TxDOT contract A00206896 bid tabulation
Construct Pedestrian Infrastructure, Various (First St/Railroad St (Adjacent to SH 71) to Main St/North Liberty St (on BU 59S)). Let by Texas DOT on June 5, 2025, Wharton, Yoakum District. 6 bids received; low bid $2,130,273 by Ti-Zack Concrete, LLC, -17% against the engineer's estimate of $2,558,831.
- Owner
- Texas DOT
- Letting
- 05 JUN 2025
- Pay items
- 83
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ti-Zack Concrete, LLC | $2,130,273 | Low | -17% |
| 2 | STX Civil | $2,142,704 | +1.0% | -16% |
| 3 | Encino Landscape, Inc. | $2,205,475 | +4.0% | -14% |
| 4 | C. E. Barker, LTD. | $2,573,814 | +21% | +1.0% |
| 5 | Grey Sky Construction LLC | $2,737,622 | +29% | +7.0% |
| 6 | Texas Steel Industrial Placing, LLC | $3,182,905 | +49% | +24% |
Engineer's estimate: $2,558,831.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Ti-Zack Concrete, LLC | 2. STX Civil | 3. Encino Landscape, Inc. | 4. C. E. Barker, LTD. | 5. Grey Sky Construction LLC | 6. Texas Steel Industrial Placing, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 19 | $1,000.00 | $110.00 | $4,976.00 | $500.00 | $13,000 | $12,500 | $6,500.00 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 1,489 | $28.00 | $24.99 | $18.00 | $20.00 | $71.29 | $30.00 | $50.00 |
| 3 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 799 | $68.00 | $23.29 | $16.00 | $20.00 | $49.38 | $30.00 | $50.00 |
| 4 | Removing concrete (curb or curb & gutter) (104-7018) | LF | 2,734 | $21.00 | $9.07 | $8.50 | $15.00 | $49.38 | $30.00 | $30.00 |
| 5 | Removing concrete (gutter) (104-7019) | LF | 429 | $5.00 | $7.23 | $8.50 | $15.00 | $49.38 | $30.00 | $30.00 |
| 6 | Removing concrete (miscellaneous) (104-7046) | SY | 54 | $75.00 | $34.45 | $21.00 | $30.00 | $107.81 | $30.00 | $30.00 |
| 7 | Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002) | SY | 1,214 | $100.00 | $27.80 | $24.00 | $20.00 | $35.51 | $30.00 | $20.00 |
| 8 | Block sodding (162-7002) | SY | 62 | $10.00 | $11.00 | $7.00 | $10.00 | $13.91 | $10.00 | $20.00 |
| 9 | Broadcast seed (permanent_rural_clay) (164-7002) | SY | 23 | $4.60 | $3.30 | $7.00 | $10.00 | $6.96 | $10.00 | $5.00 |
| 10 | Vegetative watering (168-7001) | TGL | 0.73 | $55.00 | $1.10 | $321.00 | $200.00 | $86.94 | $50.00 | $500.00 |
| 11 | Rdside amenity (wheel stop) (194-7007) | EACH | 12 | $185.00 | $385.00 | $160.00 | $500.00 | $417.31 | $250.00 | $200.00 |
| 12 | Flexible pavement structure repair(12") (351-7011) | SY | 400 | $100.00 | $110.00 | $128.00 | $300.00 | $417.31 | $150.00 | $175.00 |
| 13 | Cut & restoring pavement (400-7006) | SY | 109 | $186.00 | $110.00 | $188.00 | $300.00 | $205.36 | $200.00 | $200.00 |
| 14 | Trench excavation protection (402-7001) | LF | 940 | $30.00 | $0.01 | $36.00 | $1.00 | $6.96 | $10.00 | $25.00 |
| 15 | Temporary special shoring (403-7001) | SF | 384 | $60.00 | $25.00 | $43.00 | $1.00 | $6.96 | $85.00 | $70.00 |
| 16 | Riprap (concrete)(4 in) (432-7001) | CY | 60 | $850.00 | $828.82 | $781.00 | $800.00 | $2,872.50 | $550.00 | $850.00 |
| 17 | Riprap (concrete)(CL B)(5 in) (432-7008) | CY | 11 | $600.00 | $828.82 | $834.00 | $900.00 | $2,872.50 | $650.00 | $850.00 |
| 18 | Rail (type C221) (450-7032) | LF | 53 | $250.00 | $500.00 | $227.00 | $200.00 | $290.16 | $185.00 | $200.00 |
| 19 | Rail (handrail)(type B) (450-7059) | LF | 233 | $210.00 | $123.00 | $225.00 | $100.00 | $226.39 | $185.00 | $200.00 |
| 20 | Concrete box culvert (6 FT X 5 FT)(extend) (462-7068) | LF | 9 | $750.00 | $1,602.21 | $1,285.00 | $3,000.00 | $2,199.70 | $2,000.00 | $3,000.00 |
| 21 | RC pipe (CL III)(24 in) (464-7005) | LF | 20 | $110.00 | $318.28 | $136.00 | $150.00 | $475.92 | $150.00 | $125.00 |
| 22 | RC pipe (CL III)(30 in) (464-7007) | LF | 17 | $140.00 | $371.74 | $176.00 | $200.00 | $578.08 | $250.00 | $200.00 |
| 23 | Wingwall (PW - 1) (HW=8 FT) (466-7178) | EACH | 1 | $25,000 | $57,298 | $32,650 | $5,000.00 | $27,821 | $55,000 | $50,000 |
| 24 | Set (type II) (12 in) (RCP) (4: 1) (C) (467-7290) | EACH | 1 | $2,000.00 | $1,120.57 | $1,025.00 | $1,000.00 | $5,251.18 | $1,850.00 | $3,000.00 |
| 25 | Adjusting manholes (479-7001) | EACH | 3 | $3,000.00 | $620.16 | $1,340.00 | $2,000.00 | $4,214.21 | $2,500.00 | $1,500.00 |
| 26 | Adjusting inlets (479-7002) | EACH | 8 | $3,000.00 | $775.20 | $1,180.00 | $2,500.00 | $2,921.18 | $5,000.00 | $3,500.00 |
| 27 | Clean existing culverts (480-7001) | EACH | 2 | $3,500.00 | $5,256.48 | $5,890.00 | $2,000.00 | $4,707.07 | $5,000.00 | $3,000.00 |
| 28 | Removing structure (pipe) (496-7007) | LF | 32 | $30.00 | $37.04 | $27.00 | $20.00 | $58.42 | $50.00 | $20.00 |
| 29 | Mobilization (500-7001) | LS | 1 | $269,446 | $221,098 | $160,000 | $450,000 | $225,000 | $250,000 | $318,000 |
| 30 | Barricades, signs and traffic handling (502-7001) | MO | 11 | $4,000.00 | $9,000.00 | $2,260.00 | $3,000.00 | $8,381.02 | $15,000 | $4,500.00 |
| 31 | TMA (stationary) (505-7001) | DAY | 20 | $500.00 | $1.10 | $1.00 | $300.00 | $1,219.64 | $250.00 | $300.00 |
| 32 | Rock filter dams (remove) (506-7011) | LF | 30 | $30.00 | $1.10 | $27.00 | $1.00 | $16.93 | $20.00 | $20.00 |
| 33 | Sandbags for erosion control (506-7035) | EACH | 76 | $14.00 | $1.10 | $1.00 | $10.00 | $21.91 | $10.00 | $10.00 |
| 34 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 335 | $10.00 | $0.11 | $0.10 | $10.00 | $13.91 | $18.00 | $10.00 |
| 35 | Biodegradable erosion control logs (remove) (506-7046) | LF | 335 | $3.00 | $0.11 | $0.10 | $1.00 | $6.96 | $9.00 | $2.00 |
| 36 | Rock filter dams (install) (type 2) 6:1 (506-7048) | LF | 30 | $70.00 | $1.10 | $58.00 | $50.00 | $83.46 | $50.00 | $70.00 |
| 37 | Concrete curb (type II) (529-7002) | LF | 86 | $35.00 | $61.79 | $54.00 | $20.00 | $41.04 | $65.00 | $50.00 |
| 38 | Concrete curb & gutter (type II) (529-7009) | LF | 3,011 | $90.00 | $61.79 | $54.00 | $40.00 | $26.43 | $65.00 | $50.00 |
| 39 | Concrete curb (type C1) (529-7016) | LF | 46 | $80.00 | $226.55 | $176.00 | $175.00 | $41.73 | $95.00 | $200.00 |
| 40 | Concrete curb (type F1) (529-7017) | LF | 77 | $95.00 | $302.07 | $176.00 | $150.00 | $41.73 | $100.00 | $200.00 |
| 41 | Driveways (concrete) (530-7006) | SY | 2,290 | $150.00 | $134.12 | $101.00 | $100.00 | $36.51 | $85.00 | $140.00 |
| 42 | Driveways (concrete) (hes) (530-7007) | SY | 146 | $175.00 | $137.79 | $107.00 | $150.00 | $36.51 | $125.00 | $140.00 |
| 43 | Concrete sidewalks (5") (531-7002) | SY | 3,025 | $150.00 | $127.79 | $96.00 | $100.00 | $95.63 | $70.00 | $125.00 |
| 44 | Curb ramps (type 7) (531-7020) | SY | 204 | $450.00 | $143.39 | $204.00 | $140.00 | $77.38 | $650.00 | $350.00 |
| 45 | Curb ramps (type 10) (531-7021) | SY | 54 | $220.00 | $143.39 | $204.00 | $140.00 | $77.38 | $650.00 | $350.00 |
| 46 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 5,720 | $11.00 | $14.41 | $15.00 | $16.00 | $18.22 | $20.00 | $33.00 |
| 47 | Conduit (PVC) (schedule 40) (4") (bore) (618-7041) | LF | 65 | $26.00 | $31.81 | $31.00 | $35.00 | $40.23 | $100.00 | $55.00 |
| 48 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 590 | $10.50 | $25.96 | $25.00 | $30.00 | $32.83 | $25.00 | $43.00 |
| 49 | Electrical conductor (no.8) bare (620-7007) | LF | 105 | $2.00 | $2.51 | $250.00 | $4.00 | $3.17 | $3.00 | $4.00 |
| 50 | Ground box type A (122311) (624-7001) | EACH | 1 | $1,200.00 | $1,245.05 | $1,215.00 | $1,500.00 | $1,574.46 | $1,150.00 | $2,000.00 |
| 51 | Ground box type A (122311)W/apron (624-7002) | EACH | 5 | $1,500.00 | $1,453.52 | $1,420.00 | $1,600.00 | $1,838.09 | $1,500.00 | $1,500.00 |
| 52 | Ground box type D (162922)W/apron (624-7008) | EACH | 2 | $1,460.00 | $1,523.01 | $1,482.00 | $1,600.00 | $1,925.96 | $1,500.00 | $1,500.00 |
| 53 | Elc SRV type D 120/240 060(NS)GS(N)EX(O) (628-7131) | EACH | 1 | $10,000 | $3,299.37 | $3,210.00 | $4,000.00 | $4,172.33 | $12,500 | $10,000 |
| 54 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 4 | $1,000.00 | $495.00 | $800.00 | $1,750.00 | $1,354.79 | $1,150.00 | $1,000.00 |
| 55 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 3 | $1,000.00 | $605.00 | $642.00 | $750.00 | $822.19 | $1,150.00 | $1,000.00 |
| 56 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 5 | $1,030.00 | $495.00 | $515.00 | $500.00 | $1,279.05 | $1,150.00 | $1,000.00 |
| 57 | Remove SM RD SN sup&AM (644-7073) | EACH | 7 | $200.00 | $55.00 | $145.00 | $100.00 | $180.84 | $500.00 | $100.00 |
| 58 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 48 | $17.50 | $44.00 | $86.00 | $30.00 | $87.29 | $20.00 | $90.00 |
| 59 | Install highway traffic signal (isolated) (680-7002) | EACH | 1 | $18,000 | $10,418 | $10,200 | $11,000 | $13,175 | $35,000 | $21,000 |
| 60 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 2 | $690.00 | $943.62 | $920.00 | $1,000.00 | $1,193.29 | $6,500.00 | $600.00 |
| 61 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 160 | $2.00 | $2.92 | $3.50 | $3.00 | $3.69 | $3.00 | $3.50 |
| 62 | Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079) | LF | 150 | $1.45 | $2.63 | $2.50 | $3.00 | $3.32 | $3.00 | $3.50 |
| 63 | Pedestrian pole assembly (687-7001) | EACH | 2 | $2,150.00 | $2,204.36 | $2,150.00 | $2,500.00 | $2,787.59 | $4,500.00 | $5,000.00 |
| 64 | Pedestrian detect push button (APS) (688-7001) | EACH | 2 | $760.00 | $895.64 | $880.00 | $1,000.00 | $1,132.61 | $1,850.00 | $1,500.00 |
| 65 | Pedestrian detector controller unit (688-7003) | EACH | 1 | $3,500.00 | $3,911.09 | $3,810.00 | $5,000.00 | $4,945.90 | $6,500.00 | $5,500.00 |
| 66 | Spot tree trimming / brush removal (752-7002) | LF | 95 | $200.00 | $27.50 | $110.00 | $200.00 | $76.87 | $100.00 | $45.00 |
| 67 | Water main pipe (PVC)(2 in ) (7045-7001) | LF | 21 | $225.00 | $102.27 | $65.00 | $100.00 | $30.00 | $60.00 | $350.00 |
| 68 | Water main pipe (PVC)(C900)(6 in) (7045-7002) | LF | 22 | $80.00 | $111.39 | $145.00 | $200.00 | $50.00 | $85.00 | $350.00 |
| 69 | Water main pipe (PVC)(C900)(8 in) (7045-7003) | LF | 897 | $80.00 | $99.81 | $170.00 | $250.00 | $65.00 | $100.00 | $225.00 |
| 70 | Fire hydrant assembly (7045-7004) | EACH | 3 | $7,000.00 | $9,290.13 | $30,500 | $5,000.00 | $8,500.00 | $12,500 | $8,500.00 |
| 71 | Waterline removal (all sizes/materials) (7045-7005) | LF | 902 | $10.00 | $34.08 | $80.00 | $10.00 | $15.00 | $50.00 | $200.00 |
| 72 | Casing (steel)(18 in)(open cut) (7045-7006) | LF | 72 | $300.00 | $217.68 | $250.00 | $200.00 | $80.00 | $450.00 | $600.00 |
| 73 | Temporary blow off valve (2 in) (7045-7007) | EACH | 2 | $1,500.00 | $2,562.16 | $3,425.00 | $1,000.00 | $1,800.00 | $6,500.00 | $4,000.00 |
| 74 | Connect to existing water line (2 in) (7045-7008) | EACH | 3 | $1,500.00 | $2,350.99 | $5,200.00 | $2,000.00 | $500.00 | $1,500.00 | $3,000.00 |
| 75 | Connect to existing water line (6 in) (7045-7009) | EACH | 3 | $5,000.00 | $3,134.65 | $7,000.00 | $3,000.00 | $1,200.00 | $3,500.00 | $3,000.00 |
| 76 | Gate valve W box (2 in) (7045-7010) | EACH | 3 | $1,500.00 | $1,725.32 | $2,140.00 | $500.00 | $650.00 | $6,500.00 | $9,500.00 |
| 77 | Gate valve W box (6 in) (7045-7011) | EACH | 1 | $2,000.00 | $4,516.13 | $3,585.00 | $1,500.00 | $1,500.00 | $7,500.00 | $9,500.00 |
| 78 | Gate valve W box (8 in) (7045-7012) | EACH | 4 | $2,500.00 | $4,687.10 | $4,495.00 | $2,000.00 | $2,200.00 | $8,500.00 | $9,500.00 |
| 79 | Remove water valve and box (7045-7013) | EACH | 2 | $350.00 | $521.11 | $642.00 | $500.00 | $350.00 | $1,500.00 | $7,500.00 |
| 80 | Service line(short side 3/4 in to 2 in) (7045-7014) | EACH | 7 | $1,500.00 | $2,412.00 | $1,658.00 | $1,000.00 | $1,800.00 | $4,500.00 | $5,000.00 |
| 81 | Cut and plug water main (2 in) (7045-7015) | EACH | 6 | $500.00 | $642.88 | $1,284.00 | $1,000.00 | $250.00 | $1,500.00 | $2,000.00 |
| 82 | Cut and plug water main (6 in) (7045-7016) | EACH | 4 | $2,000.00 | $1,201.31 | $1,712.00 | $1,500.00 | $350.00 | $2,500.00 | $4,000.00 |
| 83 | Removing(abatement)of asbestos-cement pipe (7045-7017) | LF | 926 | $60.00 | $30.00 | $38.50 | $25.00 | $212.13 | $100.00 | $125.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 5, 2025. Compiled by Mirage Metrics.