TxDOT contract A00210039 bid tabulation
Preventive Maintenance, US 90 (FM 2830, EAST to FM 770 NORTH). Let by Texas DOT on July 2, 2026, Liberty, Beaumont District. 3 bids received; low bid $1,939,953 by Texas Materials Group, Inc., -8.0% against the engineer's estimate of $2,109,577.
- Owner
- Texas DOT
- Letting
- 02 JUL 2026
- Pay items
- 39
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Texas Materials Group, Inc. | $1,939,953 | Low | -8.0% |
| 2 | Durwood Greene Construction Co. | $1,969,127 | +2.0% | -7.0% |
| 3 | Hayden Paving, Inc. | $1,990,204 | +3.0% | -6.0% |
Engineer's estimate: $2,109,577.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Texas Materials Group, Inc. | 2. Durwood Greene Construction Co. | 3. Hayden Paving, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 19 | $1,600.00 | $2,614.00 | $700.00 | $1,300.00 |
| 2 | Backfill (type A or B) (134-7004) | STA | 82.77 | $158.00 | $209.25 | $225.00 | $470.00 |
| 3 | Hydro mulch seed (permanent_rural_clay_hel) (164-7072) | SY | 9,195 | $0.60 | $0.40 | $0.50 | $0.62 |
| 4 | Vegetative watering (168-7001) | TGL | 12.90 | $29.00 | $95.75 | $75.00 | $528.00 |
| 5 | D-GR HMA type D PG64-22 (341-7043) | TON | 3,338 | $120.00 | $130.00 | $132.00 | $146.00 |
| 6 | Tack coat (341-7082) | GAL | 2,428 | $5.00 | $4.25 | $4.00 | $4.50 |
| 7 | SP mixes SP-C sac-A PG76-22 (344-7030) | TON | 4,451 | $130.00 | $150.25 | $177.00 | $179.00 |
| 8 | Tack coat (344-7077) | GAL | 2,428 | $4.00 | $4.25 | $4.00 | $4.50 |
| 9 | Flexible pavement structure repair(10") (351-7009) | SY | 600 | $100.00 | $91.00 | $110.00 | $127.00 |
| 10 | Plan asphalt concrete pavement (3.5") (354-7080) | SY | 2,029 | $5.00 | $4.75 | $10.00 | $4.50 |
| 11 | Plane asphalt pavement (0" to 3.5") (354-7095) | SY | 5,289 | $6.50 | $9.75 | $8.00 | $2.30 |
| 12 | Full-depth repair CPJR (var depth) (361-7046) | CY | 180 | $1,200.00 | $1,481.25 | $640.00 | $1,020.00 |
| 13 | Riprap (mow strip)(4 in) (432-7013) | CY | 9.25 | $50.00 | $835.75 | $1,500.00 | $790.00 |
| 14 | Mobilization (500-7001) | LS | 1 | $275,000 | $147,000 | $85,000 | $75,000 |
| 15 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $50,000 | $883.75 | $10,000 | $2,200.00 |
| 16 | Portable changeable message sign (503-7001) | DAY | 60 | $120.00 | $130.75 | $300.00 | $65.00 |
| 17 | TMA (stationary) (505-7001) | DAY | 120 | $350.00 | $330.00 | $250.00 | $330.00 |
| 18 | TMA (mobile operation) (505-7003) | DAY | 10 | $350.00 | $760.00 | $300.00 | $700.00 |
| 19 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 1,000 | $8.00 | $7.50 | $8.00 | $8.95 |
| 20 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,000 | $2.20 | $1.05 | $2.00 | $1.70 |
| 21 | Intrsct, drvways, & turnout (ACP) (530-7022) | SY | 1,200 | $55.00 | $20.25 | $75.00 | $45.00 |
| 22 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 16,600 | $0.50 | $0.75 | $0.50 | $0.30 |
| 23 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 8,300 | $0.50 | $0.29 | $0.50 | $0.30 |
| 24 | Metal W-beam guard fence (timber post) (540-7001) | LF | 575 | $10.00 | $27.25 | $35.00 | $26.50 |
| 25 | Metal thrie-beam guard fence (timber post) (540-7003) | LF | 20 | $15.00 | $89.00 | $140.00 | $129.00 |
| 26 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $5,000.00 | $3,081.25 | $3,950.00 | $3,510.00 |
| 27 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 62 | $60.00 | $621.50 | $750.00 | $725.00 |
| 28 | Install OM SM RD sign (1-OM-PW)R (658-7318) | EACH | 8 | $10.00 | $28.75 | $35.00 | $22.30 |
| 29 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 20 | $2.00 | $15.75 | $2.50 | $0.80 |
| 30 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 1,600 | $2.00 | $1.00 | $2.50 | $0.80 |
| 31 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 1,000 | $1.60 | $1.00 | $1.50 | $1.00 |
| 32 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 16,600 | $1.00 | $0.60 | $0.70 | $0.62 |
| 33 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 6,000 | $0.60 | $0.60 | $0.70 | $0.70 |
| 34 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 1,000 | $0.70 | $0.66 | $0.70 | $0.70 |
| 35 | PRFB rumble strip (BLK)(4')(transverse) (668-7001) | LF | 320 | $11.60 | $14.75 | $10.00 | $17.60 |
| 36 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 300 | $14.00 | $13.50 | $22.00 | $15.94 |
| 37 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 10 | $370.00 | $235.00 | $300.00 | $251.00 |
| 38 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 12 | $6.50 | $51.25 | $110.00 | $55.00 |
| 39 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 700 | $6.50 | $4.25 | $8.50 | $4.40 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 2, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.