Sacyr Construction USA LLC: TxDOT bid record
Sacyr Construction USA LLC submitted 10 bids on Texas DOT contracts in the data, from 05 AUG 2020 to 02 FEB 2024, and was the low bidder on 2 of them (20%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $180,564,178
- Latest bid
- 02 FEB 2024
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 0 | 0% |
| 2021 | 4 | 1 | 25% |
| 2022 | 3 | 1 | 33% |
| 2023 | 1 | 0 | 0% |
| 2024 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Lubbock District | 5 | 2 | 40% |
| Houston District | 1 | 0 | 0% |
| Wichita Falls District | 1 | 0 | 0% |
| San Antonio District | 1 | 0 | 0% |
| Lufkin District | 1 | 0 | 0% |
| Amarillo District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 10 | 7 (70%) | $5,000.00 | $5,000.00 |
| Pavement surface preparation for marking (8") | 678-7004 | LF | 8 | 5 (63%) | $0.40 | $0.20 |
| Pavement surface preparation for marking (4") | 678-7001 | LF | 8 | 5 (63%) | $0.23 | $0.15 |
| Driveways (concrete) | 530-7006 | SY | 10 | 4 (40%) | $82.50 | $110.00 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 9 | 4 (44%) | $1.00 | $1.40 |
| Install small roadside sign support and assembly type 10BWG(1)SA(P) | 644-7001 | EACH | 9 | 4 (44%) | $600.00 | $710.00 |
| Install small roadside sign support and assembly type 10BWG(1)SA(T) | 644-7004 | EACH | 9 | 4 (44%) | $822.34 | $825.00 |
| Pavement surface preparation for marking (24") | 678-7008 | LF | 9 | 4 (44%) | $1.03 | $1.00 |
| Ground box type A (122311)W/apron | 624-7002 | EACH | 9 | 4 (44%) | $850.00 | $1,271.50 |
| Conduit (PVC) (schedule 80) (2") | 618-7054 | LF | 9 | 4 (44%) | $11.36 | $15.34 |
| Drilled shaft (roadway illumination pole) (30 in) | 416-7040 | LF | 8 | 4 (50%) | $182.50 | $280.00 |
| Pavement surface preparation for marking (12") | 678-7006 | LF | 8 | 4 (50%) | $0.88 | $0.41 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Webber, LLC | 10 | 7 of 10 |
| The Lane Construction Corporation | 3 | 1 of 3 |
| Williams Brothers Construction Co., Inc. | 2 | 2 of 2 |
| Austin Bridge & Road Services, LP Zachry Construction Corporation | 1 | 1 of 1 |
| Zachry Construction Corporation Austin Bridge & Road Services, LP | 1 | 0 of 1 |
| Austin Bridge & Road Services, LP | 1 | 0 of 1 |
| Allen Butler Construction, Inc. | 1 | 1 of 1 |
| FNF Construction, Inc. | 1 | 1 of 1 |
| Duininck, Inc. | 1 | 0 of 1 |
| Johnson Bros. Corporation, A Southland Company | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 FEB 2024 | 02243239 | Lubbock District | CS Widen road - add lanes from UPLAND AVENUE, FROM 66TH STREET to 82ND STREET | 3 of 3 | $28,381,172 | +49% |
| 03 AUG 2023 | 08233209 | Lubbock District | IH 27 Bridge replacement from 0.5 MILES SOUTH OF YUCCA LANE to 0.5 MILES NORTH OF YUCCA LANE | 2 of 2 | $25,351,373 | +4.0% |
| 01 DEC 2022 | 12223001 | Amarillo District | SL 335 Construct frontage roads from SW 9TH to FM 1719 | 2 of 2 | $159,964,654 | +19% |
| 02 JUN 2022 | 06223201 | Lufkin District | US 59 Highway improvement from FM 2021 to .34 MILE NORTH OF SL 287 | 5 of 5 | $78,693,253 | +25% |
| 04 FEB 2022 | 02223201 | Lubbock District | US 62 Surfacing/roadway restoration from MEMPHIS AVE to IH-27 | 1 of 3 | $25,690,813 | Low, 16% under the second |
| 05 AUG 2021 | 08213209 | Lubbock District | US 87 Construct bridge from 0.5 MI NORTH OF FM 41 to 0.5 MI SOUTH OF FM 41 | 3 of 5 | $22,439,461 | +4.0% |
| 04 JUN 2021 | 06213201 | Lubbock District | FM 1585 Convert non-freeway to freeway from MEMPHIS AVE to CR 2240 (AVE U) | 1 of 4 | $154,873,365 | Low, 3.0% under the second |
| 07 APR 2021 | 04213001 | San Antonio District | SL 1604 Widen road - add lanes from SH 16 to IH 10 | 3 of 5 | $166,060,750 | +12% |
| 05 FEB 2021 | 02213201 | Wichita Falls District | IH 35 Widen road - add lanes from 1.4 MI SOUTH OF SPRING CREEK ROAD to 0.2 MI SOUTH OF US 82 | 3 of 3 | $212,278,836 | +1.0% |
| 05 AUG 2020 | 08203001 | Houston District | IH 45 Reconstruct freeway from NORTH OF TEXAS CITY WYE to SOUTH OF TEXAS CITY WYE | 4 of 4 | $318,546,342 | +41% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.