TxDOT contract A00200605 bid tabulation

Construct Curb And Gutter, SH 71 (BEE CREEK ROAD to UPLANDS RIDGE). Let by Texas DOT on June 5, 2025, Travis, Austin District. 5 bids received; low bid $1,629,168 by Dan Williams Company, -23% against the engineer's estimate of $2,116,968.

Owner
Texas DOT
Letting
05 JUN 2025
Pay items
73
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Dan Williams Company$1,629,168Low-23%
2Aaron Concrete Contractors, LLC$1,674,811+3.0%-21%
3Garret Shields Infrastructure$1,887,960+16%-11%
4Lone Star Sitework, LLC$2,000,772+23%-5.0%
5Grey Sky Construction LLC$2,092,850+28%-1.0%
TxDOT contract A00200605: bids by rank

Engineer's estimate: $2,116,968.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Dan Williams Company2. Aaron Concrete Contractors, LLC3. Garret Shields Infrastructure4. Lone Star Sitework, LLC5. Grey Sky Construction LLC
1Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY14$15.00$125.00$125.00$50.00$60.00$100.00
2Excavation (roadway) (110-7001)CY80$40.00$110.00$35.00$50.00$75.00$100.00
3Embankment (final)(OC)(type B) (132-7003)CY222$75.00$100.00$45.00$80.00$65.00$100.00
4Furn & place topsoil (4") (160-7002)SY908$5.50$10.00$3.00$6.00$25.00$10.00
5Broadcast seed (permanent_urban_clay) (164-7004)SY908$1.50$1.10$1.00$1.00$0.90$1.00
6Soil retention blankets (CL 1) (type B) (169-7043)SY162$2.00$12.00$6.00$2.00$5.00$10.00
7FL BS (compacted in place)(type A GR 5)(final pos) (247-7179)CY62$95.00$200.00$250.00$250.00$330.00$100.00
8Asphalt binder (PG 64-22) (291-7002)GAL21$15.00$12.00$15.00$10.00$15.00$10.00
9D-GR HMA type-B PG64-22 (exempt) (341-7003)TON130$200.00$350.00$390.00$300.00$407.00$350.00
10D-GR HMA type D PG 76-22 (exempt) (341-7065)TON20$225.00$400.00$450.00$300.00$469.00$500.00
11Mobilization (500-7001)LS1$197,341$160,000$70,000$200,000$77,120$240,000
12Barricades, signs and traffic handling (502-7001)MO8$8,000.00$35,000$1,500.00$5,000.00$8,000.00$15,000
13Portable changeable message sign (503-7001)DAY240$100.00$145.00$125.00$1.00$300.00$150.00
14TMA (stationary) (505-7001)DAY240$300.00$150.00$240.00$300.00$610.00$250.00
15TMA (mobile operation) (505-7002)HR256$12.50$65.00$98.00$30.00$240.00$85.00
16Temporary sediment control fence (install) (506-7039)LF600$4.50$5.00$6.00$5.00$5.00$4.00
17Temporary sediment control fence (remove) (506-7041)LF600$1.50$1.00$1.50$1.00$1.25$2.00
18Concrete curb (type I) (529-7001)LF1,008$25.00$45.00$44.00$50.00$55.00$50.00
19Concrete curb (type II) (529-7002)LF17,198$30.00$23.50$38.00$40.00$39.00$35.00
20Concrete sidewalks (5") (531-7002)SY130$80.00$110.00$145.00$100.00$155.00$75.00
21Curb ramps (type 20) (531-7012)EACH1$3,000.00$4,000.00$3,600.00$3,000.00$4,500.00$3,850.00
22Concrete median (536-7001)LF2,152$175.00$65.00$100.00$80.00$69.00$125.00
23Relocate existing mailbox (560-7012)EACH1$500.00$1,000.00$430.00$500.00$375.00$1,100.00
24Conduit (PVC) (schedule 40) (3") (618-7036)LF90$21.00$88.00$105.00$90.00$36.00$50.00
25Reflectorized pavement marking type I (W)6"(DOT)(090MIL) (666-7008)LF50$2.00$1.06$1.30$1.50$3.75$3.00
26Reflectorized pavement marking type I (W)8"(DOT)(090MIL) (666-7017)LF507$3.00$2.05$2.50$1.50$3.75$4.00
27Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023)LF12,065$2.00$0.77$1.00$1.00$1.25$4.00
28Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035)LF1,290$12.00$7.25$8.70$22.00$8.10$10.00
29Reflectorized pavement marking type I (W)(arrow)(090MIL) (666-7041)EACH49$150.00$167.00$200.00$340.00$219.00$250.00
30Reflectorized pavement marking type I (W)(word)(090MIL) (666-7065)EACH43$250.00$205.00$246.00$360.00$234.00$250.00
31Reflectorized pavement marking type I (W)(bike arrow)(090MIL) (666-7092)EACH22$115.00$106.00$128.00$200.00$125.00$500.00
32Reflectorized pavement marking type I(W)(bike syml)(090MIL) (666-7098)EACH23$115.00$106.00$128.00$282.00$156.00$500.00
33Reflectorized pavement marking type I (Y)6"(DOT)(090MIL) (666-7110)LF170$3.30$1.06$1.30$1.50$3.75$3.00
34RE PV marking type I(black)4"(shadow)(090MIL) (666-7134)LF5,000$2.00$0.70$0.85$1.00$2.50$1.00
35Reflectorized pavement marking type I (W)6"(broken)(090MIL)(callout) (666-7144)LF10,532$2.00$1.60$1.90$0.80$1.25$1.00
36Reflectorized pavement marking type II (W) 6" (broken) (666-7172)LF10,532$1.00$0.34$0.40$0.50$0.45$0.65
37Reflectorized pavement marking type II (W) 6" (DOT) (666-7173)LF640$2.00$0.34$0.40$1.30$0.50$0.65
38Reflectorized pavement marking type II (W) 6" (solid) (666-7175)LF40,138$0.80$0.34$0.40$0.50$0.38$0.65
39Reflectorized pavement marking type II (W) 8" (DOT) (666-7177)LF507$10.00$0.34$0.40$2.50$0.80$6.00
40Reflectorized pavement marking type II (W) 8" (solid) (666-7179)LF12,065$1.00$0.34$0.40$1.30$0.70$4.00
41Reflectorized pavement marking type II (W) 24" (solid) (666-7184)LF2,279$6.00$3.24$3.90$5.00$5.00$10.00
42Reflectorized pavement marking type II (W) (arrow) (666-7186)EACH49$115.00$70.00$84.00$110.00$94.00$250.00
43Reflectorized pavement marking type II (W) (word) (666-7194)EACH43$200.00$77.00$93.00$130.00$109.00$250.00
44Reflectorized pavement marking type II (W) (curb) (666-7202)LF481$6.00$0.70$0.80$2.00$2.50$3.00
45Reflectorized pavement marking type II (W) (bike arrow) (666-7203)EACH23$150.00$43.00$52.00$50.00$63.00$250.00
46Reflectorized pavement marking type II (W) (bike symbol) (666-7205)EACH23$150.00$43.00$52.00$70.00$93.00$250.00
47Reflectorized pavement marking type II (Y) 6" (broken) (666-7211)LF143$2.00$0.34$0.40$1.00$2.50$3.00
48Reflectorized pavement marking type II (Y) 6" (DOT) (666-7212)LF170$2.00$0.34$0.40$2.00$2.50$3.00
49Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF68,624$1.00$0.34$0.40$0.50$0.40$0.65
50Reflectorized pavement marking type II (Y)(curb) (666-7221)LF36,100$5.00$0.70$0.85$2.00$1.00$0.65
51Reflectorized pavement marking type II (BLK)(4")(shadow) (666-7228)LF5,000$2.00$0.52$0.60$0.50$1.25$1.00
52Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265)LF44,406$1.50$1.06$1.30$1.05$1.06$0.65
53Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269)LF68,594$1.50$1.06$1.30$1.10$1.07$0.65
54Reflectorized profile pavement marking type I(Y)6"(broken)(090MIL) (666-7273)LF738$2.00$1.06$1.30$1.20$1.07$0.65
55Reflectorized pavement marker type II-C-R (672-7006)EACH1,000$7.50$5.20$6.00$7.00$6.90$6.00
56Eliminating existing PM & markers (4") (677-7001)LF69,072$1.00$0.52$0.60$1.20$0.60$0.50
57Eliminating existing PM & markers (8") (677-7004)LF1,105$2.00$0.52$0.60$2.20$0.75$4.00
58Eliminating existing PM & markers (24") (677-7008)LF694$3.00$2.50$3.00$9.00$9.00$20.00
59Eliminating existing PM & markers (entr gore) (677-7016)EACH1$300.00$777.00$934.00$230.00$1,000.00$1,500.00
60Eliminating existing PM & markers (exit gore) (677-7017)EACH1$300.00$777.00$934.00$230.00$1,000.00$1,500.00
61Eliminating existing PM & markers (plowable RPMS) (677-7031)EACH770$20.00$0.70$0.85$0.60$7.00$50.00
62Vehicle signal section (12")LED(green) (682-7001)EACH1$300.00$500.00$1,290.00$630.00$465.00$385.00
63Vehicle signal section (12")LED(green arrow) (682-7002)EACH1$300.00$500.00$1,300.00$630.00$465.00$385.00
64Vehicle signal section (12")LED(yel) (682-7003)EACH1$300.00$500.00$1,290.00$630.00$465.00$385.00
65Vehicle signal section (12")LED(red) (682-7005)EACH1$300.00$500.00$1,290.00$630.00$465.00$385.00
66Pedestrian signal section (LED)(countdown) (682-7018)EACH2$750.00$780.00$2,560.00$1,350.00$1,500.00$4,500.00
67Backplate W/reflectorized border(4 sec) (682-7037)EACH1$300.00$300.00$1,000.00$400.00$250.00$200.00
68Traffic signal CBL (type A)(14 AWG)(2 conductor) (684-7028)LF305$3.25$4.00$7.00$7.65$2.50$3.00
69Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031)LF315$2.50$5.00$9.00$7.65$2.20$3.00
70Pedestrian pole assembly (687-7001)EACH2$2,500.00$10,000$9,900.00$10,000$3,540.00$3,500.00
71Pedestrian detect push button (APS) (688-7001)EACH2$1,300.00$1,000.00$3,400.00$2,400.00$1,830.00$1,850.00
72Retrofit det warn surface (surface applied) (5031-7002)EACH5$500.00$4,500.00$1,800.00$300.00$25,000$1,500.00
73Long channel mount curb sys (remove) (6039-7003)LF370$50.00$5.00$3.50$10.00$32.00$50.00
TxDOT contract A00200605: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of June 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy