TxDOT contract A00130902 bid tabulation
Hazard Elimination & Safety, RM 150 (AT Onion Creek Double Crossings to .). Let by Texas DOT on January 7, 2026, Hays, Austin District. 10 bids received; low bid $999,085 by Professional Traffic Control LLC, -8.9% against the engineer's estimate of $1,096,941.
- Owner
- Texas DOT
- Letting
- 07 JAN 2026
- Pay items
- 55
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Professional Traffic Control LLC | $999,085 | Low | -9.0% |
| 2 | Relmco, Inc. | $1,048,948 | +5.0% | -4.0% |
| 3 | E-Z Bel Construction, LLC | $1,162,305 | +16% | +6.0% |
| 4 | Acme Bridge Company, Inc. | $1,229,050 | +23% | +12% |
| 5 | Dan Williams Company | $1,282,769 | +28% | +17% |
| 6 | Lone Star Sitework, LLC | $1,314,067 | +32% | +20% |
| 7 | STX Civil | $1,349,466 | +35% | +23% |
| 8 | Garret Shields Infrastructure | $1,387,380 | +39% | +26% |
| 9 | Aaron Concrete Contractors, LLC | $1,419,407 | +42% | +29% |
| 10 | Dean Word Company, LTD. | $1,698,660 | +70% | +55% |
Engineer's estimate: $1,096,941.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Professional Traffic Control LLC | 2. Relmco, Inc. | 3. E-Z Bel Construction, LLC | 4. Acme Bridge Company, Inc. | 5. Dan Williams Company | 6. Lone Star Sitework, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 9.75 | $3,000.00 | $2,725.00 | $5,500.00 | $5,960.00 | $2,000.00 | $12,000 | $600.00 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 645 | $17.00 | $12.35 | $20.00 | $14.00 | $19.10 | $20.00 | $18.10 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 36 | $25.00 | $17.54 | $20.00 | $14.00 | $22.70 | $20.00 | $18.10 |
| 4 | Excavation (roadway) (110-7001) | CY | 610 | $25.00 | $15.10 | $30.00 | $34.00 | $30.00 | $40.00 | $24.30 |
| 5 | Excavation (channel) (110-7002) | CY | 75 | $23.00 | $18.88 | $40.00 | $131.00 | $50.50 | $50.00 | $31.20 |
| 6 | Embankment (final)(DC)(type B) (132-7004) | CY | 292 | $25.00 | $40.00 | $30.00 | $18.00 | $30.00 | $40.00 | $75.80 |
| 7 | Furn & place topsoil (4") (160-7002) | SY | 867 | $5.00 | $1.60 | $10.00 | $5.00 | $5.10 | $2.50 | $18.40 |
| 8 | Hydro mulch seed (permanent_rural_sandy) (164-7017) | SY | 867 | $2.00 | $0.39 | $5.00 | $1.00 | $1.05 | $1.00 | $0.95 |
| 9 | Vegetative watering (168-7001) | TGL | 3 | $75.00 | $28.30 | $80.00 | $500.00 | $62.40 | $1.00 | $630.00 |
| 10 | Soil retention blankets (CL 1) (type B) (169-7043) | SY | 867 | $1.10 | $1.31 | $5.00 | $2.50 | $2.65 | $2.50 | $1.50 |
| 11 | FL BS (compacted in place)(type A GR 5)(final pos) (247-7179) | CY | 263 | $90.00 | $104.00 | $80.00 | $105.00 | $90.00 | $84.00 | $219.00 |
| 12 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 112 | $4.00 | $8.23 | $8.00 | $3.50 | $3.75 | $3.30 | $3.45 |
| 13 | D-GR HMA type-B PG64-22 (341-7001) | TON | 93 | $130.00 | $101.60 | $200.00 | $472.00 | $393.00 | $265.00 | $360.00 |
| 14 | D-GR HMA type D PG76-22 (341-7056) | TON | 164 | $165.00 | $266.00 | $195.00 | $212.00 | $302.00 | $265.00 | $275.00 |
| 15 | D-GR HMA type D PG76-22 (level-UP) (341-7059) | TON | 5 | $140.00 | $108.00 | $400.00 | $696.00 | $260.00 | $230.00 | $240.00 |
| 16 | D-GR HMA type D PG 64-22 (exempt) (341-7064) | TON | 73 | $160.00 | $479.60 | $250.00 | $147.00 | $776.00 | $298.00 | $710.00 |
| 17 | Tom-C PG76-22 sac-B (347-7002) | TON | 110 | $180.00 | $161.22 | $185.00 | $309.00 | $416.00 | $375.00 | $380.00 |
| 18 | Flexible pavement structure repair(10") (351-7009) | SY | 33 | $1,000.00 | $91.60 | $150.00 | $153.00 | $376.00 | $330.00 | $156.00 |
| 19 | Concrete pavement (CRCP) (8") (360-7002) | SY | 1,315 | $105.00 | $132.00 | $115.00 | $115.00 | $141.00 | $120.00 | $129.00 |
| 20 | Struct excavation (400-7001) | CY | 170 | $8.50 | $28.00 | $20.00 | $30.00 | $63.30 | $1.00 | $59.60 |
| 21 | Cut and restore pavement (flex base) (400-7009) | SY | 100 | $85.00 | $67.50 | $80.00 | $25.00 | $43.80 | $30.00 | $156.60 |
| 22 | Cem stabil BKFL (400-7010) | CY | 220 | $225.00 | $190.00 | $185.00 | $150.00 | $240.00 | $250.00 | $239.00 |
| 23 | Flowable backfill (401-7001) | CY | 224 | $240.00 | $310.00 | $185.00 | $225.00 | $246.00 | $250.00 | $151.00 |
| 24 | Temporary special shoring (403-7001) | SF | 765 | $25.00 | $35.82 | $28.00 | $4.00 | $1.00 | $5.00 | $27.00 |
| 25 | Riprap (mow strip)(4 in) (432-7013) | CY | 55 | $625.00 | $650.00 | $465.00 | $775.00 | $609.00 | $600.00 | $675.00 |
| 26 | RC pipe (CL III)(30 in) (464-7007) | LF | 1,320 | $135.00 | $110.50 | $85.00 | $100.00 | $88.90 | $80.00 | $121.00 |
| 27 | Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346) | EACH | 40 | $2,250.00 | $2,150.00 | $1,750.00 | $3,925.00 | $2,870.00 | $3,750.00 | $3,725.00 |
| 28 | Removing structure (set) (496-7004) | EACH | 8 | $550.00 | $573.18 | $800.00 | $350.00 | $478.00 | $800.00 | $2,100.00 |
| 29 | Removing structure (pipe) (496-7007) | LF | 361 | $21.00 | $27.00 | $25.00 | $10.50 | $23.20 | $30.00 | $45.00 |
| 30 | Remove STR (gabion) (496-7018) | LF | 6 | $150.00 | $86.49 | $100.00 | $15.00 | $68.90 | $60.00 | $55.00 |
| 31 | Mobilization (500-7001) | LS | 1 | $102,000 | $5,000.00 | $100,000 | $100,000 | $100,000 | $120,000 | $54,800 |
| 32 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $7,500.00 | $2,000.00 | $4,500.00 | $1,500.00 | $5,000.00 | $10,000 | $2,300.00 |
| 33 | Portable changeable message sign (503-7002) | EACH | 2 | $5,750.00 | $1,000.00 | $12,500 | $14,000 | $17,500 | $8,000.00 | $12,000 |
| 34 | TMA (stationary) (505-7001) | DAY | 86 | $135.00 | $500.00 | $200.00 | $433.00 | $179.00 | $95.00 | $400.00 |
| 35 | TMA (mobile operation) (505-7002) | HR | 30 | $90.00 | $200.00 | $40.00 | $100.00 | $90.10 | $55.00 | $525.00 |
| 36 | Rock filter dams (install) (type 2) (506-7002) | LF | 180 | $39.50 | $43.70 | $50.00 | $40.00 | $41.80 | $39.50 | $49.50 |
| 37 | Rock filter dams (remove) (506-7011) | LF | 180 | $9.50 | $15.10 | $18.00 | $6.00 | $6.40 | $6.00 | $21.00 |
| 38 | Temporary sediment control fence (install) (506-7039) | LF | 1,380 | $2.50 | $3.81 | $6.00 | $4.00 | $3.70 | $4.00 | $3.90 |
| 39 | Temporary sediment control fence (remove) (506-7041) | LF | 1,380 | $0.70 | $1.06 | $3.00 | $0.25 | $0.27 | $0.25 | $1.10 |
| 40 | One-way traffic control (port traffic signal) (510-7003) | MO | 7 | $4,000.00 | $4,500.00 | $3,500.00 | $1,200.00 | $4,150.00 | $2,750.00 | $5,850.00 |
| 41 | Concrete curb (type II) (529-7002) | LF | 740 | $35.00 | $18.00 | $20.00 | $20.00 | $25.00 | $30.00 | $34.50 |
| 42 | Driveways (ACP) (530-7010) | SY | 52 | $60.00 | $78.30 | $50.00 | $71.50 | $82.70 | $90.00 | $105.00 |
| 43 | Metal W-beam guard fence (steel post) (540-7002) | LF | 112.50 | $43.10 | $26.28 | $35.00 | $31.50 | $32.90 | $35.00 | $32.00 |
| 44 | Guardrail end treatment (install) (544-7001) | EACH | 2 | $3,289.83 | $2,665.23 | $4,000.00 | $3,764.00 | $3,990.00 | $4,000.00 | $3,700.00 |
| 45 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 20 | $440.00 | $600.00 | $800.00 | $775.00 | $797.00 | $800.00 | $850.00 |
| 46 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 20 | $563.00 | $520.00 | $250.00 | $450.00 | $559.00 | $600.00 | $495.00 |
| 47 | Install object marker assembly (OM-2Y)(WC)GND (658-7056) | EACH | 8 | $70.00 | $55.40 | $250.00 | $71.50 | $81.60 | $77.00 | $115.00 |
| 48 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 200 | $3.13 | $3.52 | $4.40 | $5.00 | $5.30 | $5.00 | $5.50 |
| 49 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 7,000 | $0.59 | $1.26 | $1.65 | $2.00 | $1.15 | $1.10 | $1.70 |
| 50 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 4,580 | $1.00 | $0.74 | $1.65 | $2.00 | $2.10 | $2.00 | $1.90 |
| 51 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 4,580 | $0.90 | $0.89 | $1.65 | $2.00 | $2.10 | $2.00 | $1.90 |
| 52 | PRFB rumble strip (BLK)(1')(centerline) (668-7002) | LF | 975 | $2.17 | $3.24 | $5.50 | $5.00 | $7.40 | $7.00 | $5.75 |
| 53 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 57 | $5.50 | $4.80 | $6.60 | $57.00 | $5.30 | $5.00 | $5.75 |
| 54 | Eliminating existing PM & markers (4") (677-7001) | LF | 5,260 | $1.28 | $0.62 | $2.20 | $0.48 | $2.00 | $1.00 | $0.55 |
| 55 | Bonding course (3007-7001) | GAL | 1,190 | $4.00 | $3.20 | $4.00 | $5.50 | $3.40 | $3.00 | $3.15 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 7, 2026. Compiled by Mirage Metrics.