Fuqua Construction Co., Inc.: TxDOT bid record
Fuqua Construction Co., Inc. submitted 61 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 03 NOV 2026, and was the low bidder on 9 of them (15%). When it was not low, its total sat a median +36% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $8,613,887
- Latest bid
- 03 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 17 | 2 | 12% |
| 2021 | 17 | 1 | 6% |
| 2022 | 6 | 3 | 50% |
| 2023 | 7 | 2 | 29% |
| 2024 | 6 | 0 | 0% |
| 2025 | 6 | 0 | 0% |
| 2026 | 2 | 1 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Bryan District | 29 | 6 | 21% |
| Yoakum District | 17 | 2 | 12% |
| Austin District | 4 | 1 | 25% |
| Waco District | 3 | 0 | 0% |
| Lufkin District | 2 | 0 | 0% |
| Houston District | 2 | 0 | 0% |
| Corpus Christi District | 1 | 0 | 0% |
| Odessa District | 1 | 0 | 0% |
| Paris District | 1 | 0 | 0% |
| Dallas District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Vegetative watering | 168-7001 | MG | 45 | 21 (47%) | $20.00 | $29.97 |
| Barricades, signs and traffic handling | 502-7001 | MO | 59 | 19 (32%) | $2,315.20 | $5,000.00 |
| Cem stabil BKFL | 400-7010 | CY | 47 | 17 (36%) | $150.00 | $200.00 |
| Excavation (roadway) | 110-7001 | CY | 45 | 13 (29%) | $17.82 | $20.00 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 17 | 9 (53%) | $5.53 | $5.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 56 | 8 (14%) | $1.45 | $1.00 |
| Preparing row | 100-7002 | STA | 46 | 8 (17%) | $5,712.66 | $2,750.00 |
| Rail (type T223) | 450-7008 | LF | 27 | 8 (30%) | $124.95 | $160.00 |
| Class C concrete (abutment) | 420-7012 | CY | 41 | 7 (17%) | $1,264.90 | $1,315.00 |
| Excavation (channel) | 110-7002 | CY | 26 | 7 (27%) | $15.64 | $27.00 |
| Class C concrete (column) | 420-7038 | CY | 21 | 7 (33%) | $1,717.37 | $1,600.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 46 | 6 (13%) | $3,357.50 | $3,245.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Knife River Corporation - South | 29 | 14 of 29 |
| Hodges and Son Construction Company, Inc. | 29 | 18 of 29 |
| Trevway, Inc. | 13 | 10 of 13 |
| Texas Materials Group, Inc. | 12 | 7 of 12 |
| Acme Bridge Company, Inc. | 10 | 7 of 10 |
| C. E. Barker, LTD. | 10 | 7 of 10 |
| SB Contractors LLC | 9 | 6 of 9 |
| FNH Construction, LLC | 9 | 2 of 9 |
| Angel Brothers Holdings Corp. | 8 | 3 of 8 |
| Stateline Construction, LLC | 8 | 7 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 NOV 2026 | A00204003 | Bryan District | Bridge Replacement, COUNTY ROAD 244 (ON CR 244 (FCR 344) to AT DEEP CREEK) | 15 of 15 | $1,415,641 | +96% |
| 03 SEP 2026 | A00189990 | Bryan District | Bridge Replacement, BETHEL CEMETERY RD (ON CR 444 (BETHEL CEMETERY RD, F-CR 231) to AT BEDIAS CREEK) | 1 of 7 | $1,143,373 | Low, 0.0% under the second |
| 02 DEC 2025 | A00124687 | Bryan District | Bridge Replacement, FM 2039 (AT PORTER CREEK to .) | 9 of 9 | $4,259,517 | +84% |
| 05 NOV 2025 | A00135986 | Bryan District | Bridge Replacement, SH 105 (AT JACKSON CREEK to .) | 12 of 12 | $4,646,509 | +65% |
| 04 JUN 2025 | A00130805 | Yoakum District | Bridge Replacement, GEBHARD RD (AT HAW CREEK to STR#AA04-89-001) | 8 of 10 | $1,598,110 | +37% |
| 04 MAR 2025 | A00180383 | Bryan District | Drainage Improvements, SH 30 (CR 171 to 0.1 Mi E of FM 244) | 8 of 9 | $1,499,778 | +57% |
| 12 FEB 2025 | A00213842 | Bryan District | ROCK/RIPRAP, SH0036 (Various to Various) | 4 of 4 | $465,975 | +62% |
| 07 JAN 2025 | A00188286 | Yoakum District | Bridge Replacement, FRANTZ RD (AT SAN BERNARD RIVER to STR# AA52-06-001 (FRANTZ RD)) | 2 of 9 | $1,841,526 | +6.0% |
| 06 NOV 2024 | A00190497 | Bryan District | Bicycle And Pedestrian Improvements, SH 105 (Third Street to Seventh Street) | 6 of 8 | $1,179,000 | +51% |
| 09 JUL 2024 | 07243019 | Bryan District | FM 80 Bridge replacement from AT SANDERS CREEK | 7 of 7 | $4,546,105 | +64% |
| 05 JUN 2024 | 06243039 | Bryan District | CR Bridge replacement from ON CR 232 (LOCAL ROAD 146) to AT BIRCH CREEK | 4 of 6 | $1,398,000 | +16% |
| 03 MAY 2024 | 05243240 | Bryan District | CR Bridge replacement from CR 443 AT BUSHY CREEK | 10 of 10 | $1,710,200 | +76% |
| 02 MAY 2024 | 05243043 | Bryan District | VA Bridge maintenance from VARIOUS LOCATIONS | 8 of 8 | $447,539 | +158% |
| 01 FEB 2024 | 02243045 | Yoakum District | CR Bridge replacement from AT MILL CREEK to STR # AA03-66-003 (MILL CREEK RD) | 5 of 6 | $5,402,387 | +34% |
| 03 AUG 2023 | 08233268 | Bryan District | CS Bridge replacement from ON CR 10 (WEST WHARTON CREEK ST) to AT TIDEWELL CREEK | 1 of 4 | $663,959 | Low, 3.0% under the second |
| 02 AUG 2023 | 08233034 | Bryan District | CR Bridge replacement from ON CR 201 to AT MILL CREEK | 4 of 6 | $2,476,792 | +9.0% |
| 02 AUG 2023 | 08233050 | Bryan District | CR Bridge replacement from HIGHLAND DRIVE AT HARMON CREEK | 4 of 5 | $1,070,638 | +29% |
| 02 AUG 2023 | 08233052 | Bryan District | CS Construct pedestrian infrastructure from SH 105 to FM 3090 | 1 of 6 | $854,655 | Low, 1.0% under the second |
| 28 JUN 2023 | 06233614 | Bryan District | FM 27 Bridge replacement from AT GRINDSTONE CREEK | 3 of 4 | $6,308,232 | +12% |
| 08 MAR 2023 | 03233228 | Yoakum District | CR Bridge replacement from AT BRUSHY BRANCH to STR# AA01-14-001 (BOEHNKE RD) | 8 of 8 | $3,643,694 | +40% |
| 07 MAR 2023 | 03233031 | Bryan District | CR Bridge replacement from ON CR 255 (LOCAL ROAD 301) to AT OAK BRANCH | 2 of 4 | $1,026,885 | +9.0% |
| 03 NOV 2022 | 11223224 | Yoakum District | CR Bridge replacement from AT PIN OAK BRANCH to STR#AA03-80-001(TEINERT RD) | 6 of 8 | $1,497,000 | +12% |
| 29 JUN 2022 | 06223433 | Bryan District | SH 7 Bridge maintenance from AT NAVASOTA RIVER | 5 of 5 | $1,441,453 | +119% |
| 05 MAY 2022 | 05223227 | Yoakum District | CR Bridge replacement from AT DRAW to STR# AA03-13-002 (KIEMSTEADT RD) | 1 of 5 | $1,258,244 | Low, 24% under the second |
| 07 APR 2022 | 04223226 | Bryan District | CR Bridge replacement from ON CR 215 (LCR 120) to BIG ELM CREEK | 2 of 6 | $530,615 | +3.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.