R & G Construction, LLC: TxDOT bid record
R & G Construction, LLC submitted 11 bids on Texas DOT contracts in the data, from 08 APR 2020 to 04 FEB 2022, and was the low bidder on 3 of them (27%). When it was not low, its total sat a median +7.0% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $7,130,539
- Latest bid
- 04 FEB 2022
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 5 | 0 | 0% |
| 2021 | 5 | 2 | 40% |
| 2022 | 1 | 1 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Atlanta District | 8 | 3 | 38% |
| Tyler District | 2 | 0 | 0% |
| Paris District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 11 | 6 (55%) | $2,000.00 | $5,000.00 |
| Vegetative watering | 168-7001 | MG | 9 | 5 (56%) | $4.00 | $29.97 |
| Metal beam guard fence trans (thrie-beam) | 540-7005 | EACH | 5 | 5 (100%) | $1,375.00 | $2,140.00 |
| Removing structure (pipe) | 496-7007 | LF | 5 | 5 (100%) | $4.00 | $24.00 |
| Removing concrete (driveways) | 104-7011 | SY | 7 | 4 (57%) | $11.00 | $21.00 |
| Bond fiber MTRX seed (permanent)(rural)(sand) | 164-6054 | SY | 7 | 3 (43%) | $0.68 | $0.78 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 9 | 2 (22%) | $0.90 | $1.00 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 7 | 2 (29%) | $490.00 | $643.00 |
| TMA (stationary) | 505-7001 | DAY | 5 | 2 (40%) | $110.00 | $230.00 |
| Removing concrete (riprap) | 104-7006 | SY | 5 | 2 (40%) | $17.00 | $25.00 |
| Set (type II) (30 in) (RCP) (6: 1) (P) | 467-7348 | EACH | 5 | 2 (40%) | $1,850.00 | $3,000.00 |
| Embankment (vehicle)(ord comp)(type C) | 132-6021 | CY | 5 | 2 (40%) | $12.00 | $35.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| East Texas Bridge, Inc. | 11 | 3 of 11 |
| Longview Bridge and Road, LTD. | 8 | 3 of 8 |
| Highway 19 Construction LLC | 7 | 1 of 7 |
| H. V. Caver, Inc. | 5 | 2 of 5 |
| Stateline Construction, LLC | 4 | 2 of 4 |
| Pierce R & B LLC | 3 | 1 of 3 |
| CDM Holdings | 3 | 2 of 3 |
| SCR Civil Construction, LLC | 3 | 0 of 3 |
| Harrison, Walker and Harper, LP | 3 | 0 of 3 |
| Baker & Company Construction, LLC | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 FEB 2022 | 02223228 | Atlanta District | IH 20 Bridge maintenance from AT BNSF RAILROAD | 1 of 5 | $639,848 | Low, 34% under the second |
| 03 JUN 2021 | 06213026 | Atlanta District | FM 2735 Safety treat fixed objects from 8.3 MI. N. OF US 82 to US 82 | 4 of 9 | $1,758,465 | +18% |
| 06 MAY 2021 | 05213219 | Atlanta District | IH 20 Bridge maintenance from AT BNSF RAILROAD | 3 of 7 | $706,665 | +2.0% |
| 07 APR 2021 | 04213005 | Atlanta District | FM 248 Safety treat fixed objects from SH 43 to MARION C/L | 5 of 9 | $2,973,494 | +10% |
| 04 FEB 2021 | 02213024 | Atlanta District | FM 728 Safety treat fixed objects from 3.630 MI N OF SH 49 to SH 49 | 1 of 13 | $856,033 | Low, 28% under the second |
| 07 JAN 2021 | 01213005 | Atlanta District | SL 255 Construction of a new 2-lane roadway from FM 1520 to US 271 | 1 of 9 | $5,634,658 | Low, 9.0% under the second |
| 05 NOV 2020 | 11203215 | Paris District | FM 71 Rehabilitation of existing road from FM 69 S to FM 3236 | 3 of 7 | $4,556,566 | +4.0% |
| 04 NOV 2020 | 11203011 | Atlanta District | US 59 Install median barrier from 1.46 MI S. OF SH 155 to MARION COUNTY LINE | 3 of 11 | $4,986,346 | +12% |
| 05 AUG 2020 | 08203005 | Tyler District | FM 2206 Widen 2 ln road to 4 lane divided roadway w/flush from SH 42, E to 1.6 MI W OF SL281(FISHER RD)IN LGVW | 3 of 4 | $13,567,635 | +3.0% |
| 05 JUN 2020 | 06203209 | Atlanta District | SH 98 Replace bridges and approaches from AT ANDERSON CK & ANDERSON CK RELIEF | 2 of 6 | $4,065,123 | +4.0% |
| 08 APR 2020 | 04203010 | Tyler District | FM 2204 Improve drainage, culverts and upgrade guard rail from US 259 IN KILGORE, E to SH 322, ETC | 5 of 8 | $4,433,034 | +14% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.