Del Mar Contracting, Inc.: TxDOT bid record
Del Mar Contracting, Inc. submitted 30 bids on Texas DOT contracts in the data, from 10 JAN 2020 to 01 FEB 2024, and was the low bidder on 3 of them (10%). When it was not low, its total sat a median +24% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $2,533,831
- Latest bid
- 01 FEB 2024
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 9 | 0 | 0% |
| 2021 | 14 | 2 | 14% |
| 2022 | 3 | 1 | 33% |
| 2023 | 2 | 0 | 0% |
| 2024 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| TMA (stationary) | 505-7001 | DAY | 26 | 11 (42%) | $170.00 | $230.00 |
| Biodegradable erosion control logs (install) (8") | 506-7043 | LF | 17 | 9 (53%) | $3.50 | $6.00 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 13 | 7 (54%) | $4.40 | $5.00 |
| Remove SM RD SN sup&AM | 644-7073 | EACH | 14 | 5 (36%) | $140.00 | $110.00 |
| Reflectorized pavement marker type II-C-R | 672-7006 | EACH | 12 | 5 (42%) | $4.38 | $5.00 |
| TMA (mobile operation) | 505-7003 | DAY | 8 | 5 (63%) | $357.50 | $291.17 |
| Conduit (PVC) (schedule 40) (2") | 618-7030 | LF | 8 | 5 (63%) | $19.72 | $15.00 |
| Reflectorized pavement marking type II (W) 24" (solid) | 666-6182-007 | LF | 8 | 5 (63%) | $2.92 | $3.60 |
| Reflectorized pavement marker type I-C | 672-7002 | EACH | 7 | 5 (71%) | $4.40 | $5.00 |
| Ground box type A (122311)W/apron | 624-7002 | EACH | 7 | 5 (71%) | $1,334.00 | $1,271.50 |
| Temporary sediment control fence (install) | 506-7039 | LF | 14 | 4 (29%) | $3.00 | $4.00 |
| Install small roadside sign support and assembly type 10BWG(1)SA(P) | 644-7001 | EACH | 14 | 4 (29%) | $762.50 | $710.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| International Eagle Enterprises, Inc. | 20 | 16 of 20 |
| Dan Williams Company | 19 | 6 of 19 |
| Lesna Construction, Inc. | 14 | 12 of 14 |
| J.D. Abrams, L.P. | 12 | 9 of 12 |
| Synergy Project Contractors, Inc. | 12 | 8 of 12 |
| Double H Contracting Inc. | 11 | 5 of 11 |
| J. A. R. Concrete, Inc. | 10 | 10 of 10 |
| Allied Paving Co. | 6 | 5 of 6 |
| Martinez Bros. Contractors, LLC | 6 | 6 of 6 |
| Horizone Construction I, LTD | 5 | 3 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 FEB 2024 | 02243040 | El Paso District | VA Preventive maintenance from EL PASO COUNTYWIDE | 2 of 4 | $461,140 | +1.0% |
| 01 FEB 2024 | 02244018 | El Paso District | IH0010 Flexible pavement structure repair from VARIOUS LOCATIONS to VARIOUS LOCATIONS | 2 of 4 | $1,198,050 | +5.0% |
| 27 JUN 2023 | 06233431 | El Paso District | SH 20 Construct pedestrian infrastructure from LP 375 to FM 1281 | 3 of 5 | $1,893,310 | +26% |
| 01 JUN 2023 | 06233044 | El Paso District | CR Hazard elimination & safety from (ON ACENSION RD) KENTWOOD AVE to HORIZON BLVD | 2 of 6 | $898,922 | +23% |
| 03 AUG 2022 | 08223030 | El Paso District | US 54 Hazard elimination & safety from 0.22 MI SW OF STATE LINE RD to 0.015 MI NE OF STATE LINE RD | 1 of 6 | $2,140,781 | Low, 2.0% under the second |
| 30 JUN 2022 | 06224605 | El Paso District | IH0010 Culvert cleaning from VARIOUS LOCATIONS to VARIOUS LOCATIONS | 2 of 3 | $443,475 | +2.0% |
| 04 MAR 2022 | 03223217 | El Paso District | VA Preventive maintenance from COUNTYWIDE | 2 of 10 | $538,756 | +11% |
| 02 JUL 2021 | 07213212 | El Paso District | SL 375 Surfacing/roadway restoration from 0.63 MI E OF US 54 to US 62 RAMPS | 7 of 8 | $5,179,832 | +34% |
| 02 JUL 2021 | 07213223 | El Paso District | US 62 Hazard elimination & safety from 3.707 MI W OF FM 1437 to CULBERSON CL | 4 of 5 | $3,606,057 | +26% |
| 01 JUL 2021 | 07213018 | El Paso District | SH 20 Hazard elimination & safety from 0.598 MI N OF SH 178 to 0.753 MI S OF PA 2401 | 4 of 6 | $3,008,105 | +24% |
| 08 JUN 2021 | 06212401 | El Paso District | IH0010 Culvert & storm sewer cleaning from VARIOUS LOCATIONS to VARIOUS LOCATIONS | 1 of 1 | $163,500 | Low |
| 08 JUN 2021 | 06212402 | El Paso District | IH0010 Culvert & storm sewer cleaning from VARIOUS LOCATIONS to VARIOUS LOCATIONS | 1 of 2 | $229,550 | Low, 12% under the second |
| 04 JUN 2021 | 06213207 | El Paso District | FM 1281 Hazard elimination & safety from FM 76 to 1.194 MI N OF IH 10 | 3 of 3 | $6,233,478 | +21% |
| 03 JUN 2021 | 06213023 | El Paso District | US 62 Hazard elimination & safety from AIRWAY BLVD to SAM MOORE PL | 5 of 5 | $1,489,481 | +6.0% |
| 06 MAY 2021 | 05213207 | El Paso District | IH 10 Hazard elimination & safety from SH 17 to BREWSTER CL | 6 of 10 | $5,084,796 | +24% |
| 06 MAY 2021 | 05213210 | El Paso District | SH 20 Surfacing/roadway restoration from 0.25 MI S OF SL 375 to 2.256 MI S OF SL 375 | 3 of 5 | $3,058,606 | +17% |
| 05 MAY 2021 | 05213011 | El Paso District | IH 10 Hazard elimination & safety from 19.02 MI E OF RM 1111 to 4.73 MI W OF US 90 | 4 of 10 | $6,556,171 | +24% |
| 05 MAY 2021 | 05213016 | El Paso District | FM 1905 Reconstruct existing roadway from SH 20 (S MAIN ST) to I-10 | 3 of 3 | $2,871,186 | +33% |
| 08 APR 2021 | 04213218 | El Paso District | US 62 Hazard elimination & safety from 3.707 MI W OF FM 1437 to CULBERSON CL | 5 of 5 | $3,551,615 | +63% |
| 08 APR 2021 | 04213223 | El Paso District | FM 2529 Hazard elimination & safety from 0.536 MI S OF US 54 to BU 54-A | 5 of 6 | $2,103,608 | +34% |
| 04 FEB 2021 | 02213033 | El Paso District | VA Replace guardrail from DISTRICTWIDE | 6 of 8 | $597,172 | +27% |
| 03 DEC 2020 | 12203213 | El Paso District | US 54 Modify existing ramps, signing & pavement marking from FM 3255 (MARTIN LUTHER KING BLVD) to SEAN HAGGERTY | 7 of 8 | $2,024,889 | +23% |
| 02 DEC 2020 | 12203012 | El Paso District | IH 10 Installation of concrete traffic barrier from EXECUTIVE CENTER BLVD to 0.35 MI W OF SS 1966 | 7 of 8 | $2,651,661 | +21% |
| 05 AUG 2020 | 08203045 | El Paso District | FM 192 Installation of box culvert and roadway approache from 0.726 MI W OF FM 2217 to INTERSECTION OF FM 2217/FM 192 | 5 of 7 | $579,733 | +37% |
| 09 JUL 2020 | 07203238 | El Paso District | IH 10 Green ribbon landscape improvement from 0.20 MI W OF MESA STREET to 0.70 MI E OF SUNLAND PARK DR | 7 of 7 | $1,279,252 | +152% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.