D&G Energy Corporation: TxDOT bid record
D&G Energy Corporation submitted 24 bids on Texas DOT contracts in the data, from 04 FEB 2021 to 06 NOV 2024, and was the low bidder on 7 of them (29%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $8,791,109
- Latest bid
- 06 NOV 2024
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 5 | 1 | 20% |
| 2022 | 5 | 2 | 40% |
| 2023 | 12 | 4 | 33% |
| 2024 | 2 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| San Antonio District | 13 | 4 | 31% |
| Pharr District | 8 | 1 | 13% |
| Corpus Christi District | 2 | 1 | 50% |
| Laredo District | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Electrical conductor (no.6) bare | 620-7009 | LF | 17 | 13 (76%) | $1.40 | $2.10 |
| Electrical conductor (no.6) insulated | 620-7010 | LF | 16 | 12 (75%) | $1.55 | $2.50 |
| Remove SM RD SN sup&AM | 644-7073 | EACH | 16 | 10 (63%) | $112.50 | $110.00 |
| Pedestrian signal section (LED)(countdown) | 682-7018 | EACH | 15 | 9 (60%) | $540.00 | $728.00 |
| Tray cable (4 conductor) (12 AWG) | 621-7006 | LF | 15 | 9 (60%) | $2.25 | $2.65 |
| Aluminum signs (type A) | 636-7001 | SF | 11 | 9 (82%) | $26.00 | $35.00 |
| Drilled shaft (traffic signal pole) (36 in) | 416-7044 | LF | 17 | 8 (47%) | $265.00 | $380.00 |
| Electrical conductor (no.8) bare | 620-7007 | LF | 11 | 8 (73%) | $1.20 | $1.92 |
| Pedestrian pole assembly | 687-7001 | EACH | 15 | 7 (47%) | $1,850.00 | $2,645.95 |
| Conduit (PVC) (schedule 80) (3") | 618-7060 | LF | 11 | 7 (64%) | $21.00 | $21.50 |
| Backplate W/reflectorized border(3 sec) | 682-7054 | EACH | 11 | 7 (64%) | $95.00 | $155.49 |
| TMA (stationary) | 505-7001 | DAY | 23 | 6 (26%) | $150.00 | $230.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| The Levy Company, Inc. | 20 | 7 of 20 |
| E-Z Bel Construction, LLC | 16 | 8 of 16 |
| Traf-Tex, Inc. | 10 | 2 of 10 |
| Austin Traffic Signal Construction Co., Inc. | 7 | 5 of 7 |
| Vaca Underground Utilities Inc | 5 | 3 of 5 |
| Maldonado-Burkett, LLP | 4 | 1 of 4 |
| Elecnor Belco Electric, Inc. | 4 | 2 of 4 |
| Florida Traffic Control Devices, Inc. | 3 | 1 of 3 |
| Third Coast Services LLC | 2 | 0 of 2 |
| Triple H Field Services, LLC | 2 | 0 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 06 NOV 2024 | A00190025 | San Antonio District | Traffic Signal Improvements, Various (Various Locations in City of San Antonio to .) | 4 of 8 | $1,437,500 | +29% |
| 05 JUN 2024 | 06243055 | Pharr District | US 83 Hazard elimination & safety from 0.3 MILES E. OF FM 3167 to 0.2 MILES W. OF RIVER RD. | 4 of 4 | $584,907 | +15% |
| 06 DEC 2023 | 12233220 | San Antonio District | SH 16 Hazard elimination & safety from REINDEER TRAIL to WURZBACH RD | 1 of 5 | $452,898 | Low, 6.0% under the second |
| 06 DEC 2023 | 12233227 | Laredo District | VA Install/upgrade roadway lighting from DISTRICTWIDE | 1 of 6 | $663,050 | Low, 11% under the second |
| 28 JUN 2023 | 06233640 | Pharr District | US 281 Hazard elimination & safety from AT CALLE PLUTON / CAPT. BASLER | 2 of 4 | $935,415 | +1.0% |
| 28 JUN 2023 | 06233644 | Pharr District | FM 1925 Hazard elimination & safety from M RD/GWIN RD | 3 of 4 | $400,922 | +16% |
| 28 JUN 2023 | 06233645 | San Antonio District | IH 37 Hazard elimination & safety from SOUTHTON RD to IH 410 | 5 of 7 | $527,100 | +15% |
| 28 JUN 2023 | 06233646 | Pharr District | CS Hazard elimination & safety from CESAR CHAVEZ RD. to @ RIDGE RD. | 3 of 4 | $357,305 | +16% |
| 28 JUN 2023 | 06233647 | Pharr District | CS Hazard elimination & safety from 0.1 MILES WEST OF MON MACK RD. to 0.1 MILES EAST OF MON MACK RD. | 2 of 3 | $248,596 | +11% |
| 27 JUN 2023 | 06233446 | Corpus Christi District | SH 359 Hazard elimination & safety from 700 FT N OF FM 1091 to 700 FT S OF FM 1091 | 1 of 5 | $1,046,002 | Low, 21% under the second |
| 01 JUN 2023 | 06233017 | Pharr District | FM 2221 Hazard elimination & safety from 0.1 MILES W. OF QUEEN PALM DR. to 0.1 MILES E. OF QUEEN PALM DR. | 2 of 4 | $823,689 | +3.0% |
| 01 JUN 2023 | 06233050 | Corpus Christi District | UA 281 Traffic signal improvements from ON UA281 .5 MI N OF FM99 to .5 MI S OF FM99 | 2 of 6 | $152,232 | +3.0% |
| 04 MAY 2023 | 05233010 | Pharr District | US 83 Install traffic signal from 0.1 MILES W. OF SUNTEX RD./MIDWAY R to 0.1 MILES W. OF SUNTEX RD./MIDWAY R | 2 of 2 | $345,450 | +15% |
| 07 MAR 2023 | 03233019 | San Antonio District | IH 10 Hazard elimination & safety from IH 37 to IH 410 | 1 of 7 | $1,631,615 | Low, 8.0% under the second |
| 03 AUG 2022 | 08223031 | Pharr District | FM 907 Traffic signal improvements from 0.1 MILES NORTH OF MILE 17 1/2 N. R to 0.1 MILES SOUTH OF MILE 17 1/2 N RD | 1 of 5 | $1,313,573 | Low, 6.0% under the second |
| 30 JUN 2022 | 06223623 | San Antonio District | CR Hazard elimination & safety from IN BEXAR COUNTY ON N FOSTER RD to AT CANDLE MEADOW | 2 of 3 | $1,935,756 | +13% |
| 29 JUN 2022 | 06223422 | San Antonio District | CS Hazard elimination & safety from ON CASTROVILLE RD AT CUPPLES RD | 1 of 3 | $2,074,272 | Low, 7.0% under the second |
| 04 MAR 2022 | 03223215 | San Antonio District | CS Hazard elimination & safety from IN NEW BRAUNFELS ON HANZ DR to AT GRUENE RD | 2 of 4 | $725,479 | +15% |
| 03 FEB 2022 | 02223007 | San Antonio District | VA Traffic signal improvements from DISTRICTWIDE TRAFFIC CONTROL FY 202 | 3 of 4 | $1,769,460 | +24% |
| 04 AUG 2021 | 08213039 | San Antonio District | CS Hazard elimination & safety from ON SAN PEDRO AVE AT JACKSON KELLER | 2 of 3 | $1,595,584 | +7.0% |
| 04 AUG 2021 | 08213053 | San Antonio District | US 181 Install flash beacon/sfty lighting @ intersection from AT KILOWATT RD | 3 of 3 | $428,191 | +4.0% |
| 01 JUL 2021 | 07213034 | San Antonio District | VA Traffic signal improvements from VARIOUS LOCATIONS DISTRICTWIDE | 4 of 5 | $1,669,376 | +21% |
| 08 APR 2021 | 04213225 | San Antonio District | VA Traffic signal improvements from DISTRICTWIDE TRAFFIC CNTRL FY 2021 | 1 of 4 | $1,609,699 | Low, 4.0% under the second |
| 04 FEB 2021 | 02213020 | San Antonio District | VA Districtwide non-site specific traf signals-fy202 from DISTRICTWIDE TRAFFIC CNTRL FY 2021 | 2 of 3 | $1,672,295 | +3.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.