TxDOT contract A00187526 bid tabulation
Rehabilitate Existing Roadway, US 290 (FM 1371 to Waller County Line). Let by Texas DOT on August 6, 2026, Washington, Bryan District. 6 bids received; low bid $4,287,440 by Big Creek Construction, LTD., +1.7% against the engineer's estimate of $4,214,219.
- Owner
- Texas DOT
- Letting
- 06 AUG 2026
- Pay items
- 73
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Big Creek Construction, LTD. | $4,287,440 | Low | +2.0% |
| 2 | Knife River Corporation - South | $4,492,337 | +5.0% | +7.0% |
| 3 | Brazos Paving, Inc. | $4,729,455 | +10% | +12% |
| 4 | Texas Materials Group, Inc. | $5,033,419 | +17% | +19% |
| 5 | Larry Young Paving, Inc. | $5,034,763 | +17% | +19% |
| 6 | Durwood Greene Construction Co. | $6,119,401 | +43% | +45% |
Engineer's estimate: $4,214,219.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Big Creek Construction, LTD. | 2. Knife River Corporation - South | 3. Brazos Paving, Inc. | 4. Texas Materials Group, Inc. | 5. Larry Young Paving, Inc. | 6. Durwood Greene Construction Co. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (driveways) (104-7011) | SY | 86 | $20.00 | $30.00 | $23.85 | $31.25 | $60.00 | $19.00 | $45.00 |
| 2 | Remove (18") TRT/untrt base & asphalt pavement (105-7038) | SY | 6,956 | $8.00 | $15.00 | $11.55 | $14.00 | $18.00 | $18.00 | $35.00 |
| 3 | Backfill (type A or B) (134-7004) | STA | 161.77 | $186.00 | $250.00 | $124.00 | $177.00 | $190.00 | $230.00 | $300.00 |
| 4 | Blading (150-7001) | STA | 36.60 | $85.00 | $200.00 | $15.00 | $194.00 | $100.00 | $130.00 | $125.00 |
| 5 | Furn & place topsoil (4") (160-7002) | SY | 13,742 | $1.10 | $1.00 | $0.94 | $1.00 | $0.35 | $1.00 | $2.50 |
| 6 | Broadcast seed (permanent_rural_clay) (164-7002) | SY | 13,742 | $0.30 | $0.22 | $0.24 | $0.25 | $0.30 | $0.25 | $0.40 |
| 7 | Broadcast seed (temporary_warm_cool) (164-7007) | SY | 13,742 | $0.27 | $0.17 | $0.18 | $0.20 | $0.30 | $0.25 | $0.40 |
| 8 | Vegetative watering (168-7001) | TGL | 1,374 | $7.25 | $5.00 | $14.50 | $33.50 | $1.00 | $41.00 | $12.00 |
| 9 | Lime (com or QK)(slurry) or QK(dry) (260-7001) | TON | 75 | $344.00 | $350.00 | $400.00 | $389.00 | $365.00 | $470.00 | $400.00 |
| 10 | Lime TRT (existing material)(8") (260-7007) | SY | 7,561 | $2.35 | $5.00 | $3.82 | $4.75 | $7.70 | $7.25 | $10.00 |
| 11 | Cem TRT(PLNT MX)(CL M)(tya)(GR1-2)(12") (276-7209) | SY | 6,956 | $44.45 | $65.00 | $55.46 | $52.00 | $65.00 | $54.00 | $75.00 |
| 12 | Prime coat (AE-P) (310-7001) | GAL | 1,512 | $5.10 | $6.00 | $5.20 | $4.50 | $6.60 | $6.50 | $10.00 |
| 13 | PFC-C PG76-22 sac-A (342-7001) | TON | 5,053 | $170.00 | $165.00 | $195.00 | $191.60 | $214.00 | $230.00 | $225.00 |
| 14 | Tack coat (342-7015) | GAL | 7,245 | $2.75 | $3.00 | $2.96 | $4.65 | $3.10 | $3.75 | $4.00 |
| 15 | SP mixes SP-B PG64-22 (344-7001) | TON | 3,775 | $115.00 | $110.00 | $114.20 | $122.80 | $116.00 | $140.00 | $150.00 |
| 16 | SP mixes SP-C PG70-22 (344-7019) | TON | 9,962 | $135.00 | $110.00 | $124.60 | $142.50 | $141.00 | $150.00 | $160.00 |
| 17 | Tack coat (344-7077) | GAL | 8,265 | $3.40 | $3.00 | $2.96 | $4.65 | $3.10 | $4.00 | $4.00 |
| 18 | Plane & text asphalt concrete pavement(1.5") (354-7018) | SY | 50,241 | $1.75 | $2.00 | $1.99 | $1.50 | $1.90 | $1.50 | $3.00 |
| 19 | Planing asphalt concrete pavement(4") (354-7053) | SY | 9,758 | $3.00 | $4.00 | $3.59 | $3.00 | $5.00 | $4.00 | $9.00 |
| 20 | Plane & text concrete pavement(1.5" - 4") (354-7100) | SY | 2,534 | $2.50 | $4.00 | $4.00 | $4.50 | $8.00 | $3.50 | $9.00 |
| 21 | Class C concrete (miscellaneous) (420-7067) | CY | 2 | $1,800.00 | $4,000.00 | $12,700 | $1,225.00 | $8,000.00 | $500.00 | $2,400.00 |
| 22 | Riprap (mow strip)(4 in) (432-7013) | CY | 202.10 | $526.00 | $650.00 | $767.00 | $506.75 | $710.00 | $690.00 | $900.00 |
| 23 | Mobilization (500-7001) | LS | 1 | $200,677 | $222,000 | $137,000 | $195,500 | $326,400 | $110,000 | $300,000 |
| 24 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $6,000.00 | $5,000.00 | $7,680.00 | $8,157.00 | $1,405.66 | $9,800.00 | $12,000 |
| 25 | Portable changeable message sign (503-7002) | EACH | 2 | $7,000.00 | $9,000.00 | $4,460.00 | $7,235.00 | $19,800 | $2,400.00 | $10,000 |
| 26 | TMA (stationary) (505-7001) | DAY | 98 | $200.00 | $250.00 | $400.00 | $230.00 | $13.00 | $260.00 | $350.00 |
| 27 | TMA (mobile operation) (505-7003) | DAY | 12 | $250.00 | $500.00 | $850.00 | $626.00 | $660.00 | $660.00 | $350.00 |
| 28 | Rock filter dams (install) (type 2) (506-7002) | LF | 160 | $50.00 | $40.00 | $39.00 | $42.00 | $48.00 | $45.00 | $60.00 |
| 29 | Rock filter dams (remove) (506-7011) | LF | 160 | $12.20 | $12.00 | $11.00 | $12.00 | $12.00 | $13.00 | $15.00 |
| 30 | Temporary sediment control fence (install) (506-7039) | LF | 2,740 | $3.60 | $4.50 | $3.60 | $4.00 | $4.20 | $4.25 | $4.50 |
| 31 | Temporary sediment control fence (remove) (506-7041) | LF | 2,740 | $1.00 | $1.00 | $1.10 | $1.20 | $0.89 | $1.25 | $1.00 |
| 32 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 2,430 | $40.00 | $30.00 | $70.30 | $74.50 | $46.00 | $24.00 | $75.00 |
| 33 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 1,710 | $10.00 | $16.00 | $11.50 | $10.75 | $13.40 | $11.00 | $25.00 |
| 34 | Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053) | LF | 2,430 | $18.00 | $17.00 | $11.00 | $10.50 | $12.80 | $8.50 | $22.00 |
| 35 | Driveways (concrete) (530-7006) | SY | 86 | $100.00 | $150.00 | $187.00 | $101.00 | $135.00 | $180.00 | $200.00 |
| 36 | Driveways (ACP) (530-7010) | SY | 1,361 | $55.00 | $35.00 | $33.00 | $28.00 | $37.00 | $22.00 | $35.00 |
| 37 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 37,832 | $0.25 | $0.35 | $0.18 | $0.25 | $0.34 | $0.50 | $0.36 |
| 38 | Fill milled asphalt rumble strips (shoulder) (533-7005) | LF | 12,190 | $2.50 | $3.50 | $1.70 | $0.30 | $3.00 | $2.50 | $12.50 |
| 39 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,150 | $26.00 | $30.00 | $27.22 | $30.50 | $25.43 | $32.00 | $29.00 |
| 40 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,255.00 | $2,500.00 | $2,921.00 | $2,350.00 | $1,964.65 | $2,800.00 | $3,100.00 |
| 41 | Downstream anchor terminal section (540-7015) | EACH | 2 | $1,350.00 | $1,800.00 | $1,761.00 | $1,560.00 | $1,304.02 | $2,100.00 | $1,850.00 |
| 42 | Remove metal beam guard fence (542-7001) | LF | 1,150 | $2.50 | $4.00 | $2.20 | $7.25 | $6.00 | $2.50 | $3.00 |
| 43 | Remove terminal anchor section (542-7002) | EACH | 1 | $200.00 | $300.00 | $278.00 | $720.00 | $601.98 | $320.00 | $300.00 |
| 44 | Remove downstream anchor terminal (542-7003) | EACH | 1 | $150.00 | $300.00 | $220.00 | $258.00 | $215.36 | $260.00 | $300.00 |
| 45 | Cable barrier system (install)(TL-4) (543-7002) | LF | 3,660 | $11.00 | $30.00 | $22.50 | $21.50 | $30.00 | $28.00 | $22.00 |
| 46 | Cable barrier terminal sec (install)(TL-4) (543-7018) | EACH | 6 | $1,800.00 | $5,000.00 | $3,611.00 | $5,381.00 | $5,000.00 | $6,900.00 | $5,500.00 |
| 47 | Guardrail end treatment (install) (544-7001) | EACH | 2 | $3,155.00 | $3,500.00 | $3,722.00 | $4,500.00 | $3,737.58 | $4,300.00 | $3,950.00 |
| 48 | Guardrail end treatment (remove) (544-7003) | EACH | 2 | $240.00 | $300.00 | $220.00 | $655.00 | $548.14 | $260.00 | $400.00 |
| 49 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 2 | $1,373.00 | $2,000.00 | $2,055.00 | $1,860.00 | $1,554.90 | $1,600.00 | $2,500.00 |
| 50 | Crash cushion attenuator (remove) (545-7004) | EACH | 3 | $753.00 | $1,750.00 | $1,000.00 | $1,200.00 | $975.24 | $1,000.00 | $1,100.00 |
| 51 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 3 | $8,667.00 | $5,500.00 | $8,500.00 | $10,400 | $8,687.50 | $8,500.00 | $9,200.00 |
| 52 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 92 | $12.00 | $25.00 | $30.00 | $18.50 | $15.52 | $32.00 | $32.00 |
| 53 | Install delineator assembly (D-DW)SZ 1(BRF)GF2 (658-7048) | EACH | 16 | $34.00 | $50.00 | $39.00 | $30.50 | $25.62 | $45.00 | $45.00 |
| 54 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 12,590 | $0.30 | $0.25 | $0.28 | $0.50 | $0.40 | $0.50 | $0.30 |
| 55 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 50,278 | $0.32 | $0.25 | $0.28 | $0.50 | $0.38 | $0.50 | $0.30 |
| 56 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 2,500 | $0.50 | $0.50 | $0.44 | $0.75 | $0.60 | $0.75 | $0.45 |
| 57 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 50,278 | $0.40 | $0.25 | $0.28 | $0.50 | $0.38 | $0.50 | $0.30 |
| 58 | Work zone pavement marking removing (reflectorized) type I-A (662-7047) | EACH | 261 | $8.00 | $4.00 | $4.40 | $6.00 | $5.00 | $6.50 | $4.40 |
| 59 | Work zone pavement marking removing (reflectorized) type II-C-R (662-7053) | EACH | 261 | $5.00 | $4.00 | $4.40 | $6.00 | $5.00 | $6.50 | $4.40 |
| 60 | Work zone pavement marking removing (traffic BTN) type W (662-7057) | EACH | 778 | $2.80 | $2.00 | $2.20 | $5.00 | $4.00 | $5.25 | $2.20 |
| 61 | Work zone pavement marking removing (traffic BTN) type Y (662-7059) | EACH | 778 | $2.00 | $2.00 | $2.20 | $5.00 | $4.00 | $5.25 | $2.20 |
| 62 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 3,770 | $1.40 | $1.50 | $1.50 | $1.00 | $1.00 | $0.50 | $3.50 |
| 63 | Reflectorized pavement marking type I (W)8"(DOT)(090MIL) (666-7017) | LF | 530 | $1.00 | $1.00 | $2.00 | $1.25 | $1.00 | $1.25 | $5.00 |
| 64 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 1,311 | $1.00 | $1.00 | $2.00 | $1.25 | $1.00 | $1.25 | $2.00 |
| 65 | Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035) | LF | 36 | $7.00 | $10.00 | $10.00 | $15.00 | $13.00 | $17.00 | $20.00 |
| 66 | Reflectorized pavement marking type I (W)(arrow)(090MIL) (666-7041) | EACH | 10 | $175.00 | $200.00 | $211.00 | $210.00 | $175.00 | $230.00 | $220.00 |
| 67 | Reflectorized pavement marking type I (W)(word)(090MIL) (666-7065) | EACH | 10 | $200.00 | $200.00 | $211.00 | $210.00 | $176.00 | $230.00 | $225.00 |
| 68 | Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407) | LF | 4,467 | $0.70 | $0.70 | $0.78 | $0.75 | $0.65 | $0.75 | $0.85 |
| 69 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 17,869 | $0.55 | $0.70 | $0.78 | $0.75 | $0.59 | $0.75 | $0.80 |
| 70 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 17,869 | $0.55 | $0.70 | $0.78 | $0.75 | $0.59 | $0.75 | $0.80 |
| 71 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 133 | $4.00 | $6.00 | $7.00 | $6.00 | $5.00 | $6.50 | $7.00 |
| 72 | Eliminating existing PM & markers (4") (677-7001) | LF | 7,740 | $0.40 | $0.50 | $0.44 | $0.75 | $0.65 | $0.75 | $0.45 |
| 73 | Pavement surface preparation for marking (6") (678-7002) | LF | 3,044 | $0.10 | $0.10 | $0.03 | $0.30 | $0.25 | $0.25 | $0.05 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 6, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.