Lesna Construction, Inc.: TxDOT bid record
Lesna Construction, Inc. submitted 32 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 04 JAN 2024, and was the low bidder on 9 of them (28%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $64,059,369
- Latest bid
- 04 JAN 2024
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 9 | 2 | 22% |
| 2021 | 14 | 5 | 36% |
| 2022 | 2 | 0 | 0% |
| 2023 | 5 | 2 | 40% |
| 2024 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 23 | 19 (83%) | $0.50 | $1.40 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 17 | 15 (88%) | $0.75 | $1.00 |
| TMA (stationary) | 505-7001 | DAY | 31 | 14 (45%) | $175.00 | $230.00 |
| Metal W-beam guard fence (steel post) | 540-7002 | LF | 13 | 7 (54%) | $30.00 | $33.00 |
| TMA (mobile operation) | 505-7003 | DAY | 12 | 6 (50%) | $350.00 | $291.17 |
| Aggregate(type-PB GR-4 sac-B) | 316-6224-002 | CY | 7 | 6 (86%) | $115.00 | $150.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 32 | 5 (16%) | $10,500 | $5,000.00 |
| Remove delin & object marker assms | 658-7078 | EACH | 9 | 5 (56%) | $20.00 | $24.00 |
| Flowable backfill | 401-7001 | CY | 8 | 5 (63%) | $170.00 | $350.00 |
| Crash cushion attenuator (remove) | 545-7004 | EACH | 6 | 5 (83%) | $650.00 | $1,000.00 |
| Install small roadside sign support and assembly type 10BWG(1)SA(T) | 644-7004 | EACH | 16 | 4 (25%) | $780.00 | $825.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 13 | 4 (31%) | $3,050.00 | $3,245.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Dan Williams Company | 29 | 13 of 29 |
| International Eagle Enterprises, Inc. | 24 | 11 of 24 |
| J.D. Abrams, L.P. | 17 | 8 of 17 |
| Del Mar Contracting, Inc. | 14 | 2 of 14 |
| J. A. R. Concrete, Inc. | 12 | 6 of 12 |
| Synergy Project Contractors, Inc. | 9 | 3 of 9 |
| Double H Contracting Inc. | 7 | 1 of 7 |
| Martinez Bros. Contractors, LLC | 5 | 3 of 5 |
| Jordan Foster Construction, LLC | 5 | 3 of 5 |
| Allied Paving Co. | 4 | 4 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 JAN 2024 | 01243017 | El Paso District | IH 10 Preventive maintenance from 0.4 MI S OF MESA to 2.9 MI S OF MESA | 3 of 3 | $8,256,955 | +45% |
| 04 JAN 2024 | 01243029 | El Paso District | SH 20 Hazard elimination & safety from SH 148 to 0.25 MI E OF FM 192 | 3 of 3 | $4,333,076 | +14% |
| 01 NOV 2023 | 11233005 | El Paso District | RM 652 Surfacing/roadway restoration from 0.91 MI W OF FM 3541 to 4.08 MI E OF FM 3541 | 1 of 3 | $22,966,171 | Low, 20% under the second |
| 07 SEP 2023 | 09233207 | El Paso District | IH 10 Preventive maintenance from 5.346 MI W OF CULBERSON CL to HUDSPETH/CULBERSON CL | 2 of 2 | $20,489,954 | +12% |
| 03 AUG 2023 | 08233218 | El Paso District | FM 2185 Preventive maintenance from SH 54 to 4.8 MI E OF FM 2809 | 2 of 3 | $8,985,238 | +29% |
| 02 JUN 2023 | 06233204 | El Paso District | SH 20 Rehabilitate existing roadway from DONIPHAN DRIVE to SUNLAND PARK | 3 of 3 | $17,407,022 | +40% |
| 01 JUN 2023 | 06233044 | El Paso District | CR Hazard elimination & safety from (ON ACENSION RD) KENTWOOD AVE to HORIZON BLVD | 1 of 6 | $730,108 | Low, 23% under the second |
| 07 SEP 2022 | 09223037 | El Paso District | IH 10 Preventive maintenance from FM 34 to 2 MI E OF FM 34 | 2 of 3 | $6,416,948 | +34% |
| 29 JUN 2022 | 06223405 | El Paso District | US 62 Highway improvement from 2.04 MI E OF FM 2317 to 6.17 MI E OF RM 1111 | 3 of 3 | $24,891,696 | +18% |
| 05 AUG 2021 | 08213223 | El Paso District | US 62 Hazard elimination & safety from 3.5 MI E OF SH 54 to 7.42 MI E OF SH 54 | 1 of 4 | $5,832,744 | Low, 5.0% under the second |
| 05 AUG 2021 | 08213249 | El Paso District | SL 375 Surfacing/roadway restoration from 0.06 MI S OF PELLICANO to FM 76 | 5 of 6 | $2,273,857 | +14% |
| 04 AUG 2021 | 08213007 | El Paso District | IH 10 Widen road - add lanes from EASTLAKE BLVD to FM 1281 (HORIZON BLVD) | 4 of 5 | $21,967,584 | +22% |
| 04 AUG 2021 | 08213013 | El Paso District | SL 375 Interchange improvement from 1.0 MI N OF SGT MAJOR to 1.0 MI S OF SGT MAJOR | 4 of 4 | $5,788,111 | +52% |
| 02 JUL 2021 | 07213204 | El Paso District | FM 659 Hazard elimination & safety from US 62 to FM 76 | 5 of 6 | $16,156,697 | +11% |
| 02 JUL 2021 | 07213212 | El Paso District | SL 375 Surfacing/roadway restoration from 0.63 MI E OF US 54 to US 62 RAMPS | 3 of 8 | $4,076,086 | +5.0% |
| 01 JUL 2021 | 07213018 | El Paso District | SH 20 Hazard elimination & safety from 0.598 MI N OF SH 178 to 0.753 MI S OF PA 2401 | 5 of 6 | $3,265,337 | +34% |
| 06 MAY 2021 | 05213207 | El Paso District | IH 10 Hazard elimination & safety from SH 17 to BREWSTER CL | 1 of 10 | $4,097,877 | Low, 4.0% under the second |
| 06 MAY 2021 | 05213210 | El Paso District | SH 20 Surfacing/roadway restoration from 0.25 MI S OF SL 375 to 2.256 MI S OF SL 375 | 1 of 5 | $2,606,598 | Low, 8.0% under the second |
| 05 MAY 2021 | 05213011 | El Paso District | IH 10 Hazard elimination & safety from 19.02 MI E OF RM 1111 to 4.73 MI W OF US 90 | 1 of 10 | $5,286,278 | Low, 20% under the second |
| 08 APR 2021 | 04213223 | El Paso District | FM 2529 Hazard elimination & safety from 0.536 MI S OF US 54 to BU 54-A | 4 of 6 | $1,851,961 | +18% |
| 07 APR 2021 | 04213010 | El Paso District | SL 375 Hazard elimination & safety from SANTA FE ST to SS 1966 | 1 of 2 | $1,287,746 | Low, 13% under the second |
| 05 MAR 2021 | 03213223 | El Paso District | VA Bridge maintenance from COUNTYWIDE | 2 of 10 | $448,622 | +4.0% |
| 04 FEB 2021 | 02213033 | El Paso District | VA Replace guardrail from DISTRICTWIDE | 2 of 8 | $481,137 | +3.0% |
| 03 DEC 2020 | 12203213 | El Paso District | US 54 Modify existing ramps, signing & pavement marking from FM 3255 (MARTIN LUTHER KING BLVD) to SEAN HAGGERTY | 2 of 8 | $1,670,965 | +1.0% |
| 02 DEC 2020 | 12203012 | El Paso District | IH 10 Installation of concrete traffic barrier from EXECUTIVE CENTER BLVD to 0.35 MI W OF SS 1966 | 4 of 8 | $2,486,114 | +14% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.