Fuqua Construction Co., Inc.: TxDOT bid record

Fuqua Construction Co., Inc. submitted 61 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 03 NOV 2026, and was the low bidder on 9 of them (15%). When it was not low, its total sat a median +36% above the low bid.

Owner
Texas DOT
Low bid volume
$8,613,887
Latest bid
03 NOV 2026
Data through
19 NOV 2026
61Bids
9Low bids
15Win rate, percent
+36%Median gap to the low bid when not low, 51 bids

By year

YearBidsLow bidsWin rate
202017212%
20211716%
20226350%
20237229%
2024600%
2025600%
20262150%
Fuqua Construction Co., Inc., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Bryan District29621%
Yoakum District17212%
Austin District4125%
Waco District300%
Lufkin District200%
Houston District200%
Corpus Christi District100%
Odessa District100%
Paris District100%
Dallas District100%
Fuqua Construction Co., Inc., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Vegetative watering168-7001MG4521 (47%)$20.00$29.97
Barricades, signs and traffic handling502-7001MO5919 (32%)$2,315.20$5,000.00
Cem stabil BKFL400-7010CY4717 (36%)$150.00$200.00
Excavation (roadway)110-7001CY4513 (29%)$17.82$20.00
Reflectorized pavement marker type II-A-A672-7004EACH179 (53%)$5.53$5.00
Temporary sediment control fence (remove)506-7041LF568 (14%)$1.45$1.00
Preparing row100-7002STA468 (17%)$5,712.66$2,750.00
Rail (type T223)450-7008LF278 (30%)$124.95$160.00
Class C concrete (abutment)420-7012CY417 (17%)$1,264.90$1,315.00
Excavation (channel)110-7002CY267 (27%)$15.64$27.00
Class C concrete (column)420-7038CY217 (33%)$1,717.37$1,600.00
Guardrail end treatment (install)544-7001EACH466 (13%)$3,357.50$3,245.00
Fuqua Construction Co., Inc., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Knife River Corporation - South2914 of 29
Hodges and Son Construction Company, Inc.2918 of 29
Trevway, Inc.1310 of 13
Texas Materials Group, Inc.127 of 12
Acme Bridge Company, Inc.107 of 10
C. E. Barker, LTD.107 of 10
SB Contractors LLC96 of 9
FNH Construction, LLC92 of 9
Angel Brothers Holdings Corp.83 of 8
Stateline Construction, LLC87 of 8
Fuqua Construction Co., Inc., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
03 NOV 2026A00204003Bryan DistrictBridge Replacement, COUNTY ROAD 244 (ON CR 244 (FCR 344) to AT DEEP CREEK)15 of 15$1,415,641+96%
03 SEP 2026A00189990Bryan DistrictBridge Replacement, BETHEL CEMETERY RD (ON CR 444 (BETHEL CEMETERY RD, F-CR 231) to AT BEDIAS CREEK)1 of 7$1,143,373Low, 0.0% under the second
02 DEC 2025A00124687Bryan DistrictBridge Replacement, FM 2039 (AT PORTER CREEK to .)9 of 9$4,259,517+84%
05 NOV 2025A00135986Bryan DistrictBridge Replacement, SH 105 (AT JACKSON CREEK to .)12 of 12$4,646,509+65%
04 JUN 2025A00130805Yoakum DistrictBridge Replacement, GEBHARD RD (AT HAW CREEK to STR#AA04-89-001)8 of 10$1,598,110+37%
04 MAR 2025A00180383Bryan DistrictDrainage Improvements, SH 30 (CR 171 to 0.1 Mi E of FM 244)8 of 9$1,499,778+57%
12 FEB 2025A00213842Bryan DistrictROCK/RIPRAP, SH0036 (Various to Various)4 of 4$465,975+62%
07 JAN 2025A00188286Yoakum DistrictBridge Replacement, FRANTZ RD (AT SAN BERNARD RIVER to STR# AA52-06-001 (FRANTZ RD))2 of 9$1,841,526+6.0%
06 NOV 2024A00190497Bryan DistrictBicycle And Pedestrian Improvements, SH 105 (Third Street to Seventh Street)6 of 8$1,179,000+51%
09 JUL 202407243019Bryan DistrictFM 80 Bridge replacement from AT SANDERS CREEK7 of 7$4,546,105+64%
05 JUN 202406243039Bryan DistrictCR Bridge replacement from ON CR 232 (LOCAL ROAD 146) to AT BIRCH CREEK4 of 6$1,398,000+16%
03 MAY 202405243240Bryan DistrictCR Bridge replacement from CR 443 AT BUSHY CREEK10 of 10$1,710,200+76%
02 MAY 202405243043Bryan DistrictVA Bridge maintenance from VARIOUS LOCATIONS8 of 8$447,539+158%
01 FEB 202402243045Yoakum DistrictCR Bridge replacement from AT MILL CREEK to STR # AA03-66-003 (MILL CREEK RD)5 of 6$5,402,387+34%
03 AUG 202308233268Bryan DistrictCS Bridge replacement from ON CR 10 (WEST WHARTON CREEK ST) to AT TIDEWELL CREEK1 of 4$663,959Low, 3.0% under the second
02 AUG 202308233034Bryan DistrictCR Bridge replacement from ON CR 201 to AT MILL CREEK4 of 6$2,476,792+9.0%
02 AUG 202308233050Bryan DistrictCR Bridge replacement from HIGHLAND DRIVE AT HARMON CREEK4 of 5$1,070,638+29%
02 AUG 202308233052Bryan DistrictCS Construct pedestrian infrastructure from SH 105 to FM 30901 of 6$854,655Low, 1.0% under the second
28 JUN 202306233614Bryan DistrictFM 27 Bridge replacement from AT GRINDSTONE CREEK3 of 4$6,308,232+12%
08 MAR 202303233228Yoakum DistrictCR Bridge replacement from AT BRUSHY BRANCH to STR# AA01-14-001 (BOEHNKE RD)8 of 8$3,643,694+40%
07 MAR 202303233031Bryan DistrictCR Bridge replacement from ON CR 255 (LOCAL ROAD 301) to AT OAK BRANCH2 of 4$1,026,885+9.0%
03 NOV 202211223224Yoakum DistrictCR Bridge replacement from AT PIN OAK BRANCH to STR#AA03-80-001(TEINERT RD)6 of 8$1,497,000+12%
29 JUN 202206223433Bryan DistrictSH 7 Bridge maintenance from AT NAVASOTA RIVER5 of 5$1,441,453+119%
05 MAY 202205223227Yoakum DistrictCR Bridge replacement from AT DRAW to STR# AA03-13-002 (KIEMSTEADT RD)1 of 5$1,258,244Low, 24% under the second
07 APR 202204223226Bryan DistrictCR Bridge replacement from ON CR 215 (LCR 120) to BIG ELM CREEK2 of 6$530,615+3.0%
Fuqua Construction Co., Inc.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy