Joe Bland Construction, L.P.: TxDOT bid record
Joe Bland Construction, L.P. submitted 14 bids on Texas DOT contracts in the data, from 07 MAY 2020 to 07 SEP 2023, and was the low bidder on 2 of them (14%). When it was not low, its total sat a median +3.0% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $6,098,602
- Latest bid
- 07 SEP 2023
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 11 | 1 | 9% |
| 2022 | 1 | 0 | 0% |
| 2023 | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Preparing row | 100-7002 | STA | 13 | 5 (38%) | $800.00 | $2,750.00 |
| Embankment (final)(ord comp)(type B) | 132-6003 | CY | 9 | 5 (56%) | $5.00 | $30.00 |
| FL BS (compacted in place)(type A GR 5)(final pos) | 247-7179 | CY | 13 | 3 (23%) | $49.00 | $73.54 |
| Driveways (ACP) | 530-7010 | SY | 11 | 3 (27%) | $59.80 | $60.00 |
| Trench excavation protection | 402-7001 | LF | 8 | 3 (38%) | $4.63 | $10.00 |
| Portable changeable message sign | 503-7002 | EACH | 7 | 3 (43%) | $3,800.00 | $10,000 |
| Driveways (concrete) | 530-7006 | SY | 7 | 3 (43%) | $70.00 | $110.00 |
| Concrete curb & gutter (type II) | 529-7009 | LF | 5 | 3 (60%) | $21.00 | $42.58 |
| TMA (stationary) | 505-7001 | DAY | 14 | 2 (14%) | $212.50 | $230.00 |
| Furnishing and placing topsoil (4") | 160-6003 | SY | 14 | 2 (14%) | $2.75 | $3.00 |
| Excavation (roadway) | 110-7001 | CY | 13 | 2 (15%) | $13.00 | $20.00 |
| Reflectorized pavement marker type I-C | 672-7002 | EACH | 10 | 2 (20%) | $5.59 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Angel Brothers Holdings Corp. | 10 | 3 of 10 |
| Aaron Concrete Contractors, L.P. | 10 | 2 of 10 |
| Dan Williams Company | 6 | 4 of 6 |
| Capital Excavation Company | 5 | 2 of 5 |
| Hunter Industries, LTD. | 5 | 2 of 5 |
| Acme Bridge Company, Inc. | 4 | 1 of 4 |
| Lone Star Sitework, LLC | 4 | 1 of 4 |
| Big Creek Construction, LTD. | 3 | 2 of 3 |
| Salinas Construction Technologies, LTD. | 3 | 2 of 3 |
| FNH Construction, LLC | 3 | 0 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 SEP 2023 | 09233223 | Austin District | FM 1466 Bridge replacement from AT LITTLE DRY BRUSHY CREEK to STR# 14-246-0-1200-04-007 | 1 of 4 | $5,546,235 | Low, 13% under the second |
| 04 APR 2023 | 04233011 | Austin District | RM 967 Rehabilitate existing roadway from GOFORTH RD (CR 228) to IH 35 SBFR | 2 of 5 | $8,586,676 | +1.0% |
| 03 AUG 2022 | 08223012 | Austin District | RM 12 Widen road - add lanes from HUGO RD to PIONEER TRAIL | 2 of 7 | $5,188,430 | +2.0% |
| 06 AUG 2020 | 08203216 | Austin District | SH 29 Highway improvement from +/- 1500 FT W OF DB WOOD to +/- 2500 FT E OF DB WOOD | 4 of 6 | $6,455,046 | +16% |
| 06 AUG 2020 | 08203226 | Austin District | US 281 Highway improvement from SH 71 to BLANCO COUNTY LINE | 4 of 9 | $5,076,257 | +11% |
| 06 AUG 2020 | 08203254 | Austin District | FM 734 Safety improvement project from 0.1 M. NW OF YAGER LANE to 0.1 M. SE OF YAGER LANE | 1 of 2 | $552,367 | Low, 7.0% under the second |
| 08 JUL 2020 | 07203010 | Austin District | FM 1626 Reconstruct exst 2-ln rdwy to a 4-ln rdwy w/cltl from SOUTH OF BRODIE LN to EAST OF FM 2304 | 4 of 5 | $11,741,030 | +16% |
| 08 JUL 2020 | 07203050 | Austin District | SH 304 Safety improvement project from 0.047 MI SOUTH OF FM 2571 to 0.100 MI SOUTH OF FM 535 | 5 of 5 | $9,416,266 | +29% |
| 05 JUN 2020 | 06203216 | Austin District | RM 12 Highway improvement from SPORTS PARK ROAD to 0.1 MI. SOUTH OF POST OAK ROAD | 3 of 7 | $3,748,521 | +4.0% |
| 05 JUN 2020 | 06203218 | Austin District | SH 95 Hazard elimination & safety from 0.304 N OF LBA DR to 0.236 S OF LBA DR | 3 of 7 | $1,896,275 | +2.0% |
| 04 JUN 2020 | 06203014 | Austin District | US 183 Highway improvement from 0.230 MI N OF LIVE OAK DR to 0.230 MI S OF CR 212 | 2 of 5 | $1,547,290 | +3.0% |
| 04 JUN 2020 | 06203021 | Austin District | SH 195 Intersection & operational imprv from 0.26 MILES NORTH OF BONNET LANE to 0.21 MILES SOUTH OF BONNET LANE | 2 of 6 | $690,408 | +3.0% |
| 08 MAY 2020 | 05203232 | Austin District | SH 71 Intersection improvements from 0.18 MI WEST OF VISTA VIEW TRAIL to 0.39 MI EAST OF VISTA VIEW TRAIL | 2 of 7 | $760,310 | 0.0% |
| 07 MAY 2020 | 05203012 | Austin District | SH 29 Construct super 2 passing lanes from 2.7 MILES WEST OF RM 1431 to RM 1431 | 2 of 10 | $4,675,533 | 0.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.