TxDOT letting results, September 1, 2022
5 contracts let by Texas DOT on September 1, 2022, $1,171,274 in low bids, a median of 1 bidders per contract. On the 5 with an engineer's estimate, the low bid came in under it 1 times; median low bid +18% against the estimate.
- Owner
- Texas DOT
- Contracts
- 5
- Low bids, total
- $1,171,274
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 09222203 | IH0035 Debris removal from VARIOUS to VARIOUS | Laredo District | 2 | Big Tex Contractors, LLC | $354,112 | $448,637 | +27% | +18% | TxDOT |
| 09222201 | IH0035 Limestone rock asphalt from VARIOUS to VARIOUS | Laredo District | 1 | Vulcan Construction Materials, LLC | $353,680 | +18% | TxDOT | ||
| 09222202 | US0083 Limestone rock asphalt from VARIOUS to VARIOUS | Laredo District | 1 | Vulcan Construction Materials, LLC | $247,632 | -7.0% | TxDOT | ||
| 09222401 | SH0118 Asphaltic patching material from VARIOUS LOCATIONS to VARIOUS LOCATIONS | El Paso District | 1 | Touchstone Resources, LLC | $151,750 | +42% | TxDOT | ||
| 09222402 | IH0010 Picnic area maintenance from VARIOUS LOCATIONS to VARIOUS LOCATIONS | El Paso District | 2 | Above All Construction | $64,100 | $87,377 | +36% | +7.0% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.