TxDOT contract A00206631 bid tabulation

Hazard Elimination & Safety, FM 485 (1.99 Mi W of FM 979 to 1.86 Mi E of FM 979). Let by Texas DOT on November 4, 2026, Milam, Bryan District. 7 bids received; low bid $9,787,627 by Big Creek Construction, LTD., -7.2% against the engineer's estimate of $10,546,131.

Owner
Texas DOT
Letting
04 NOV 2026
Pay items
116
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Big Creek Construction, LTD.$9,787,627Low-7.0%
2Larry Young Paving, Inc.$10,182,780+4.0%-3.0%
3Knife River Corporation - South$10,424,591+7.0%-1.0%
4Texas Materials Group, Inc.$12,020,138+23%+14%
5A. L. Helmcamp, Inc.$12,374,454+26%+17%
6Patin Construction LLC$15,629,317+60%+48%
7Joe Bland Construction LLC$18,492,861+89%+75%
TxDOT contract A00206631: bids by rank

Engineer's estimate: $10,546,131.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Big Creek Construction, LTD.2. Larry Young Paving, Inc.3. Knife River Corporation - South4. Texas Materials Group, Inc.5. A. L. Helmcamp, Inc.6. Patin Construction LLC
1Preparing row (100-7002)STA275$625.00$750.00$1,230.00$145.00$204.63$600.00$630.00
2Removing concrete (riprap) (104-7006)SY246$12.00$25.00$9.00$53.00$24.00$36.00$25.00
3Remove (10"-14") TRT/untrt base & asphalt pavement (105-7010)SY2,767$12.00$15.00$12.00$6.50$14.00$15.00$25.00
4Remove (12") TRT/untrt base & asphalt pavement (105-7032)SY6,363$8.00$5.00$3.00$3.00$6.95$15.00$20.00
5Remove (2"-8") TRT/untrt base & asphalt pavement (105-7053)SY3,663$3.50$10.00$3.00$3.00$3.40$8.00$20.00
6Excavation (roadway) (110-7001)CY21,027$12.00$15.00$16.00$6.00$10.30$17.00$30.00
7Embankment (final)(DC)(type C) (132-7006)CY21,464$14.00$15.00$12.00$25.25$8.60$19.00$60.00
8Furn & place topsoil (4") (160-7002)SY160,878$0.75$0.50$0.50$1.00$0.50$1.50$2.00
9Hydro mulch seed (permanent_rural_sandy) (164-7017)SY160,878$0.60$0.50$0.50$0.48$0.47$0.49$2.00
10Hydro mulch seed (temporary_warm) (164-7021)SY80,442$0.40$0.46$0.45$0.45$0.45$0.47$1.00
11Hydro mulch seed (temporary_cool) (164-7022)SY80,442$0.50$0.46$0.45$0.45$0.45$0.47$1.00
12Vegetative watering (168-7001)TGL1,609$14.00$15.00$42.00$46.00$43.00$15.00$10.00
13Soil ret BLKT(chan_permanent_2 PSF) (169-7031)SY15,144$3.00$1.00$0.90$0.92$2.50$2.60$3.00
14Soil ret BLKT(chan_permanent_4 PSF) (169-7032)SY1,078$2.00$1.00$1.45$6.00$6.50$3.00
15Soil ret BLKT(chan_permanent_6 PSF) (169-7033)SY250$4.00$5.00$3.50$6.00$6.50$3.00
16FL BS (compacted in place)(tya GR1-2)(final pos) (247-7176)CY41,907$74.00$65.00$68.00$82.00$114.00$80.00$85.00
17Rework BS metal (type C)(12")(ord comp) (251-7055)SY88,281$2.50$1.50$2.00$0.75$1.20$1.50$6.00
18Lime (com or QK)(slurry) or QK(dry) (260-7001)TON1,546$330.00$342.00$400.00$335.00$334.00$350.00$400.00
19Lime TRT (existing material)(10") (260-7008)SY54,945$3.50$4.00$5.00$5.00$3.70$5.00$10.00
20Cement (275-7001)TON3,559$215.00$210.00$200.00$183.50$210.00$230.00$260.00
21Cement TRT (existing material & new base)(10") (275-7008)SY143,219$2.50$1.60$1.00$0.85$2.25$2.50$6.00
22Cement TRT (new base)(8") (275-7011)SY137,231$2.50$2.25$1.00$0.75$2.25$2.50$6.00
23Asphalt (AC-20XP) (316-7006)GAL104,296$3.10$3.50$3.75$2.80$4.00$4.00$5.00
24Asphalt (RC-250) (316-7016)GAL31,927$4.00$5.00$5.75$4.25$5.60$5.00$6.50
25Aggregate (type-PB or PL, GR-4)(sac-A) (316-7241)CY2,196$150.00$165.00$200.00$184.50$184.00$200.00$240.00
26Aggregate (type-B or L, GR-5) (316-7251)CY1,075$105.00$110.00$119.95$136.80$181.20$200.00$225.00
27Cut & restore asphalt paving (400-7008)SY138$140.00$240.00$94.00$73.00$240.00$15.00$100.00
28Cem stabil BKFL (400-7010)CY103$116.00$250.00$130.00$142.50$250.00$270.00$300.00
29Trench excavation protection (402-7001)LF175$10.00$15.00$1.00$35.00$10.00$9.50$5.00
30Riprap (concrete)(5 in) (432-7002)CY9$550.00$900.00$780.00$928.00$631.00$770.00$700.00
31Riprap (stone common)(dry)(12 in) (432-7031)CY5$500.00$85.00$344.00$450.00$460.00$250.00
32RC pipe (CL III)(18 in) (464-7003)LF1,060$72.00$55.00$71.00$49.00$50.00$72.00$75.00
33RC pipe (CL III)(24 in) (464-7005)LF806$90.00$75.00$85.00$84.00$71.00$97.00$90.00
34RC pipe (CL III)(30 in) (464-7007)LF928$125.00$120.00$110.00$111.00$112.50$162.00$120.00
35RC pipe (CL III)(36 in) (464-7009)LF70$180.00$175.00$180.00$190.00$172.50$188.00$150.00
36RC pipe (CL III)(48 in) (464-7011)LF54$250.00$270.00$522.00$224.00$320.00$300.00
37RC pipe (CL IV)(18 in) (464-7019)LF448$90.00$65.00$77.00$50.00$59.00$82.00$100.00
38RC pipe (CL IV)(24 in) (464-7021)LF502$120.00$90.00$97.00$72.00$84.00$110.00$120.00
39Headwall (CH - PW - 0) (diameter= 30 in) (466-7103)EACH2$7,500.00$9,900.00$22,045$7,250.00$12,000$5,000.00
40Headwall (CH - PW - 0) (diameter= 36 in) (466-7105)EACH1$10,000$10,000$11,000$22,614$9,500.00$13,000$5,500.00
41Headwall (CH - PW - 0) (diameter= 48 in) (466-7107)EACH2$11,000$13,000$30,245$10,250$15,000$6,500.00
42Set (pipe runner assembly) (467-7001)EACH2$1,500.00$1,500.00$1,200.00$1,820.00$1,100.00$1,200.00$2,500.00
43Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH64$1,150.00$1,000.00$1,300.00$1,971.00$850.00$2,000.00$2,000.00
44Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325)EACH4$1,700.00$1,200.00$110.00$2,164.00$1,100.00$1,900.00$2,500.00
45Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326)EACH7$1,725.00$1,250.00$1,700.00$2,600.00$1,150.00$2,400.00$2,500.00
46Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH46$1,500.00$1,275.00$1,500.00$2,645.00$1,225.00$2,200.00$2,500.00
47Set (type II) (30 in) (RCP) (3: 1) (C) (467-7345)EACH13$3,500.00$1,500.00$2,300.00$3,348.00$1,385.00$2,700.00$3,000.00
48Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346)EACH8$1,600.00$2,400.00$4,199.00$1,510.00$2,700.00$3,000.00
49Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348)EACH14$2,500.00$4,000.00$3,100.00$5,115.00$3,940.00$3,800.00$3,000.00
50Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368)EACH2$6,600.00$4,300.00$4,400.00$6,820.00$4,100.00$5,400.00$3,500.00
51Set (type II) (48 in) (RCP) (3: 1) (C) (467-7389)EACH2$4,500.00$4,300.00$6,140.00$4,150.00$5,500.00$5,000.00
52Clean existing culverts (480-7001)EACH12$2,000.00$1,500.00$2,000.00$2,817.00$1,350.00$1,900.00$500.00
53Removing structure (inlet) (496-7002)EACH1$2,000.00$500.00$808.00$1,800.00$1,800.00$500.00
54Removing structure (set) (496-7004)EACH124$480.00$250.00$260.00$525.00$100.00$690.00$500.00
55Removing structure (headwall) (496-7006)EACH3$1,500.00$5,000.00$1,704.00$1,100.00$1,800.00$1,500.00
56Removing structure (pipe) (496-7037)EACH53$575.00$400.00$1,100.00$542.00$325.00$650.00$250.00
57Removing rock riprap (496-7040)LF25$75.00$81.00$43.00$175.00$62.00$50.00
58Mobilization (500-7001)LS1$780,430$900,000$833,000$702,000$902,000$1,100,000$150,000
59Barricades, signs and traffic handling (502-7001)MO32$6,000.00$3,500.00$5,200.00$9,500.00$4,000.00$12,000$5,000.00
60Portable changeable message sign (503-7002)EACH8$7,000.00$11,500$11,000$3,370.00$12,600$7,500.00$10,000
61TMA (stationary) (505-7001)DAY826$250.00$50.00$100.00$175.00$110.00$240.00$400.00
62TMA (mobile operation) (505-7003)DAY21$225.00$550.00$730.00$972.00$640.00$240.00$500.00
63Rock filter dams (install) (type 1) (506-7001)LF325$35.00$33.00$32.00$32.00$40.00$42.00$70.00
64Rock filter dams (install) (type 2) (506-7002)LF2,275$35.00$35.00$37.00$37.00$43.00$45.00$70.00
65Rock filter dams (remove) (506-7011)LF2,600$10.00$10.00$10.00$10.00$11.00$12.00$10.00
66Construction exits (install) (type 1) (506-7020)SY278$32.00$20.00$38.00$38.00$43.00$45.00$10.00
67Construction exits (remove) (506-7024)SY278$10.00$10.00$12.00$12.00$11.00$12.00$2.00
68Temporary sediment control fence (install) (506-7039)LF19,375$4.20$3.00$4.00$3.50$4.00$4.20$4.00
69Temporary sediment control fence (remove) (506-7041)LF19,375$1.10$1.00$1.00$1.00$0.44$0.40$1.00
70Biodegradable erosion control logs (install) (12") (506-7044)LF2,340$5.50$5.50$5.00$5.20$6.00$6.30$5.00
71Biodegradable erosion control logs (remove) (506-7046)LF2,340$1.50$1.00$1.00$1.00$1.25$1.30$1.00
72Intersections (ACP) (530-7002)SY161$60.00$60.00$30.00$80.00$120.00$100.00$275.00
73Driveways (ACP) (530-7010)SY1,866$50.00$55.00$53.00$68.00$100.00$100.00$50.00
74Driveways (surface treat) (530-7016)SY4,033$25.00$28.00$36.00$45.00$67.00$41.00$8.00
75Turnouts (surface treat) (530-7019)SY168$46.00$60.00$34.00$70.00$63.00$41.00$30.00
76Remove metal beam guard fence (542-7001)LF400$5.00$32.00$3.00$5.00$11.00$20.00
77Remove terminal anchor section (542-7002)EACH1$500.00$3,500.00$250.00$500.00$1,100.00$1,500.00
78Guardrail end treatment (remove) (544-7003)EACH9$500.00$350.00$275.00$500.00$1,100.00$500.00
79Mailbox install-S (TWW-post) type 4 (560-7008)EACH8$300.00$360.00$230.00$225.00$355.00$230.00$300.00
80Mailbox install-D (TWW-post) type 4 (560-7009)EACH5$350.00$450.00$250.00$250.00$445.00$250.00$400.00
81Mailbox install-M (TWW-post) type 4 (560-7010)EACH2$400.00$850.00$650.00$650.00$850.00$690.00$400.00
82Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH43$750.00$600.00$670.00$670.00$565.00$790.00$1,500.00
83Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH3$840.00$700.00$780.00$780.00$685.00$950.00$1,500.00
84Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025)EACH1$825.00$850.00$850.00$850.00$815.00$950.00$1,500.00
85Remove SM RD SN sup&AM (644-7073)EACH37$120.00$150.00$100.00$100.00$150.00$110.00$200.00
86Install object marker assembly (OM-2Z)(WFLX)GND (658-7058)EACH32$100.00$85.00$70.00$70.00$85.00$90.00$250.00
87Remove delin & object marker assms (658-7078)EACH27$17.00$25.00$15.00$15.00$25.00$11.00$100.00
88Install OM SM RD sign (1-OM-PW)R (658-7318)EACH9$35.00$30.00$13.00$13.00$85.00$11.00$100.00
89Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF4,250$0.50$0.23$0.20$0.22$0.22$0.23$1.00
90Work zone pavement marking non-removing (W)6"(DOT) (662-7006)LF713$2.00$0.36$0.35$0.35$0.35$0.37$1.00
91Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF57,685$0.40$0.17$0.15$0.16$0.16$0.17$1.00
92Work zone pavement marking non-removing (W)8"(DOT) (662-7010)LF40$2.25$0.66$0.65$0.65$0.65$0.68$1.00
93Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF805$0.80$0.45$0.40$0.40$0.40$0.42$1.00
94Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF150$5.00$3.15$3.00$3.10$3.10$3.26$5.00
95Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH8$78.00$70.00$65.00$65.00$65.00$68.25$250.00
96Work zone pavement marking non-removing(W)(word) (662-7030)EACH2$92.00$85.00$80.00$80.00$80.00$84.00$250.00
97Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF1,305$0.23$0.20$0.22$0.22$0.23$1.00
98Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF61,406$0.40$0.23$0.20$0.22$0.22$0.23$1.00
99Work zone pavement marking non-removing (Y)24"(solid) (662-7042)LF791$5.00$3.00$3.00$2.85$2.85$2.99$5.00
100Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH5,464$1.30$1.50$1.00$1.10$1.00$0.90$2.00
101Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF713$1.50$1.15$1.00$1.10$1.10$1.16$5.00
102Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF40$1.20$2.00$2.00$1.85$1.85$1.94$2.00
103Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF805$1.00$1.30$1.00$1.25$1.25$1.31$2.00
104Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF150$7.50$15.00$14.00$14.00$14.00$14.70$10.00
105Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH8$160.00$200.00$190.00$185.00$185.00$195.00$500.00
106Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH2$200.00$220.00$200.00$200.00$200.00$210.00$500.00
107Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123)LF791$7.50$14.00$13.00$12.50$12.50$13.00$10.00
108Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF4,250$0.60$0.75$0.70$0.71$0.71$0.75$1.00
109Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF57,685$0.60$0.70$0.70$0.68$0.68$0.71$1.00
110Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF1,305$0.72$0.70$0.71$0.71$0.75$1.00
111Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF61,406$0.60$0.70$0.70$0.68$0.68$0.71$1.00
112PRFB rumble strip (BLK)(1')(centerline) (668-7002)LF24,329$2.00$0.75$0.75$0.73$0.73$0.77$5.00
113PRFB rumble strip (BLK)(1')(edgeline) (668-7137)LF55,688$2.00$0.75$0.70$0.71$0.71$0.75$5.00
114Reflectorized pavement marker type I-C (672-7002)EACH319$4.00$5.00$5.00$5.00$5.00$5.30$10.00
115Reflectorized pavement marker type II-A-A (672-7004)EACH2,566$4.00$5.00$5.00$4.75$4.75$5.00$10.00
116LED roadside sign (6066-7001)EACH1$3,000.00$4,000.00$3,800.00$3,750.00$3,750.00$3,700.00$10,000
TxDOT contract A00206631: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of November 4, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.