TxDOT contract A00216480 bid tabulation
Resurface Roadway, FM 1640 (SS 529 to W of FM 2218). Let by Texas DOT on June 3, 2026, Fort Bend, Houston District. 5 bids received; low bid $3,065,936 by Durwood Greene Construction Co., +7.2% against the engineer's estimate of $2,859,279.
- Owner
- Texas DOT
- Letting
- 03 JUN 2026
- Pay items
- 47
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Durwood Greene Construction Co. | $3,065,936 | Low | +7.0% |
| 2 | Cornerstone Paving and Construction, L.L.C. | $3,397,769 | +11% | +19% |
| 3 | Environmental Allies, Inc. | $3,432,320 | +12% | +20% |
| 4 | Hayden Paving, Inc. | $3,605,548 | +18% | +26% |
| 5 | Texas Materials Group, Inc. | $3,620,628 | +18% | +27% |
Engineer's estimate: $2,859,279.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Durwood Greene Construction Co. | 2. Cornerstone Paving and Construction, L.L.C. | 3. Environmental Allies, Inc. | 4. Hayden Paving, Inc. | 5. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Asphalt (AC-20-5TR) (316-7007) | GAL | 6,612 | $4.25 | $5.40 | $4.45 | $8.15 | $4.00 | |
| 2 | Aggregate (type-PB, GR-4)(sac-B) (316-7211) | CY | 153 | $190.00 | $190.60 | $300.00 | $620.00 | $329.00 | |
| 3 | D-GR HMA type D sac-A PG76-22 (341-7057) | TON | 13,447 | $134.00 | $158.00 | $151.60 | $163.50 | $165.00 | $164.00 |
| 4 | Tack coat (341-7082) | GAL | 11,427 | $1.00 | $2.00 | $4.00 | $4.60 | $3.50 | $4.10 |
| 5 | Flexible pavement structure repair(10") (351-7009) | SY | 5,227 | $60.00 | $40.00 | $85.40 | $75.00 | $112.00 | $101.40 |
| 6 | Flexible pavement structure repair(12") (351-7011) | SY | 640 | $65.00 | $135.00 | $95.00 | $125.00 | $136.10 | |
| 7 | Planing asphalt concrete pavement(2") (354-7051) | SY | 122,259 | $1.90 | $2.50 | $2.73 | $2.05 | $1.55 | $3.00 |
| 8 | Mobilization (500-7001) | LS | 1 | $212,000 | $85,000 | $200,000 | $100,109 | $59,800 | $105,000 |
| 9 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $6,000.00 | $4,500.00 | $4,500.00 | $11,000 | $15,000 | $1,880.70 |
| 10 | TMA (stationary) (505-7001) | DAY | 54 | $200.00 | $350.00 | $125.00 | $325.00 | $290.00 | $500.00 |
| 11 | TMA (mobile operation) (505-7003) | DAY | 40 | $200.00 | $250.00 | $50.00 | $500.00 | $590.00 | $10.00 |
| 12 | Install delineator assembly (D-DW)SZ1(WFLX)SRFHH(BR) (658-7336) | EACH | 47 | $110.00 | $150.00 | $150.00 | $127.00 | $132.00 | $38.00 |
| 13 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 11,460 | $0.30 | $0.32 | $0.30 | $0.50 | $0.35 | $0.40 |
| 14 | Work zone pavement marking non-removing (W)6"(DOT) (662-7006) | LF | 58 | $0.50 | $1.00 | $0.30 | $1.10 | $0.35 | $1.60 |
| 15 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 11,168 | $0.30 | $0.32 | $0.30 | $0.45 | $0.35 | $0.40 |
| 16 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 1,976 | $0.70 | $0.50 | $0.40 | $0.80 | $0.46 | $0.70 |
| 17 | Work zone pavement marking non-removing (W)12"(solid) (662-7015) | LF | 482 | $1.20 | $2.50 | $2.00 | $2.00 | $2.30 | $2.20 |
| 18 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 3,020 | $2.00 | $4.00 | $3.75 | $3.30 | $4.25 | $4.30 |
| 19 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 44 | $65.00 | $75.00 | $65.00 | $150.00 | $75.00 | $103.00 |
| 20 | Work zone pavement marking non-removing (W)(double arrow) (662-7019) | EACH | 24 | $75.00 | $120.00 | $95.00 | $220.00 | $110.00 | $125.00 |
| 21 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 16 | $65.00 | $85.00 | $65.00 | $145.00 | $75.00 | $103.00 |
| 22 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 3,640 | $0.30 | $0.32 | $0.30 | $0.50 | $0.35 | $0.40 |
| 23 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 25,122 | $0.30 | $0.32 | $0.30 | $0.45 | $0.35 | $0.40 |
| 24 | Work zone pavement marking non-removing (Y)8"(solid) (662-7039) | LF | 517 | $0.70 | $0.50 | $0.40 | $1.60 | $0.50 | $0.70 |
| 25 | Work zone pavement marking non-removing (Y)12"(solid) (662-7040) | LF | 796 | $1.20 | $2.50 | $2.00 | $1.60 | $2.30 | $2.20 |
| 26 | Work zone pavement marking non-removing (Y)24"(solid) (662-7042) | LF | 86 | $2.00 | $7.00 | $4.00 | $5.50 | $4.55 | $4.30 |
| 27 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 4,142 | $1.05 | $1.50 | $1.20 | $1.75 | $1.15 | $0.50 |
| 28 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 2,774 | $1.05 | $1.50 | $1.00 | $1.75 | $1.15 | $0.50 |
| 29 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 58 | $2.25 | $2.00 | $1.00 | $2.20 | $1.15 | $3.90 |
| 30 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 1,976 | $1.40 | $1.50 | $1.00 | $1.45 | $1.15 | $1.00 |
| 31 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 482 | $3.00 | $4.00 | $3.50 | $3.85 | $4.00 | $3.25 |
| 32 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 3,020 | $6.00 | $7.00 | $6.00 | $10.00 | $6.80 | $6.50 |
| 33 | Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114) | LF | 517 | $2.00 | $1.50 | $1.00 | $1.50 | $1.15 | $1.00 |
| 34 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 796 | $3.00 | $4.00 | $3.50 | $2.85 | $4.00 | $4.40 |
| 35 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 86 | $8.00 | $9.00 | $6.00 | $12.00 | $6.80 | $8.70 |
| 36 | All-wther PM type I (W)6"(solid)(100MIL) (666-7309) | LF | 11,168 | $0.90 | $0.85 | $0.81 | $1.10 | $0.91 | $0.80 |
| 37 | All-wther PM type I (W)6"(broken)(100MIL) (666-7310) | LF | 11,460 | $0.90 | $0.85 | $0.81 | $1.25 | $0.91 | $0.80 |
| 38 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 25,121 | $0.90 | $0.85 | $0.81 | $1.10 | $0.91 | $0.80 |
| 39 | All-wther PM type I (Y)6"(broken)(100MIL) (666-7316) | LF | 3,640 | $0.90 | $0.85 | $0.81 | $1.25 | $0.91 | $0.80 |
| 40 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 44 | $207.00 | $250.00 | $225.00 | $255.00 | $260.00 | $271.80 |
| 41 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 24 | $293.00 | $300.00 | $265.00 | $370.00 | $305.00 | $494.70 |
| 42 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 16 | $220.00 | $250.00 | $225.00 | $350.00 | $255.00 | $380.50 |
| 43 | Reflectorized pavement marker type I-C (672-7002) | EACH | 412 | $6.00 | $6.50 | $6.00 | $5.50 | $6.80 | $7.00 |
| 44 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 763 | $6.00 | $6.50 | $6.00 | $5.50 | $6.80 | $7.00 |
| 45 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 331 | $6.00 | $6.50 | $6.00 | $5.50 | $6.80 | $7.00 |
| 46 | Eliminating existing PM & markers (12") (677-7006) | LF | 1,936 | $1.00 | $1.70 | $1.50 | $3.30 | $1.70 | $1.60 |
| 47 | Eliminating existing PM & markers (24") (677-7008) | LF | 50 | $3.50 | $2.50 | $2.20 | $2.85 | $2.50 | $3.20 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 3, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.