Joe Bland Construction, L.P.: TxDOT bid record

Joe Bland Construction, L.P. submitted 14 bids on Texas DOT contracts in the data, from 07 MAY 2020 to 07 SEP 2023, and was the low bidder on 2 of them (14%). When it was not low, its total sat a median +3.0% above the low bid.

Owner
Texas DOT
Low bid volume
$6,098,602
Latest bid
07 SEP 2023
Data through
19 NOV 2026
14Bids
2Low bids
14Win rate, percent
+3.0%Median gap to the low bid when not low, 12 bids

By year

YearBidsLow bidsWin rate
20201119%
2022100%
20232150%
Joe Bland Construction, L.P., TxDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Preparing row100-7002STA135 (38%)$800.00$2,750.00
Embankment (final)(ord comp)(type B)132-6003CY95 (56%)$5.00$30.00
FL BS (compacted in place)(type A GR 5)(final pos)247-7179CY133 (23%)$49.00$73.54
Driveways (ACP)530-7010SY113 (27%)$59.80$60.00
Trench excavation protection402-7001LF83 (38%)$4.63$10.00
Portable changeable message sign503-7002EACH73 (43%)$3,800.00$10,000
Driveways (concrete)530-7006SY73 (43%)$70.00$110.00
Concrete curb & gutter (type II)529-7009LF53 (60%)$21.00$42.58
TMA (stationary)505-7001DAY142 (14%)$212.50$230.00
Furnishing and placing topsoil (4")160-6003SY142 (14%)$2.75$3.00
Excavation (roadway)110-7001CY132 (15%)$13.00$20.00
Reflectorized pavement marker type I-C672-7002EACH102 (20%)$5.59$5.00
Joe Bland Construction, L.P., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Joe Bland Construction, L.P., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
07 SEP 202309233223Austin DistrictFM 1466 Bridge replacement from AT LITTLE DRY BRUSHY CREEK to STR# 14-246-0-1200-04-0071 of 4$5,546,235Low, 13% under the second
04 APR 202304233011Austin DistrictRM 967 Rehabilitate existing roadway from GOFORTH RD (CR 228) to IH 35 SBFR2 of 5$8,586,676+1.0%
03 AUG 202208223012Austin DistrictRM 12 Widen road - add lanes from HUGO RD to PIONEER TRAIL2 of 7$5,188,430+2.0%
06 AUG 202008203216Austin DistrictSH 29 Highway improvement from +/- 1500 FT W OF DB WOOD to +/- 2500 FT E OF DB WOOD4 of 6$6,455,046+16%
06 AUG 202008203226Austin DistrictUS 281 Highway improvement from SH 71 to BLANCO COUNTY LINE4 of 9$5,076,257+11%
06 AUG 202008203254Austin DistrictFM 734 Safety improvement project from 0.1 M. NW OF YAGER LANE to 0.1 M. SE OF YAGER LANE1 of 2$552,367Low, 7.0% under the second
08 JUL 202007203010Austin DistrictFM 1626 Reconstruct exst 2-ln rdwy to a 4-ln rdwy w/cltl from SOUTH OF BRODIE LN to EAST OF FM 23044 of 5$11,741,030+16%
08 JUL 202007203050Austin DistrictSH 304 Safety improvement project from 0.047 MI SOUTH OF FM 2571 to 0.100 MI SOUTH OF FM 5355 of 5$9,416,266+29%
05 JUN 202006203216Austin DistrictRM 12 Highway improvement from SPORTS PARK ROAD to 0.1 MI. SOUTH OF POST OAK ROAD3 of 7$3,748,521+4.0%
05 JUN 202006203218Austin DistrictSH 95 Hazard elimination & safety from 0.304 N OF LBA DR to 0.236 S OF LBA DR3 of 7$1,896,275+2.0%
04 JUN 202006203014Austin DistrictUS 183 Highway improvement from 0.230 MI N OF LIVE OAK DR to 0.230 MI S OF CR 2122 of 5$1,547,290+3.0%
04 JUN 202006203021Austin DistrictSH 195 Intersection & operational imprv from 0.26 MILES NORTH OF BONNET LANE to 0.21 MILES SOUTH OF BONNET LANE2 of 6$690,408+3.0%
08 MAY 202005203232Austin DistrictSH 71 Intersection improvements from 0.18 MI WEST OF VISTA VIEW TRAIL to 0.39 MI EAST OF VISTA VIEW TRAIL2 of 7$760,3100.0%
07 MAY 202005203012Austin DistrictSH 29 Construct super 2 passing lanes from 2.7 MILES WEST OF RM 1431 to RM 14312 of 10$4,675,5330.0%
Joe Bland Construction, L.P.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.