Martinez Bros. Contractors, LLC: TxDOT bid record

Martinez Bros. Contractors, LLC submitted 23 bids on Texas DOT contracts in the data, from 04 JUN 2020 to 03 SEP 2026, and was the low bidder on 5 of them (22%). When it was not low, its total sat a median +14% above the low bid.

Owner
Texas DOT
Low bid volume
$8,713,826
Latest bid
03 SEP 2026
Data through
19 NOV 2026
23Bids
5Low bids
22Win rate, percent
+14%Median gap to the low bid when not low, 18 bids

By year

YearBidsLow bidsWin rate
20205240%
20215120%
2022100%
20232150%
20246117%
2025100%
2026300%
Martinez Bros. Contractors, LLC, TxDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Conduit (PVC) (schedule 40) (2")618-7030LF129 (75%)$15.89$15.00
Biodegradable erosion control logs (install) (8")506-7043LF178 (47%)$9.36$6.00
Barricades, signs and traffic handling502-7001MO236 (26%)$9,959.00$5,000.00
Excavation (special)110-7003CY126 (50%)$409.50$40.00
Portable changeable message sign503-7001DAY155 (33%)$117.00$100.00
Conduit (PVC) (schedule 40) (2") (bore)618-7031LF115 (45%)$28.75$28.75
Ground box type A (122311)W/apron624-7002EACH95 (56%)$1,178.75$1,271.50
Install small roadside sign support and assembly type 10BWG(1)SA(P)644-7001EACH85 (63%)$718.75$710.00
Concrete median536-7002SY75 (71%)$93.60$109.00
Biodegradable erosion control logs (remove)506-7046LF204 (20%)$1.89$1.40
Temporary sediment control fence (install)506-7039LF94 (44%)$2.70$4.00
Removing concrete (medians)104-7008SY74 (57%)$21.06$25.00
Martinez Bros. Contractors, LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Martinez Bros. Contractors, LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
03 SEP 2026A00206587El Paso DistrictHazard Elimination & Safety, SH 20 (TEXAS/NEW MEXICO STATE LINE to MESA ST)5 of 5$4,765,470+32%
06 AUG 2026A00193343El Paso DistrictHazard Elimination & Safety, SL 375 (MIDWAY DR to FRANCIS ST)2 of 4$7,658,192+9.0%
06 MAY 2026A00206605El Paso DistrictHazard Elimination & Safety, SH 20 (LEISURE LN to LAZY KNEE)5 of 5$1,491,108+72%
02 MAY 2025A00184474El Paso DistrictHazard Elimination & Safety, BU 54A (AT DEER AVE to .)2 of 2$3,194,663+20%
03 DEC 2024A00184481El Paso DistrictHazard Elimination & Safety, IH 10 (RAYNOLDS ST to US 62)2 of 2$6,674,935+7.0%
06 JUN 202406243232El Paso DistrictSH 20 Hazard elimination & safety from IH 10 to SUNLAND PARK2 of 2$3,179,286+7.0%
06 JUN 202406243234El Paso DistrictIH 10 Landscape development from YARBROUGH DR to FM 659 (ZARAGOZA RD)2 of 6$5,424,816+34%
06 JUN 202406243239El Paso DistrictBU 54-A Hazard elimination & safety from AT RUSHING RD/WILL RUTH AVE2 of 2$2,353,461+14%
05 JUN 202406243033El Paso DistrictUS 62 Hazard elimination & safety from TOBIN PL to VAL VERDE ST1 of 2$1,541,373Low, 19% under the second
05 JAN 202401243228El Paso DistrictSH 20 Hazard elimination & safety from RIO VISTA RD to PASSMORE RD2 of 2$2,457,247+7.0%
28 JUN 202306233639El Paso DistrictVA Landscape development from EL PASO COUNTYWIDE3 of 3$1,299,501+56%
27 JUN 202306233429El Paso DistrictSH 20 Hazard elimination & safety from DPNIPHAN to IH 101 of 2$3,070,094Low, 10% under the second
30 JUN 202206223636El Paso DistrictVA Landscape development from EL PASO COUNTYWIDE4 of 4$1,648,743+66%
01 JUL 202107213043El Paso DistrictVA Landscape development from CITYWIDE1 of 4$797,516Low, 4.0% under the second
03 JUN 202106213023El Paso DistrictUS 62 Hazard elimination & safety from AIRWAY BLVD to SAM MOORE PL2 of 5$1,408,8900.0%
08 APR 202104213223El Paso DistrictFM 2529 Hazard elimination & safety from 0.536 MI S OF US 54 to BU 54-A2 of 6$1,570,3530.0%
05 FEB 202102213221El Paso DistrictVA Preventive maintenance from DISTRICTWIDE2 of 6$1,408,235+5.0%
04 FEB 202102213033El Paso DistrictVA Replace guardrail from DISTRICTWIDE3 of 8$482,978+3.0%
06 AUG 202008203240El Paso DistrictSH 20 Pedestrian safety improvements from 0.1 MI W OF BALTIMORE DR to CINCINNATI AVE1 of 3$1,665,139Low, 11% under the second
06 AUG 202008203244El Paso DistrictUS 54 Modify existing ramps, signing & pavement marking from FM 3255 (MARTIN LUTHER KING BLVD) to SEAN HAGGERTY1 of 7$1,639,703Low, 5.0% under the second
09 JUL 202007203238El Paso DistrictIH 10 Green ribbon landscape improvement from 0.20 MI W OF MESA STREET to 0.70 MI E OF SUNLAND PARK DR4 of 7$883,013+74%
08 JUL 202007203014El Paso DistrictIH 10 Install median cable barrier from OT SMITH RD to EL PASO/HUDSPETH COUNTY LINE5 of 11$4,570,088+14%
04 JUN 202006203019El Paso DistrictSL 375 Mill & overlay cleaning/reseal bridge joints from LP 375/MCCOMBS to 0.21 E OF RAILROAD DR3 of 8$919,085+18%
Martinez Bros. Contractors, LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy