Fluor Heavy Civil, LLC: TxDOT bid record
Fluor Heavy Civil, LLC submitted 31 bids on Texas DOT contracts in the data, from 07 MAY 2020 to 08 JAN 2025, and was the low bidder on 3 of them (10%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $551,006,333
- Latest bid
- 08 JAN 2025
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 14 | 1 | 7% |
| 2021 | 11 | 1 | 9% |
| 2022 | 2 | 1 | 50% |
| 2023 | 2 | 0 | 0% |
| 2024 | 1 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Dallas District | 14 | 0 | 0% |
| Fort Worth District | 12 | 2 | 17% |
| Austin District | 2 | 1 | 50% |
| Abilene District | 1 | 0 | 0% |
| Wichita Falls District | 1 | 0 | 0% |
| San Antonio District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 27 | 11 (41%) | $0.65 | $1.40 |
| Excavation (roadway) | 110-7001 | CY | 29 | 9 (31%) | $10.00 | $20.00 |
| TMA (stationary) | 505-7001 | DAY | 26 | 9 (35%) | $146.84 | $230.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 26 | 9 (35%) | $2,673.46 | $3,245.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 32 | 8 (25%) | $7,722.24 | $5,000.00 |
| Install small roadside sign support and assembly type 10BWG(1)SA(P) | 644-7001 | EACH | 25 | 8 (32%) | $535.00 | $710.00 |
| Metal W-beam guard fence (timber post) | 540-7001 | LF | 23 | 8 (35%) | $21.44 | $27.00 |
| Install small roadside sign support and assembly type 10BWG(1)SA(T) | 644-7004 | EACH | 23 | 8 (35%) | $647.36 | $825.00 |
| Metal beam guard fence trans (thrie-beam) | 540-7005 | EACH | 23 | 8 (35%) | $1,700.00 | $2,140.00 |
| Eliminating existing pavement marking & markers (4") | 677-6001 | LF | 22 | 7 (32%) | $0.50 | $0.60 |
| Block sodding | 162-7002 | SY | 22 | 7 (32%) | $3.75 | $6.20 |
| Pavement surface preparation for marking (4") | 678-7001 | LF | 22 | 7 (32%) | $0.14 | $0.15 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ed Bell Construction Company | 19 | 9 of 19 |
| Sema Construction, Inc. | 14 | 8 of 14 |
| Webber, LLC | 13 | 9 of 13 |
| Austin Bridge & Road Services, LP | 12 | 11 of 12 |
| Zachry Construction Corporation | 9 | 8 of 9 |
| J.D. Abrams, L.P. | 9 | 3 of 9 |
| Ragle Construction, Inc. | 9 | 3 of 9 |
| Hodges and Son Construction Company, Inc. | 8 | 4 of 8 |
| Ibctx, LLC | 7 | 3 of 7 |
| Mario Sinacola & Sons Excavating, Inc. | 6 | 3 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 JAN 2025 | A00064403 | Dallas District | Interchange Improvement, IH 35E (AT CORPORATE DRIVE to .) | 4 of 4 | $232,710,000 | +7.0% |
| 05 MAR 2024 | 03243004 | Dallas District | US 175 Bridge replacement from 2ND AVENUE to AT LAKE JUNE ROAD | 5 of 7 | $36,543,210 | +36% |
| 02 JUN 2023 | 06233223 | Dallas District | FM 547 Bridge replacement from AT SABINE CREEK BRANCH NO 1 | 3 of 6 | $5,569,300 | +14% |
| 02 JUN 2023 | 06233231 | Dallas District | FM 543 Replace bridge and approaches from @TAYLOR BRCH, SABINE CR & S. CR #1 | 3 of 5 | $3,846,000 | +32% |
| 05 MAY 2022 | 05223202 | Austin District | IH 35 Widen road - add lanes from US 290W/SH 71 to SH 45 SE | 1 of 5 | $547,603,210 | Low, 4.0% under the second |
| 06 JAN 2022 | 01223044 | Dallas District | IH 35E Interchange improvement from AT FM 387 (BUTCHER ROAD) | 3 of 8 | $52,849,999 | +3.0% |
| 03 NOV 2021 | 11213001 | San Antonio District | IH 10 Widen road - add lanes from BEXAR/GUADALUPE COUNTY LINE to FM 465 | 5 of 5 | $157,568,400 | +26% |
| 05 AUG 2021 | 08213259 | Fort Worth District | CS Bridge replacement from KNIGHT RD. @ BRANCH OF ROCK CREEK | 3 of 4 | $1,023,082 | +11% |
| 04 AUG 2021 | 08213003 | Fort Worth District | US 287 Widen road - add shoulders from NORTH OF UPRR to JOHNSON COUNTY LINE | 5 of 7 | $34,572,255 | +12% |
| 02 JUL 2021 | 07213201 | Dallas District | SL 9 Cnst 0 to 2 ln frtg (ult 6) & turn lanes from IH 35E to IH 45 | 3 of 10 | $90,443,112 | +9.0% |
| 02 JUL 2021 | 07213224 | Fort Worth District | US 180 Bridge replacement from US 180 WB OVER DRY CREEK | 2 of 7 | $2,204,599 | +3.0% |
| 01 JUL 2021 | 07213001 | Wichita Falls District | US 82 Widen road - add lanes from SH 175 / MONTAGUE STREET to NEAR FM 1816 | 5 of 9 | $52,903,500 | +9.0% |
| 04 JUN 2021 | 06213202 | Dallas District | SH 114 Construct 0 to 6 lane grade separation over us 37 from WEST OF US 377 to EAST OF US 377 | 4 of 13 | $39,976,000 | +8.0% |
| 03 JUN 2021 | 06213012 | Fort Worth District | US 287 Bridge maintenance from AT SH 180 | 1 of 6 | $2,870,123 | Low, 27% under the second |
| 06 MAY 2021 | 05213208 | Dallas District | SH 78 Reconfigure intersection with sidewalk improvemen from AT GASTON AVE | 8 of 10 | $7,660,161 | +21% |
| 06 MAY 2021 | 05213213 | Dallas District | IH 20 Improve approach, widen bridge to add turn lane from AT BONNIE VIEW RD to IN CITY OF DALLAS | 4 of 5 | $3,555,777 | +10% |
| 05 MAR 2021 | 03213218 | Fort Worth District | CR Bridge replacement from GILLILAND RD. AT WALNUT CREEK | 8 of 12 | $1,246,449 | +17% |
| 02 DEC 2020 | 12203015 | Dallas District | FM 66 Replace bridge and approaches from AT COFFEE BRANCH AND to MESQUITE BRANCH. | 7 of 16 | $2,873,914 | +15% |
| 05 NOV 2020 | 11203205 | Dallas District | SH 310 Replace bridge and approaches from AT LAMAR ST. AND UP RR | 10 of 13 | $17,920,463 | +20% |
| 05 NOV 2020 | 11203216 | Abilene District | US 83 Bridge replacement & approaches from DOUBLE MTN FORK BRIDGE to DOUBLE MTN FORK BRIDGE | 6 of 8 | $6,101,096 | +52% |
| 05 NOV 2020 | 11203230 | Dallas District | CR Replace bridge and approaches from AT SOUTH AND NORTH DRAW | 9 of 14 | $1,077,421 | +28% |
| 04 SEP 2020 | 09203205 | Dallas District | FM 2478 Gr, str, base, crcp, pvmt mkgs from US 380 to NORTH OF FM 1461 | 9 of 12 | $35,288,847 | +19% |
| 06 AUG 2020 | 08203213 | Fort Worth District | FM 205 Hazard elimination & safety from 0.456 MI NE OF CR 182 to FM 2870 | 4 of 5 | $12,099,484 | +22% |
| 06 AUG 2020 | 08203252 | Fort Worth District | CR Bridge replacement from BRIAR CREEK to ON LIBERTY SCHOOL RD | 4 of 9 | $643,000 | +25% |
| 05 AUG 2020 | 08203027 | Fort Worth District | FM 1220 Reconstruct existing roadway from W. BAILEY BOSWELL ROAD to AZLE AVENUE | 3 of 4 | $3,347,715 | +26% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.