The Lane Construction Corporation: TxDOT bid record

The Lane Construction Corporation submitted 15 bids on Texas DOT contracts in the data, from 07 MAY 2020 to 03 AUG 2022, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +15% above the low bid.

Owner
Texas DOT
Low bid volume
$0
Latest bid
03 AUG 2022
Data through
19 NOV 2026
15Bids
0Low bids
0Win rate, percent
+15%Median gap to the low bid when not low, 15 bids

By year

YearBidsLow bidsWin rate
2020400%
2021800%
2022300%
The Lane Construction Corporation, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Dallas District400%
San Antonio District400%
Houston District200%
Laredo District100%
Austin District100%
Lubbock District100%
Wichita Falls District100%
Abilene District100%
The Lane Construction Corporation, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Construction exits (install) (type 1)506-7020SY156 (40%)$17.00$30.00
Pavement surface preparation for marking (8")678-7004LF116 (55%)$0.20$0.20
In RD IL (U/P) (type 1) (150W EQ) LED610-7014EACH116 (55%)$1,100.00$1,500.00
Pavement surface preparation for marking (4")678-7001LF106 (60%)$0.10$0.15
Reflectorized pavement marker type II-C-R672-7006EACH145 (36%)$3.60$5.00
Work zone pavement marking removing (W)4"(broken)662-7061LF145 (36%)$0.69$1.00
Electrical conductor (no.6) bare620-7009LF125 (42%)$1.46$2.10
Electrical conductor (no.8) insulated620-7008LF125 (42%)$1.37$2.00
Electrical conductor (no.6) insulated620-7010LF125 (42%)$1.67$2.50
Electrical conductor (no.8) bare620-7007LF125 (42%)$1.30$1.92
Ground box type A (122311)W/apron624-7002EACH125 (42%)$890.00$1,271.50
Guardrail end treatment (remove)544-7003EACH115 (45%)$200.00$275.00
The Lane Construction Corporation, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Webber, LLC1313 of 13
Williams Brothers Construction Co., Inc.76 of 7
Zachry Construction Corporation77 of 7
Austin Bridge & Road Services, LP65 of 6
Flatiron Constructors, Inc.50 of 5
Fluor Heavy Civil, LLC33 of 3
Sacyr Construction USA LLC32 of 3
James Construction Group, LLC32 of 3
Pulice Construction, Inc.22 of 2
Zachry Construction Corporation Austin Bridge & Road Services, LP21 of 2
The Lane Construction Corporation, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
03 AUG 202208223006Abilene DistrictUS 380 Bridge replacement from SALT FORK BRAZOS RIVER3 of 3$22,341,408+52%
30 JUN 202206223601Dallas DistrictIH 35 Widen road - add lanes from AT FM 455 AND ON FM 455 FROM to W OF FM 2450 TO E OF MARION RD4 of 5$125,047,279+5.0%
29 JUN 202206223404Houston DistrictSH 288 Construct bridge from AT CR 488 of 8$48,421,804+26%
04 AUG 202108213015Dallas DistrictUS 380 Wdn 4 to 6 ln div w/ grade sep, add rt/lt turn ln from US 377 to WEST OF CR 26 (COUNTY LINE)3 of 6$156,343,260+11%
02 JUL 202107213201Dallas DistrictSL 9 Cnst 0 to 2 ln frtg (ult 6) & turn lanes from IH 35E to IH 456 of 10$93,242,303+12%
01 JUL 202107213001Wichita Falls DistrictUS 82 Widen road - add lanes from SH 175 / MONTAGUE STREET to NEAR FM 18166 of 9$55,542,210+15%
04 JUN 202106213201Lubbock DistrictFM 1585 Convert non-freeway to freeway from MEMPHIS AVE to CR 2240 (AVE U)4 of 4$178,856,799+15%
03 JUN 202106213001San Antonio DistrictSL 1604 Widen road - add lanes from IH 10 to US 2814 of 4$282,361,163+16%
08 APR 202104213201Austin DistrictIH 35 Highway improvement from SOUTH OF SH 80 to NORTH OF RM 122 of 6$82,853,610+2.0%
07 APR 202104213001San Antonio DistrictSL 1604 Widen road - add lanes from SH 16 to IH 104 of 5$166,741,489+13%
05 MAR 202103213201San Antonio DistrictIH 410 Construct direct connectors from AT IH 10 E4 of 5$114,218,762+14%
05 AUG 202008203001Houston DistrictIH 45 Reconstruct freeway from NORTH OF TEXAS CITY WYE to SOUTH OF TEXAS CITY WYE3 of 4$297,932,295+32%
09 JUL 202007203201San Antonio DistrictIH 10 Expand 4 to 6 ln expressway & from 4 to 4 ln fr from GRAYTOWN RD to GUADALUPE/BEXAR COUNTY LINE7 of 8$170,886,959+15%
04 JUN 202006203001Laredo DistrictIH 35 Grade,base,struct,acp,sign,pav mrks from SHILOH DRIVE to 0.38 MILES S. OF US 59 / IH 35 INT.4 of 4$131,891,597+15%
07 MAY 202005203001Dallas DistrictSL 12 Interchange improvements from SL12 AND SS482 to AT SH183 AND SH1146 of 6$435,523,207+23%
The Lane Construction Corporation: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy