TxDOT contract A00187792 bid tabulation

Rehabilitate Existing Roadway, FM 981 (SH 78 to FM 1562). Let by Texas DOT on August 6, 2026, Collin, Dallas District. 7 bids received; low bid $18,829,388 by D. L. Lennon Incorporated - Contractor, +2.7% against the engineer's estimate of $18,327,262.

Owner
Texas DOT
Letting
06 AUG 2026
Pay items
129
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1D. L. Lennon Incorporated - Contractor$18,829,388Low+3.0%
2A. K. Gillis & Sons, LLC$19,350,920+3.0%+6.0%
3Overland Corporation$19,980,076+6.0%+9.0%
4Jagoe-Public Company$22,551,810+20%+23%
5Austin Bridge & Road Services, LP$22,740,089+21%+24%
6Sterling Delaware Holding Company, Inc.$22,765,120+21%+24%
7Ed Bell Construction Company$24,424,241+30%+33%
TxDOT contract A00187792: bids by rank

Engineer's estimate: $18,327,262.

Bid tabulation

LinePay itemUnitQuantityEstimate1. D. L. Lennon Incorporated - Contractor2. A. K. Gillis & Sons, LLC3. Overland Corporation4. Jagoe-Public Company5. Austin Bridge & Road Services, LP6. Sterling Delaware Holding Company, Inc.
1Preparing row (100-7002)STA533.33$600.00$352.43$484.43$2,500.00$500.00$4,263.79$2,156.00
2Removing concrete (riprap) (104-7007)CY0.90$1,500.00$50.00$12.00$100.00$1,100.86$475.73$250.00
3Removing concrete (driveways) (104-7011)SY183$50.00$12.00$12.00$20.67$20.00$26.83$30.00
4Remove (4"-8") TRT/untrt base & asphalt pavement (105-7004)SY3,838$10.00$13.00$6.84$13.00$10.00$3.97$19.51
5Remove (8"-12") TRT/untrt base & asphalt pavement (105-7008)SY2,254$35.00$16.00$8.79$10.00$10.00$8.80$6.69
6Remove (12"-16") TRT/untrt base & asphalt pavement (105-7012)SY9,683$15.00$19.00$14.82$20.00$6.00$11.04$9.37
7Remove (7") TRT/untrt base & asphalt pavement (105-7027)SY267$35.00$9.87$20.00$13.00$32.94$6.77
8Excavation (roadway) (110-7001)CY27,095$14.00$17.50$17.50$20.00$35.00$11.06$6.25
9Embankment (final)(DC)(type C) (132-7006)CY15,557$21.00$17.50$17.50$14.00$38.00$8.85$80.30
10Embankment (final)(DC)(type C2) (132-7010)CY891$40.00$17.50$50.00$60.00$24.10$8.00
11Backfill (type A or B) (134-7004)STA533.33$175.00$335.00$325.00$304.23$250.00$290.53$16.60
12Blading (150-7001)STA533.33$275.00$300.00$325.00$107.52$110.00$363.87$15.00
13Drill seed (permanent_rural_clay) (164-7010)SY346,694$0.25$0.15$0.15$0.61$0.15$0.15$0.15
14Drill seed (temporary_warm_cool) (164-7015)SY346,694$0.20$0.14$0.14$0.14$0.14$0.14$0.15
15Vegetative watering (168-7001)TGL103,159$0.50$0.01$0.10$0.02$0.10$0.01$0.01
16FL BS (compacted in place)(type D GR 1-2) (12") (247-7125)SY170,844$22.00$33.50$33.43$27.49$30.00$30.64$32.00
17FL BS (roadway del) (type D GR 1-2) (247-7209)TON23,252$35.00$47.00$57.00$14.68$40.00$42.06$49.00
18Rework BS metal (type C)(12")(ord comp) (251-7055)SY136,225$2.50$3.00$2.50$1.76$2.25$3.60$3.30
19Cement (275-7001)TON911$225.00$223.00$213.00$210.91$230.00$301.16$216.00
20Cement TRT (existing material)(6") (275-7002)SY5,971$5.00$2.75$3.00$3.20$3.00$4.75$2.60
21Cement TRT (existing material & new base)(6") (275-7006)SY144,576$2.00$2.75$2.50$3.17$3.00$5.87$2.90
22Cement TRT (existing material & new base)(10") (275-7008)SY4,463$5.00$8.00$3.00$4.27$4.00$5.30$3.00
23Cement TRT (new base)(10") (275-7012)SY3,900$5.00$8.00$3.00$4.89$4.00$6.52$3.40
24Prime coat(MC-30 or AE-P) (310-7013)GAL51,390$5.25$6.27$6.26$5.36$1.50$4.14$4.55
25Asphalt (CRS-2P) (316-7012)GAL29,128$5.00$5.31$5.31$4.00$4.20$4.00$4.66
26Asphalt (RC-250) (316-7016)GAL23,302$10.00$6.05$6.14$6.00$6.29$6.00$5.91
27Asphalt (AC-15P, AC-20-5TR or AC-20XP) (316-7071)GAL23,302$3.00$4.98$4.98$6.00$6.29$6.00$4.52
28Aggregate (type-B or L, GR-3)(sac-B) (316-7244)CY1,131$150.00$98.40$160.88$250.00$262.22$250.00$295.65
29Aggregate (type-B or L, GR-5) (316-7251)CY480$125.00$90.50$148.68$250.00$262.22$250.00$324.09
30SP mixes SP-B PG64-22 (344-7001)TON249$150.00$156.00$259.29$150.00$140.00$152.51$176.82
31SP mixes SP-C sac-B PG64-22 (344-7011)TON18,812$120.00$139.00$124.70$120.00$120.00$128.11$125.62
32Tack coat (344-7077)GAL1,495$8.00$7.50$7.69$5.00$2.75$4.25$1.00
33Flexible pavement structure repair(12") (351-7011)SY284$35.00$110.84$214.74$165.00$130.00$169.71$200.00
34Planing asphalt concrete pavement(2") (354-7051)SY12,979$4.00$2.40$2.36$1.94$4.50$3.49$2.97
35Planing asphalt concrete pavement(5") (354-7054)SY129,487$6.00$4.25$3.35$2.10$6.00$4.21$7.08
36Struct excavation (400-7001)CY26$75.00$35.00$100.00$57.50$120.00$219.25$160.00
37Cut & restoring pavement (400-7006)SY451$164.00$36.50$100.00$257.69$82.62$40.01$115.00
38Cem stabil BKFL (400-7010)CY789$200.00$222.00$250.00$185.00$203.96$243.36$210.00
39Flowable backfill (401-7001)CY127$650.00$250.00$275.00$350.00$268.43$140.80$200.00
40Trench excavation protection (402-7001)LF703$20.00$5.00$15.00$12.00$8.00$5.48$1.00
41Temporary special shoring (403-7001)SF953$125.00$50.00$18.00$35.00$43.00$54.81$1.00
42Riprap (concrete)(4 in) (432-7001)CY90$2,000.00$610.50$700.00$731.56$850.00$712.97$871.00
43Riprap (concrete)(6 in) (432-7003)CY1.40$1,500.00$700.00$800.00$703.54$815.00$767.36$670.00
44Riprap (stone common)(dry)(12 in) (432-7031)CY3,735$180.00$155.50$223.20$194.97$300.00$170.46$156.00
45Riprap (stone protection)(18 in) (432-7043)CY148$300.00$155.50$248.20$233.40$320.00$170.46$170.00
46Gabions (galvanized) (459-7001)CY25$500.00$400.00$375.00$798.76$400.00$438.49$592.00
47Gabion mattresses (galvanized)(18 in) (459-7008)SY47$250.00$300.00$674.21$309.86$270.00$328.87$300.00
48Concrete box culvert (3 FT X 3 FT) (462-7002)LF60$500.00$330.00$400.00$750.00$320.00$361.75$500.00
49Concrete box culvert (5 FT X 5 FT) (462-7009)LF56$575.00$625.00$950.00$700.00$630.33$990.00
50Concrete box culvert (5 FT X 5 FT)(extend) (462-7064)LF18$850.00$950.00$850.00$900.00$931.79$1,073.00
51RC pipe (CL III)(18 in) (464-7003)LF2,747$70.00$42.50$50.00$60.00$60.00$45.86$84.00
52RC pipe (CL III)(24 in) (464-7005)LF296$90.00$75.00$80.00$125.00$80.00$82.22$127.00
53RC pipe (CL III)(30 in) (464-7007)LF748$120.00$108.00$115.00$190.00$130.00$118.39$137.00
54RC pipe (CL III)(36 in) (464-7009)LF422$200.00$142.50$170.00$225.00$170.00$156.21$230.00
55RC pipe (CL III)(42 in) (464-7010)LF54$235.00$220.00$275.00$240.00$257.61$265.00
56RC pipe (CL III)(48 in) (464-7011)LF164$400.00$235.00$250.00$325.00$270.00$257.61$390.82
57Headwall (CH - PW - 0) (diameter= 24 in) (466-7101)EACH4$5,900.00$7,000.00$3,500.00$3,000.00$6,467.73$6,500.00
58Headwall (CH - PW - 0) (diameter= 30 in) (466-7103)EACH14$8,000.00$7,200.00$7,500.00$4,500.00$9,000.00$7,892.83$6,700.00
59Headwall (CH - PW - 0) (diameter= 36 in) (466-7105)EACH12$1,000.00$8,000.00$9,500.00$5,500.00$14,000$8,769.81$8,570.00
60Headwall (CH - PW - 0) (diameter= 42 in) (466-7106)EACH2$10,500$10,500$7,000.00$17,000$11,510$10,700
61Headwall (CH - PW - 0) (diameter= 48 in) (466-7107)EACH2$10,000$12,000$11,000$8,500.00$23,000$13,155$14,300
62Headwall (CH - PW - S) (diameter= 30 in) (466-7118)EACH2$8,500.00$7,200.00$8,000.00$5,000.00$11,000$7,892.83$8,800.00
63Headwall (CH - PW - S) (diameter= 48 in) (466-7122)EACH2$13,000$12,000$12,000$9,500.00$26,000$13,155$13,000
64Wingwall (PW - 1) (HW=6 FT) (466-7176)EACH1$19,000$17,000$16,000$8,500.00$34,000$18,636$15,000
65Wingwall (PW - 1) (HW=7 FT) (466-7177)EACH3$10,000$21,000$18,000$18,000$45,000$23,021$28,000
66Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH194$1,150.00$698.00$800.00$950.00$2,000.00$765.17$1,126.00
67Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH10$1,450.00$1,450.00$1,300.00$2,500.00$2,200.00$1,589.53$1,829.00
68Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348)EACH7$2,580.00$2,450.00$2,500.00$3,500.00$4,000.00$2,685.75$2,753.00
69Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368)EACH2$6,500.00$6,900.00$7,500.00$5,000.00$4,100.00$7,563.96$5,713.00
70Set (type II) (48 in) (RCP) (6: 1) (P) (467-7392)EACH1$13,500$14,000$6,500.00$6,000.00$14,799$9,454.00
71Clean existing culverts (480-7001)EACH3$13,000$800.00$1,200.00$1,500.00$2,900.00$876.98$1,453.00
72Removing structure (inlet) (496-7002)EACH4$3,300.00$500.00$500.00$750.00$2,500.00$548.11$784.00
73Removing structure (set) (496-7004)EACH81$350.00$50.00$100.00$550.00$170.00$54.81$214.00
74Removing structure (wingwall) (496-7005)EACH2$800.00$1,000.00$1,200.00$3,400.00$876.98$1,844.00
75Removing structure (headwall) (496-7006)EACH6$164.00$800.00$800.00$1,200.00$7,000.00$876.98$685.00
76Removing structure (pipe) (496-7007)LF3,983$27.00$4.50$8.00$30.00$45.00$4.93$17.50
77Mobilization (500-7001)LS1$1,764,592$470,525$999,805$1,998,000$2,500,000$2,610,000$2,300,000
78Barricades, signs and traffic handling (502-7001)MO18$15,000$12,986$11,750$22,260$61,500$40,140$30,000
79Portable changeable message sign (503-7002)EACH4$15,000$18,000$10,000$9,720.00$17,500$16,238$15,500
80TMA (stationary) (505-7001)DAY358$234.00$150.00$75.00$500.00$280.00$350.00$127.00
81TMA (mobile operation) (505-7002)HR358$156.00$75.00$75.00$0.01$31.00$70.00$67.00
82Rock filter dams (install) (type 3) (506-7003)LF2,240$70.00$65.00$65.00$65.00$70.00$65.00$85.00
83Rock filter dams (remove) (506-7011)LF2,240$12.50$12.00$12.00$12.00$13.00$12.00$10.00
84Construction exits (install) (type 1) (506-7020)SY1,632$34.00$37.00$15.00$37.00$39.00$37.00$34.00
85Construction exits (remove) (506-7024)SY1,632$11.25$10.00$5.00$10.00$11.00$10.00$13.00
86Temporary sediment control fence (install) (506-7039)LF69,695$3.75$3.69$3.69$3.69$4.00$3.69$4.31
87Temporary sediment control fence (remove) (506-7041)LF69,695$1.00$0.90$0.90$0.90$1.00$0.90$1.00
88Biodegradable erosion control logs (install) (12") (506-7044)LF3,223$6.50$6.00$6.00$6.00$6.00$6.00$5.00
89Biodegradable erosion control logs (remove) (506-7046)LF3,223$2.00$1.50$1.50$1.50$1.50$1.50$1.00
90Constructing detours (type 1) (508-7003)SY491$150.00$184.00$100.00$150.00$120.00$116.25$235.00
91Constructing detours (type 2) (508-7004)SY286$160.00$182.00$107.83$75.00$90.00$94.11$150.00
92Constructing detours (type 3) (508-7005)SY349$175.00$272.00$100.00$125.00$210.00$186.44$259.00
93Driveways (concrete) (hes) (530-7007)SY183$275.00$115.00$161.12$192.39$140.00$145.50$85.00
94Driveways (ACP) (530-7010)SY12,406$55.00$67.00$80.42$90.00$60.00$45.77$81.00
95Mill rumble strips (asphalt) (shoulder) (533-7001)LF96,873$0.30$1.15$0.15$0.15$0.15$0.07$0.16
96Mill rumble strips (asphalt) (centerline) (533-7002)LF48,952$0.30$1.15$0.15$0.15$0.23$0.08$0.16
97Mailbox install-S (TWW-post) type 4 (560-7008)EACH55$350.00$270.00$230.00$230.00$250.00$265.00$230.00
98Mailbox install-D (TWW-post) type 4 (560-7009)EACH6$350.00$335.00$250.00$250.00$270.00$275.00$250.00
99Mailbox install-M (TWW-post) type 4 (560-7010)EACH5$650.00$1,200.00$660.00$660.00$700.00$660.00$660.00
100Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH85$740.00$700.00$595.00$595.00$600.00$645.00$595.00
101Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002)EACH12$700.00$780.00$695.00$695.00$700.00$700.00$695.00
102Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH14$850.00$844.00$850.00$850.00$900.00$725.00$850.00
103Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH8$1,050.00$1,052.00$850.00$850.00$900.00$800.00$850.00
104Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH3$1,050.00$1,325.00$950.00$850.00$1,000.00$1,000.00$950.00
105Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034)EACH4$1,325.00$1,602.00$990.00$950.00$1,100.00$1,200.00$990.00
106Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH114$320.00$20.00$30.00$29.00$41.00$22.00$29.00
107Install object marker assembly (OM-2Z)(WFLX)GND (658-7058)EACH5$60.00$60.00$60.00$60.00$75.00$75.00
108Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF105,609$0.30$0.45$0.45$0.45$0.50$0.45$0.25
109Work zone pavement marking non-removing (W)8"(DOT) (662-7010)LF183$1.25$1.00$1.00$1.00$1.00$1.00$0.55
110Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF712$1.00$0.65$0.65$0.65$0.70$0.65$0.45
111Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF144$5.00$4.25$4.25$4.25$4.50$4.25$3.00
112Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF96,891$0.30$0.45$0.45$0.45$0.50$0.45$0.25
113Work zone pavement marking removing (W)6"(solid) (662-7068)LF9,619$1.00$1.25$1.25$0.13$1.25$1.25$0.80
114Work zone pavement marking removing (Y)6"(solid) (662-7100)LF5,155$1.50$1.25$1.25$1.25$1.25$1.25$0.80
115Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH1,218$3.25$3.00$2.45$2.00$2.00$1.00$0.55
116Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF21$1.00$1.00$1.00$1.00$1.00$0.85
117Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF183$0.30$1.00$1.00$1.00$1.00$1.00$1.00
118Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF712$0.30$1.00$1.00$1.00$1.00$1.00$0.88
119Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF368$11.50$6.70$6.70$1.00$7.00$6.70$7.00
120Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH8$200.00$130.00$130.00$130.00$140.00$130.00$155.00
121Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH8$235.00$160.00$160.00$160.00$170.00$160.00$170.00
122Pavement sler 6" (666-7347)LF1,215$5.00$0.20$0.20$0.20$0.21$0.20$0.24
123Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF105,609$0.60$0.50$0.50$0.50$0.50$0.50$0.51
124Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF2,220$5.00$0.55$0.55$0.55$0.60$0.55$0.53
125Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF96,891$0.60$0.50$0.50$0.50$0.50$0.50$0.52
126Reflectorized pavement marker type I-C (672-7002)EACH48$0.60$4.00$4.00$4.00$4.25$4.00$3.79
127Reflectorized pavement marker type II-A-A (672-7004)EACH1,465$5.00$4.00$4.00$4.00$4.25$4.00$3.80
128Eliminating existing PM & markers (4") (677-7001)LF1,215$1.00$1.00$1.00$1.00$1.00$1.00$0.90
129Remove and RE-lay existing stone riprap (4017-7001)CY39$500.00$800.00$400.00$125.00$210.00$300.00$20.00
TxDOT contract A00187792: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of August 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way