Surfacing/Roadway Restoration, FM 1301 (FM 1728 to BRAZORIA C/L). Let by Texas DOT on March 4, 2025, Matagorda, Yoakum District. 6 bids received; low bid $7,126,058 by Clark Construction of Texas, Inc., +2.7% against the engineer's estimate of $6,940,691.
- Owner
- Texas DOT
- Letting
- 04 MAR 2025
- Pay items
- 129
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Clark Construction of Texas, Inc. | $7,126,058 | Low | +3.0% |
| 2 | Cornerstone Paving and Construction, L.L.C. | $7,152,851 | 0.0% | +3.0% |
| 3 | Hunter Industries, LTD. | $7,834,242 | +10% | +13% |
| 4 | CK Newberry, LLC | $8,497,682 | +19% | +22% |
| 5 | Vulcan Materials Asphalt and Construction, LLC | $9,607,385 | +35% | +38% |
| 6 | Sterling Delaware Holding Company, Inc. | $11,247,692 | +58% | +62% |
Engineer's estimate: $6,940,691.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Clark Construction of Texas, Inc. | 2. Cornerstone Paving and Construction, L.L.C. | 3. Hunter Industries, LTD. | 4. CK Newberry, LLC | 5. Vulcan Materials Asphalt and Construction, LLC | 6. Sterling Delaware Holding Company, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 50 | $5,000.00 | $460.00 | $500.00 | $976.80 | $500.00 | $460.00 | $14,566 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 56 | $30.00 | $26.80 | $50.00 | $36.30 | $60.00 | $50.00 | $25.00 |
| 3 | Excavation (roadway) (110-7001) | CY | 9,569 | $15.00 | $13.87 | $16.80 | $18.70 | $18.00 | $52.00 | $35.00 |
| 4 | Embankment (final)(OC)(type C) (132-7005) | CY | 6,540 | $18.00 | $13.86 | $12.15 | $18.70 | $18.00 | $33.00 | $41.00 |
| 5 | Blading (150-7002) | HR | 20 | $120.00 | $150.00 | $150.00 | $88.00 | $150.00 | $140.00 | $245.00 |
| 6 | Broadcast seed (temporary_warm) (164-7005) | SY | 385 | $0.25 | $2.80 | $1.00 | $0.25 | $0.30 | $0.25 | $2.80 |
| 7 | Broadcast seed (temporary_cool) (164-7006) | SY | 385 | $0.25 | $3.40 | $1.00 | $0.25 | $0.30 | $0.25 | $3.40 |
| 8 | Drill seed (permanent_rural_clay) (164-7010) | SY | 65,144 | $0.35 | $0.26 | $0.40 | $0.30 | $0.30 | $0.30 | $0.26 |
| 9 | Drill seed (temporary_warm) (164-7013) | SY | 16,287 | $0.35 | $0.18 | $0.35 | $0.30 | $0.30 | $0.30 | $0.18 |
| 10 | Drill seed (temporary_cool) (164-7014) | SY | 16,287 | $0.35 | $0.22 | $0.35 | $0.25 | $0.30 | $0.25 | $0.22 |
| 11 | Vegetative watering (168-7001) | TGL | 560.30 | $20.00 | $30.00 | $10.00 | $20.90 | $30.00 | $30.00 | $46.00 |
| 12 | FL BS (compacted in place)(tye GR1-2)(final pos) (247-7193) | CY | 27,366 | $84.00 | $112.59 | $121.50 | $113.19 | $125.00 | $137.25 | $110.00 |
| 13 | Lime (com or QK)(slurry) or QK(dry) (260-7001) | TON | 18 | $200.00 | $1,000.00 | $350.00 | $385.00 | $375.00 | $369.60 | $385.00 |
| 14 | Lime TRT (existing material)(8") (260-7007) | SY | 1,500 | $5.00 | $9.63 | $10.00 | $8.80 | $10.00 | $15.00 | $31.00 |
| 15 | Cement (275-7001) | TON | 1,575 | $220.00 | $225.00 | $210.00 | $220.00 | $225.00 | $203.00 | $210.00 |
| 16 | Cement TRT (existing material)(8") (275-7003) | SY | 129,634 | $2.50 | $1.78 | $1.30 | $3.30 | $2.50 | $2.75 | $15.00 |
| 17 | Asphalt (RC-250) (316-7016) | GAL | 23,332 | $4.50 | $3.65 | $5.10 | $4.89 | $4.30 | $4.00 | $6.00 |
| 18 | Aggregate (type-E, GR-5)(sac-B) (316-7194) | CY | 833 | $130.00 | $107.55 | $140.25 | $111.35 | $160.00 | $223.00 | $122.00 |
| 19 | Aggregate (type-PE, GR-3)(sac-B) (316-7229) | CY | 1,372 | $135.00 | $122.26 | $141.00 | $145.16 | $150.00 | $148.00 | $181.00 |
| 20 | Aggregate (type-PE, GR-4)(sac-B) (316-7232) | CY | 898 | $140.00 | $140.23 | $135.00 | $143.80 | $145.00 | $203.00 | $181.00 |
| 21 | Asphalt (AC 20-5TR or AC-20XP or CRS-2P) (316-7264) | GAL | 86,328 | $4.25 | $3.61 | $4.15 | $4.18 | $4.00 | $3.96 | $5.25 |
| 22 | Flexible pavement structure repair(12") (351-7011) | SY | 1,000 | $64.00 | $37.14 | $39.00 | $124.74 | $80.00 | $90.50 | $68.00 |
| 23 | Cut and restore pavement (flex base) (400-7009) | SY | 21 | $26.00 | $44.00 | $50.00 | $54.00 | $300.00 | $50.00 | $190.48 |
| 24 | Cem stabil BKFL (400-7010) | CY | 42 | $220.00 | $140.00 | $250.00 | $270.00 | $275.00 | $250.00 | $476.19 |
| 25 | Temporary special shoring (403-7001) | SF | 180 | $35.00 | $30.00 | $50.00 | $70.20 | $70.00 | $65.00 | $65.00 |
| 26 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 32 | $450.00 | $254.56 | $255.00 | $254.56 | $300.00 | $254.56 | $254.56 |
| 27 | Riprap (concrete)(5 in) (432-7002) | CY | 51.90 | $675.00 | $583.33 | $900.00 | $1,080.01 | $750.00 | $1,000.00 | $1,000.00 |
| 28 | Riprap (mow strip)(5 in) (432-7014) | CY | 59.20 | $500.00 | $551.00 | $900.00 | $1,296.01 | $650.00 | $1,200.00 | $1,400.00 |
| 29 | Riprap (stone protection)(12 in) (432-7041) | CY | 62 | $144.00 | $227.00 | $150.00 | $178.20 | $350.00 | $165.00 | $340.00 |
| 30 | Retrofit rail (type T131RC) (451-7049) | LF | 242.66 | $250.00 | $251.25 | $300.00 | $293.61 | $200.00 | $210.60 | $210.60 |
| 31 | CMP (gal steel 18 in) (460-7003) | LF | 80 | $85.00 | $82.88 | $60.00 | $64.80 | $120.00 | $60.00 | $60.00 |
| 32 | CMP (gal steel 24 in) (460-7005) | LF | 24 | $115.00 | $118.33 | $145.00 | $156.60 | $135.00 | $145.00 | $145.00 |
| 33 | CMP (gal steel 30 in) (460-7007) | LF | 36 | $175.00 | $124.30 | $185.00 | $199.80 | $150.00 | $185.00 | $185.00 |
| 34 | CMP (gal steel 36 in) (460-7009) | LF | 12 | $200.00 | $210.00 | $200.00 | $216.00 | $160.00 | $200.00 | $200.00 |
| 35 | Concrete box culvert (3 FT X 3 FT) (462-7002) | LF | 12 | $330.00 | $811.70 | $700.00 | $756.01 | $975.00 | $700.00 | $1,400.55 |
| 36 | Concrete box culvert (5 FT X 2 FT) (462-7006) | LF | 13 | $550.00 | $1,074.00 | $800.00 | $864.01 | $1,300.00 | $800.00 | $1,939.20 |
| 37 | Concrete box culvert (6 FT X 3 FT) (462-7011) | LF | 10 | $675.00 | $1,211.50 | $825.00 | $891.01 | $1,700.00 | $825.00 | $2,601.40 |
| 38 | Concrete box culvert (6 FT X 4 FT) (462-7012) | LF | 31 | $725.00 | $1,002.00 | $900.00 | $999.01 | $1,725.00 | $925.00 | $2,604.26 |
| 39 | Concrete box culvert (6 FT X 6 FT) (462-7014) | LF | 12 | $800.00 | $1,562.00 | $1,000.00 | $1,080.01 | $2,500.00 | $1,000.00 | $2,771.96 |
| 40 | Concrete box culvert (7 FT X 4 FT) (462-7016) | LF | 8 | $810.00 | $1,476.00 | $1,200.00 | $1,296.01 | $2,500.00 | $1,200.00 | $1,653.29 |
| 41 | RC pipe (CL III)(15 in) (464-7002) | LF | 120 | $95.00 | $152.60 | $60.00 | $64.80 | $130.00 | $60.00 | $60.00 |
| 42 | RC pipe (CL III)(18 in) (464-7003) | LF | 224 | $105.00 | $209.00 | $65.00 | $75.60 | $150.00 | $70.00 | $70.00 |
| 43 | RC pipe (CL III)(24 in) (464-7005) | LF | 148 | $120.00 | $236.75 | $150.00 | $172.80 | $150.00 | $160.00 | $160.00 |
| 44 | RC pipe (CL III)(30 in) (464-7007) | LF | 40 | $155.00 | $284.80 | $225.00 | $243.00 | $350.00 | $225.00 | $225.00 |
| 45 | RC pipe (CL III)(36 in) (464-7009) | LF | 24 | $275.00 | $444.00 | $300.00 | $270.00 | $600.00 | $250.00 | $250.00 |
| 46 | RC pipe (CL III)(48 in) (464-7011) | LF | 44 | $300.00 | $561.60 | $350.00 | $378.00 | $400.00 | $350.00 | $350.00 |
| 47 | Set (type I)(S= 3 FT)(HW= 4 FT)(4:1)(C) (467-7045) | EACH | 2 | $6,500.00 | $10,000 | $7,000.00 | $8,100.09 | $14,000 | $7,500.00 | $9,700.48 |
| 48 | Set (type I)(S= 5 FT)(HW= 3 FT)(3:1)(C) (467-7095) | EACH | 4 | $7,100.00 | $7,872.00 | $8,000.00 | $9,180.10 | $6,000.00 | $8,500.00 | $9,177.11 |
| 49 | Set (type I)(S= 6 FT)(HW= 4 FT)(4:1)(C) (467-7129) | EACH | 4 | $8,750.00 | $9,028.00 | $10,000 | $10,800 | $10,000 | $10,000 | $11,432 |
| 50 | Set (type I)(S= 6 FT)(HW= 5 FT)(3:1)(C) (467-7132) | EACH | 4 | $9,100.00 | $9,193.00 | $12,000 | $12,960 | $12,000 | $12,000 | $13,511 |
| 51 | Set (type I)(S= 6 FT)(HW= 5 FT)(4:1)(C) (467-7133) | EACH | 4 | $9,250.00 | $12,161 | $13,000 | $14,040 | $15,000 | $13,000 | $15,148 |
| 52 | Set (type I)(S= 6 FT)(HW= 7 FT)(3:1)(C) (467-7140) | EACH | 6 | $14,000 | $11,044 | $14,000 | $16,200 | $14,000 | $15,000 | $17,396 |
| 53 | Set (type I)(S= 7 FT)(HW= 5 FT)(3:1)(C) (467-7157) | EACH | 4 | $15,500 | $10,800 | $15,000 | $17,280 | $15,000 | $16,000 | $17,803 |
| 54 | Set (type II) (15 in) (RCP) (6: 1) (P) (467-7300) | EACH | 14 | $1,300.00 | $1,861.00 | $850.00 | $972.01 | $2,500.00 | $900.00 | $900.00 |
| 55 | Set (type II) (18 in) (CMP) (6: 1) (P) (467-7304) | EACH | 14 | $1,550.00 | $1,635.00 | $900.00 | $1,080.01 | $2,400.00 | $1,000.00 | $1,000.00 |
| 56 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 46 | $1,650.00 | $2,137.00 | $900.00 | $1,080.01 | $2,800.00 | $1,000.00 | $1,000.00 |
| 57 | Set (type II) (24 in) (CMP) (6: 1) (P) (467-7324) | EACH | 4 | $2,000.00 | $1,914.00 | $2,500.00 | $2,700.03 | $2,500.00 | $2,500.00 | $2,500.00 |
| 58 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 2 | $2,300.00 | $2,255.00 | $2,000.00 | $2,160.02 | $2,600.00 | $2,000.00 | $2,000.00 |
| 59 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 2 | $2,500.00 | $2,790.00 | $2,000.00 | $2,160.02 | $3,100.00 | $2,000.00 | $2,000.00 |
| 60 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 34 | $2,400.00 | $2,534.00 | $2,500.00 | $2,700.03 | $3,100.00 | $2,500.00 | $2,500.00 |
| 61 | Set (type II) (30 in) (CMP) (6: 1) (P) (467-7344) | EACH | 4 | $3,300.00 | $2,928.00 | $3,500.00 | $3,780.04 | $3,900.00 | $3,500.00 | $3,500.00 |
| 62 | Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346) | EACH | 2 | $3,600.00 | $2,906.00 | $3,000.00 | $3,240.03 | $4,000.00 | $3,000.00 | $3,000.00 |
| 63 | Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348) | EACH | 12 | $4,000.00 | $3,677.00 | $3,500.00 | $3,780.04 | $4,600.00 | $3,500.00 | $3,500.00 |
| 64 | Set (type II) (36 in) (CMP) (6: 1) (P) (467-7364) | EACH | 2 | $4,500.00 | $3,500.00 | $4,500.00 | $4,860.05 | $5,800.00 | $4,500.00 | $4,500.00 |
| 65 | Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366) | EACH | 18 | $4,900.00 | $4,037.00 | $4,000.00 | $4,320.05 | $4,800.00 | $4,000.00 | $4,000.00 |
| 66 | Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368) | EACH | 4 | $5,000.00 | $5,069.00 | $4,500.00 | $4,860.05 | $5,400.00 | $4,500.00 | $4,500.00 |
| 67 | Set (type II) (48 in) (RCP) (4: 1) (C) (467-7390) | EACH | 6 | $6,500.00 | $8,729.00 | $6,000.00 | $7,020.07 | $8,500.00 | $6,500.00 | $6,500.00 |
| 68 | Set (type II) (48 in) (RCP) (6: 1) (P) (467-7392) | EACH | 2 | $7,200.00 | $11,738 | $7,000.00 | $8,100.09 | $10,000 | $7,500.00 | $7,500.00 |
| 69 | Removing structure (small) (496-7036) | EACH | 4 | $1,500.00 | $600.00 | $750.00 | $1,296.01 | $2,000.00 | $1,200.00 | $1,200.00 |
| 70 | Mobilization (500-7001) | LS | 1 | $623,000 | $429,600 | $310,000 | $717,991 | $825,000 | $959,000 | $1,100,000 |
| 71 | Barricades, signs and traffic handling (502-7001) | MO | 14 | $6,500.00 | $2,869.00 | $5,000.00 | $1,802.08 | $15,000 | $25,000 | $26,820 |
| 72 | Portable changeable message sign (503-7002) | EACH | 2 | $10,000 | $18,000 | $20,000 | $10,765 | $18,927 | $17,000 | $10,000 |
| 73 | TMA (stationary) (505-7001) | DAY | 10 | $400.00 | $200.00 | $125.00 | $318.26 | $100.00 | $240.00 | $180.00 |
| 74 | TMA (mobile operation) (505-7003) | DAY | 20 | $500.00 | $750.00 | $125.00 | $385.37 | $100.00 | $240.00 | $395.00 |
| 75 | Rock filter dams (install) (type 1) (506-7001) | LF | 950 | $45.00 | $45.00 | $38.00 | $45.00 | $50.00 | $45.00 | $45.00 |
| 76 | Rock filter dams (remove) (506-7011) | LF | 950 | $10.00 | $6.00 | $12.00 | $20.00 | $11.00 | $20.00 | $6.00 |
| 77 | Sandbags for erosion control (506-7035) | EACH | 100 | $10.00 | $10.00 | $20.00 | $3.00 | $32.00 | $3.00 | $10.00 |
| 78 | Temporary sediment control fence (install) (506-7039) | LF | 400 | $4.50 | $7.25 | $6.00 | $3.50 | $11.00 | $3.50 | $5.00 |
| 79 | Temporary sediment control fence (remove) (506-7041) | LF | 400 | $1.00 | $0.90 | $1.50 | $2.00 | $3.00 | $2.00 | $0.90 |
| 80 | Driveways (surface treat) (530-7016) | SY | 3,410 | $45.00 | $41.80 | $40.50 | $35.20 | $35.00 | $75.00 | $33.00 |
| 81 | Turnouts (surface treat) (530-7019) | SY | 134 | $45.00 | $181.85 | $100.00 | $35.20 | $30.00 | $400.00 | $44.00 |
| 82 | Metal W-beam guard fence (timber post) (540-7001) | LF | 400 | $32.00 | $28.35 | $28.35 | $31.33 | $30.00 | $23.75 | $23.75 |
| 83 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,000.00 | $2,140.00 | $2,140.00 | $2,917.27 | $2,200.00 | $3,800.00 | $1,858.00 |
| 84 | Short radius (28") (540-7013) | LF | 25 | $380.00 | $35.40 | $35.40 | $39.12 | $35.00 | $54.00 | $54.00 |
| 85 | Driveway terminal anchor section (540-7014) | EACH | 1 | $700.00 | $1,090.00 | $1,090.00 | $1,204.48 | $1,100.00 | $952.00 | $952.00 |
| 86 | Guardrail end treatment (install) (544-7001) | EACH | 3 | $3,200.00 | $3,150.00 | $3,150.00 | $3,480.83 | $3,200.00 | $3,096.00 | $3,096.00 |
| 87 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 15 | $325.00 | $125.00 | $175.00 | $175.00 | $175.00 | $183.50 | $183.50 |
| 88 | Mailbox install-D (WC-post) type 3 (560-7005) | EACH | 1 | $390.00 | $140.00 | $225.00 | $225.00 | $225.00 | $255.00 | $255.00 |
| 89 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 560 | $17.00 | $11.90 | $11.90 | $11.90 | $12.00 | $11.90 | $11.90 |
| 90 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 30 | $26.00 | $16.16 | $16.16 | $16.16 | $17.00 | $16.16 | $16.16 |
| 91 | Electrical conductor (no.8) bare (620-7007) | LF | 710 | $2.75 | $1.49 | $1.50 | $1.49 | $1.50 | $1.49 | $1.49 |
| 92 | Electrical conductor (no.8) insulated (620-7008) | LF | 308 | $3.00 | $1.57 | $1.60 | $1.57 | $1.60 | $1.57 | $1.57 |
| 93 | Ground box type A (122311)W/apron (624-7002) | EACH | 2 | $1,600.00 | $888.98 | $890.00 | $888.98 | $900.00 | $888.98 | $888.98 |
| 94 | Zinc-coat steel wire strand (3/16") (625-7001) | LF | 120 | $9.00 | $4.52 | $4.52 | $4.52 | $4.50 | $4.52 | $4.52 |
| 95 | Zinc-coat steel wire strand (5/16") (625-7003) | LF | 248 | $8.00 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 96 | Remove electrical services (628-7002) | EACH | 2 | $1,000.00 | $81.66 | $82.00 | $81.66 | $82.00 | $81.66 | $81.66 |
| 97 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 1 | $8,200.00 | $5,624.94 | $5,625.00 | $5,624.94 | $5,800.00 | $5,624.94 | $5,624.94 |
| 98 | Elc SRV type T 120/240 000(NS)GS(N)SP(O) (628-7326) | EACH | 1 | $7,900.00 | $3,874.94 | $3,875.00 | $3,874.94 | $4,000.00 | $3,874.94 | $3,874.94 |
| 99 | Aluminum signs (type A) (636-7001) | SF | 36 | $65.00 | $30.00 | $25.05 | $21.00 | $21.00 | $41.00 | $41.00 |
| 100 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 11 | $650.00 | $750.00 | $775.00 | $775.00 | $775.00 | $585.00 | $585.00 |
| 101 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 4 | $700.00 | $850.00 | $910.00 | $910.00 | $910.00 | $678.00 | $678.00 |
| 102 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 1 | $830.00 | $850.00 | $1,055.00 | $1,055.00 | $1,055.00 | $715.00 | $715.00 |
| 103 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 3 | $900.00 | $925.00 | $1,075.00 | $1,075.00 | $1,075.00 | $755.00 | $755.00 |
| 104 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 26 | $450.00 | $535.00 | $490.00 | $490.00 | $500.00 | $275.00 | $275.00 |
| 105 | Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058) | EACH | 2 | $475.00 | $550.00 | $630.00 | $630.00 | $650.00 | $313.00 | $313.00 |
| 106 | Remove SM RD SN sup&AM (644-7073) | EACH | 48 | $100.00 | $100.00 | $90.00 | $90.00 | $100.00 | $71.00 | $71.00 |
| 107 | Install delineator assembly (D-SW)SZ 1(BRF)GF1 (BI) (658-7016) | EACH | 10 | $55.00 | $28.00 | $22.50 | $22.50 | $23.00 | $14.00 | $14.00 |
| 108 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 16 | $55.00 | $32.00 | $28.50 | $28.50 | $29.00 | $22.00 | $22.00 |
| 109 | Install object marker assembly (OM-2Y)(WC)GND(BI) (658-7057) | EACH | 30 | $95.00 | $75.00 | $73.50 | $73.50 | $8.00 | $168.00 | $168.00 |
| 110 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 175,890 | $0.35 | $0.30 | $0.29 | $0.29 | $0.30 | $0.41 | $0.30 |
| 111 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 16,740 | $0.35 | $0.30 | $0.29 | $0.29 | $0.30 | $0.45 | $0.35 |
| 112 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 78,204 | $0.35 | $0.30 | $0.29 | $0.29 | $0.30 | $0.41 | $0.30 |
| 113 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 8,934 | $3.00 | $2.00 | $1.00 | $1.63 | $1.00 | $1.00 | $0.50 |
| 114 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 58,630 | $0.90 | $1.01 | $0.79 | $0.79 | $0.80 | $1.10 | $1.02 |
| 115 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 26,068 | $0.90 | $1.01 | $0.79 | $0.79 | $0.80 | $1.15 | $1.02 |
| 116 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 5,580 | $0.90 | $1.01 | $0.79 | $0.79 | $0.80 | $1.25 | $1.02 |
| 117 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 1,000 | $0.60 | $1.10 | $0.80 | $0.80 | $0.80 | $1.00 | $1.02 |
| 118 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 236 | $20.00 | $15.00 | $15.00 | $15.00 | $15.00 | $16.00 | $17.50 |
| 119 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 605 | $6.00 | $7.00 | $6.40 | $6.40 | $6.50 | $6.00 | $7.50 |
| 120 | Install highway traffic signal (flash beacon) (680-7001) | EACH | 1 | $12,000 | $2,376.93 | $2,380.00 | $2,376.93 | $2,500.00 | $2,376.93 | $2,376.93 |
| 121 | Removing traffic signals (680-7004) | EACH | 1 | $6,500.00 | $1,959.83 | $1,960.00 | $1,959.83 | $2,000.00 | $1,959.83 | $1,959.83 |
| 122 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 4 | $220.00 | $309.99 | $310.00 | $309.99 | $325.00 | $309.99 | $309.99 |
| 123 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 6 | $400.00 | $378.74 | $379.00 | $378.74 | $400.00 | $378.74 | $378.74 |
| 124 | Back plate (12")(1 sec)(vented)aluminum (682-7025) | EACH | 6 | $350.00 | $114.16 | $115.00 | $114.16 | $115.00 | $114.16 | $114.16 |
| 125 | Traffic signal CBL (type A)(10 AWG)(3 conductor) (684-7002) | LF | 713 | $2.55 | $1.93 | $2.00 | $1.93 | $2.00 | $1.93 | $1.93 |
| 126 | Install RDSD flash beacon assembly (685-7001) | EACH | 2 | $5,500.00 | $2,408.30 | $2,410.00 | $2,408.30 | $2,500.00 | $2,408.30 | $2,408.30 |
| 127 | Remove RDSD flash beacon assembly (685-7003) | EACH | 1 | $805.00 | $297.24 | $298.00 | $297.24 | $300.00 | $297.24 | $297.24 |
| 128 | Ins traffic signal PL AM (S)STR(type D)lum (686-7020) | EACH | 2 | $10,830 | $13,943 | $13,950 | $13,943 | $14,000 | $13,943 | $13,943 |
| 129 | TMSP radar speed control monitor (6025-7001) | EACH | 2 | $7,750.00 | $23,000 | $10,000 | $8,389.38 | $10,000 | $24,080 | $14,200 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2025. Compiled by Mirage Metrics.