South Texas Illumination, LLC: TxDOT bid record
South Texas Illumination, LLC submitted 15 bids on Texas DOT contracts in the data, from 08 JUL 2020 to 03 NOV 2022, and was the low bidder on 4 of them (27%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $7,293,823
- Latest bid
- 03 NOV 2022
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 5 | 1 | 20% |
| 2021 | 3 | 0 | 0% |
| 2022 | 7 | 3 | 43% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Tyler District | 5 | 2 | 40% |
| Fort Worth District | 2 | 0 | 0% |
| Atlanta District | 2 | 0 | 0% |
| San Angelo District | 1 | 1 | 100% |
| Abilene District | 1 | 0 | 0% |
| Paris District | 1 | 0 | 0% |
| Waco District | 1 | 1 | 100% |
| Dallas District | 1 | 0 | 0% |
| Houston District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Portable changeable message sign | 503-7001 | DAY | 6 | 3 (50%) | $93.20 | $100.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 13 | 2 (15%) | $7,799.25 | $5,000.00 |
| TMA (stationary) | 505-7001 | DAY | 13 | 2 (15%) | $362.50 | $230.00 |
| Electrical conductor (no.8) bare | 620-7007 | LF | 5 | 2 (40%) | $1.49 | $1.92 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 6 | 1 (17%) | $1.14 | $1.00 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 5 | 1 (20%) | $572.05 | $643.00 |
| Vegetative watering | 168-7001 | MG | 5 | 1 (20%) | $57.50 | $29.97 |
| Furnishing and placing topsoil (4") | 160-6003 | SY | 5 | 1 (20%) | $4.14 | $3.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Highway Intelligent Traffic Solutions, Inc. | 8 | 6 of 8 |
| FNH Construction, LLC | 5 | 1 of 5 |
| WG Engineering & Construction, LLC | 5 | 3 of 5 |
| Highway 19 Construction LLC | 4 | 2 of 4 |
| Encino Landscape, Inc. | 4 | 1 of 4 |
| East Texas Bridge, Inc. | 4 | 1 of 4 |
| Select Maintenance, L.L.C. | 4 | 1 of 4 |
| Mica Corporation | 4 | 1 of 4 |
| Florida Traffic Control Devices, Inc. | 4 | 1 of 4 |
| Ti-Zack Concrete, LLC | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 NOV 2022 | 11224213 | Tyler District | US0080 Traffic control services from VARIOUS ROADWAYS IN to WOOD AND VAN ZANDT COUNTIES | 1 of 4 | $1,979,845 | Low, 1.0% under the second |
| 07 SEP 2022 | 09223014 | Houston District | FM 1464 Install/upgrade roadway lighting from WEST AIRPORT to SH 99 | 6 of 6 | $1,955,025 | +65% |
| 07 APR 2022 | 04223209 | Atlanta District | CS Bicycle and pedestrian improvements from US 80 to CAL YOUNG ROAD | 8 of 9 | $672,830 | +47% |
| 07 APR 2022 | 04223233 | Tyler District | VA Install/upgrade roadway lighting from VARIOUS LOCATIONS IN to THE TYLER DISTRICT | 2 of 6 | $450,325 | +12% |
| 04 FEB 2022 | 02223229 | Tyler District | CS Bridge replacement from AT BIG HEAD CREEK to STR #001, IN KILGORE | 1 of 6 | $638,113 | Low, 5.0% under the second |
| 03 FEB 2022 | 02223017 | Dallas District | VA Install/replace signs from VARIOUS FREEWAYS IN COLLIN to DALLAS, ELLIS & NAVARRO | 3 of 7 | $1,114,041 | +12% |
| 07 JAN 2022 | 01223224 | Waco District | SH 6 Safety lighting from .5 MI N OF SP 412 to SP 412 | 1 of 11 | $770,035 | Low, 6.0% under the second |
| 01 DEC 2021 | 12213021 | Paris District | SH 5 Bicycle and pedestrian improvements from NEWPORT DR AT PARTIN ELEMENTARY SCH to 0.645 MI S OF FM 3133 AT MOORE PARK | 6 of 7 | $891,949 | +35% |
| 03 NOV 2021 | 11213009 | Fort Worth District | IH 35W Hazard elimination & safety from BETHESDA ROAD to 0.669 MILES NORTH OF HIDDEN CREEK. | 3 of 9 | $1,139,818 | +7.0% |
| 07 OCT 2021 | 10213010 | Abilene District | VA Install/replace signs from IH 20 to ABILENE DISTRICT | 5 of 9 | $1,974,508 | +23% |
| 02 DEC 2020 | 12203019 | Atlanta District | FM 248 Installing safety lighting from AT FM 2683 | 2 of 4 | $1,192,447 | +5.0% |
| 06 AUG 2020 | 08203234 | San Angelo District | VA Sidewalks and curb ramps from IN CITY OF SAN ANGELO | 1 of 5 | $3,905,830 | Low, 7.0% under the second |
| 06 AUG 2020 | 08203257 | Tyler District | CS Sidewalks and pedestrian bridge from EDGEWOOD ADDITION to FM515/COKE RD | 3 of 8 | $374,698 | +10% |
| 05 AUG 2020 | 08203034 | Fort Worth District | VA Install illumination from VARIOUS LOCATIONS IN TARRANT CO | 4 of 4 | $2,336,203 | +26% |
| 08 JUL 2020 | 07203028 | Tyler District | VA Sidewalks & ada ped ramps from VAR LOCS IN SMITH COUNTY to ALONG, SH64, SH110, SH135 | 3 of 8 | $3,738,152 | +6.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way