TxDOT contract A00210045 bid tabulation

Preventive Maintenance, IH 10 (END OF CONCRETE SH 99, EAST to 0.17 MILES EAST of FM 565). Let by Texas DOT on July 2, 2026, Chambers, Beaumont District. 3 bids received; low bid $3,332,075 by Durwood Greene Construction Co., -3.7% against the engineer's estimate of $3,459,416.

Owner
Texas DOT
Letting
02 JUL 2026
Pay items
93
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Durwood Greene Construction Co.$3,332,075Low-4.0%
2Cornerstone Paving and Construction, L.L.C.$3,335,4950.0%-4.0%
3Texas Materials Group, Inc.$3,405,302+2.0%-2.0%
TxDOT contract A00210045: bids by rank

Engineer's estimate: $3,459,416.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Durwood Greene Construction Co.2. Cornerstone Paving and Construction, L.L.C.3. Texas Materials Group, Inc.
1Removing concrete (mowstrip) (104-7003)SY1,297$34.18$27.00$15.00$36.50
2Embankment (final)(OC)(type C) (132-7005)CY74$6.00$100.00$85.00$95.30
3Backfill (type A or B) (134-7004)STA195$29.00$125.00$325.00$233.30
4Hydro mulch seed (permanent_rural_sandy) (164-7017)SY24,750$0.60$0.50$0.49$0.40
5Vegetative watering (168-7001)TGL209$45.00$30.00$10.00$41.00
6Asphalt (AC-20-5TR) (316-7007)GAL20,431$4.00$4.20$4.30$4.10
7Aggregate (type-PB or PL, GR-4)(sac-A) (316-7241)CY437$225.00$220.00$173.00$298.50
8D-GR HMA type D sac-A PG76-22 (exempt) (341-7068)TON4,682$150.00$135.00$136.70$134.30
9Tack coat (341-7082)GAL2,270$3.20$3.50$4.50$4.10
10Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009)TON6,243$160.00$217.00$179.00$185.00
11Tack coat (346-7028)GAL2,270$4.00$3.50$4.50$4.00
12Flexible pavement structure repair(10") (351-7009)SY3,000$70.00$42.00$87.00$100.40
13Planing asphalt concrete pavement(0" to 2") (354-7032)SY7,313$3.00$4.00$1.00$12.50
14Planing asphalt concrete pavement (1.5") (354-7074)SY56,754$3.90$1.50$2.45$1.70
15Plane & text asphalt concrete pavement(0" to 1.5") (354-7091)SY162$3.00$14.00$15.50$10.30
16Riprap (mow strip)(4 in) (432-7013)CY147$642.00$850.00$675.00$710.40
17Cleaning and sealing existing joints (438-7001)LF1,043$10.00$7.00$32.00$8.50
18Concrete box culvert (5 FT X 3 FT)(extend) (462-7062)LF20$787.00$1,100.00$900.00$1,180.00
19Wingwall (PW - 2) (HW=4 FT) (466-7188)EACH1$12,000$23,000$9,500.00$13,663
20Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH4$2,100.00$3,000.00$2,500.00$2,618.00
21Removing structure (wingwall) (496-7005)EACH1$3,400.00$2,000.00$1,500.00$5,490.00
22Mobilization (500-7001)LS1$34,290$120,000$210,000$125,990
23Barricades, signs and traffic handling (502-7001)MO7$11,800$7,000.00$4,000.00$1,308.00
24TMA (stationary) (505-7001)DAY75$326.00$350.00$250.00$274.00
25TMA (mobile operation) (505-7003)DAY15$158.00$350.00$250.00$457.00
26Biodegradable erosion control logs (install) (12") (506-7044)LF660$20.00$10.00$7.00$5.50
27Biodegradable erosion control logs (remove) (506-7046)LF660$6.00$2.00$1.00$1.10
28Intersections (ACP) (530-7002)SY1,944$110.00$35.00$35.00$46.30
29Driveways (ACP) (530-7010)SY1,334$75.00$30.00$49.10$54.30
30Driveways (base) (530-7015)SY101$32.00$70.00$48.00$62.40
31Turnouts (ACP) (530-7018)SY77$72.00$70.00$78.70$165.50
32Metal W-beam guard fence (timber post) (540-7001)LF1,800$30.00$28.00$25.50$27.80
33Metal beam guard fence trans (thrie-beam) (540-7005)EACH7$2,000.00$2,250.00$1,950.00$2,178.00
34Connector plate for thrie beam (540-7030)EACH7$997.00$1,000.00$650.00$828.00
35Remove metal beam guard fence (542-7001)LF1,800$4.00$3.00$3.50$2.80
36Remove downstream anchor terminal (542-7003)EACH3$250.00$300.00$350.00$272.30
37Guardrail end treatment (install) (544-7001)EACH3$3,500.00$3,350.00$3,100.00$3,212.00
38Guardrail end treatment (move & reset) (544-7002)EACH16$5,000.00$1,100.00$3,150.00$980.00
39Mailbox install-S (TWW-post) type 4 (560-7008)EACH6$250.00$320.00$300.00$300.00
40Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH18$750.00$690.00$625.00$653.50
41Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH22$800.00$775.00$725.00$773.10
42Install small roadside sign support and assembly type 10BWG(1)SA(T-2EXT) (644-7005)EACH1$908.00$800.00$850.00$800.00
43Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH1$1,100.00$950.00$850.00$956.00
44Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009)EACH4$900.00$900.00$625.00$819.00
45Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012)EACH4$933.00$950.00$725.00$866.00
46Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025)EACH1$800.00$1,400.00$750.00$1,236.00
47Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH1$980.00$1,500.00$850.00$1,360.00
48Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH4$1,000.00$1,250.00$950.00$1,236.00
49Install small roadside sign support and assembly TYS80(1)SB(P) (644-7037)EACH2$1,166.00$1,050.00$775.00$1,024.00
50Install small roadside sign support and assembly TYS80(1)SB(T) (644-7040)EACH1$1,095.00$1,400.00$850.00$1,323.00
51Install small roadside sign support and assembly TYS80(1)SB(U) (644-7042)EACH2$2,555.00$1,170.00$950.00$1,089.00
52Install small roadside sign support and assembly TYS80(1)SB(U-WC) (644-7046)EACH1$2,000.00$1,600.00$1,000.00$1,574.00
53Remove SM RD SN sup&AM (644-7073)EACH62$9.60$110.00$75.00$104.00
54Install delineator assembly (D-SW)SZ 1(WFLX)GF2 (658-7001)EACH28$49.00$40.00$25.00$39.00
55Install delineator assembly (D-SW)SZ 1(BRF)CTB (BR) (658-7014)EACH12$5.30$30.00$15.00$27.00
56Install object marker assembly (OM-2Z)(WFLX)GND (658-7058)EACH2$110.70$120.00$150.00$114.00
57Remove delin & object marker assms (658-7078)EACH104$44.80$12.00$5.00$11.00
58Install OM SM RD sign (1-OM-PW)Y (658-7317)EACH37$11.35$30.00$50.00$30.00
59Install OM SM RD sign (1-OM-PW)R (658-7318)EACH25$20.80$30.00$50.00$30.00
60Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF5,050$1.00$0.30$0.40$0.30
61Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF19,297$1.00$0.30$0.40$0.30
62Work zone pavement marking non-removing (W)8"(DOT) (662-7010)LF273$1.00$2.00$0.50$0.90
63Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF6,094$1.00$0.60$0.40$0.50
64Work zone pavement marking non-removing (W)12"(solid) (662-7015)LF290$3.00$4.00$2.00$2.18
65Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH16$74.00$90.00$50.00$87.10
66Work zone pavement marking non-removing (W)(uturn arrow) (662-7027)EACH2$114.00$200.00$75.00$164.00
67Work zone pavement marking non-removing(W)(word) (662-7030)EACH15$80.00$175.00$50.00$109.00
68Work zone pavement marking non-removing(W)36"(yld tri) (662-7032)EACH2$39.00$28.00$10.00$27.30
69Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF20,527$1.00$0.30$0.40$0.30
70Work zone pavement marking non-removing (Y)12"(solid) (662-7040)LF1,794$2.00$2.20$2.00$2.20
71Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH1,570$1.00$2.50$2.00$0.30
72Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH1,568$2.00$2.50$2.00$0.30
73Reflectorized pavement marking type I (W)8"(DOT)(090MIL) (666-7017)LF273$1.00$3.00$2.00$0.15
74Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029)LF290$2.00$5.00$3.50$4.40
75Reflectorized pavement marking type I(W)(entr gore)(090MIL) (666-7068)EACH11$300.00$740.00$500.00$707.80
76Reflectorized pavement marking type I(W)(exit gore)(090MIL) (666-7071)EACH4$500.00$900.00$500.00$871.00
77Ref pavement marking type I(W)36"(yld tri)(090MIL) (666-7089)EACH2$75.00$70.00$35.00$54.50
78Reflectorized pavement marking type I (Y)12"(solid)(090MIL) (666-7116)LF1,794$2.00$4.40$3.50$4.40
79Reflectorized pavement marking type II (W) 8" (solid) (666-7179)LF6,094$1.00$0.60$0.50$0.40
80Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407)LF5,050$1.00$0.65$0.75$0.70
81Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410)LF19,297$1.00$0.65$0.67$0.70
82Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422)LF20,527$1.00$0.65$0.67$0.70
83Prefabricated PM type C (W)(24")(solid) (668-7089)LF14$10.00$25.00$16.00$21.80
84Prefabricated PM type C (W)(arrow) (668-7091)EACH16$340.00$250.00$250.00$255.90
85Prefabricated PM type C (W)(double arrow) (668-7093)EACH5$397.00$450.00$350.00$457.40
86Prefabricated PM type C (W)(uturn arrow) (668-7096)EACH2$290.00$430.00$350.00$420.00
87Prefabricated PM type C (W)(word) (668-7103)EACH15$550.00$300.00$275.00$300.00
88Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH2$53.00$90.00$25.00$54.50
89Reflectorized pavement marker type II-A-A (672-7004)EACH25$8.00$6.50$5.50$6.50
90Reflectorized pavement marker type II-C-R (672-7006)EACH372$10.00$6.50$5.50$6.50
91Full - width mowing (730-7019)CYC2$4,700.00$5,000.00$3,500.00$500.00
92Litter removal (734-7002)CYC2$3,500.00$1,700.00$1,500.00$500.00
93Cleaning / sweeping (frontage road) (738-7050)CYC2$2,600.00$3,200.00$3,500.00$500.00
TxDOT contract A00210045: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 2, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy