109211305Yoakum DistrictUA0090 Janitorial maintenance from LAVACA COUNTY4 of 5$22,860+51%
Above All Construction: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy