TxDOT contract A00187526 bid tabulation

Rehabilitate Existing Roadway, US 290 (FM 1371 to Waller County Line). Let by Texas DOT on August 6, 2026, Washington, Bryan District. 6 bids received; low bid $4,287,440 by Big Creek Construction, LTD., +1.7% against the engineer's estimate of $4,214,219.

Owner
Texas DOT
Letting
06 AUG 2026
Pay items
73
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Big Creek Construction, LTD.$4,287,440Low+2.0%
2Knife River Corporation - South$4,492,337+5.0%+7.0%
3Brazos Paving, Inc.$4,729,455+10%+12%
4Texas Materials Group, Inc.$5,033,419+17%+19%
5Larry Young Paving, Inc.$5,034,763+17%+19%
6Durwood Greene Construction Co.$6,119,401+43%+45%
TxDOT contract A00187526: bids by rank

Engineer's estimate: $4,214,219.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Big Creek Construction, LTD.2. Knife River Corporation - South3. Brazos Paving, Inc.4. Texas Materials Group, Inc.5. Larry Young Paving, Inc.6. Durwood Greene Construction Co.
1Removing concrete (driveways) (104-7011)SY86$20.00$30.00$23.85$31.25$60.00$19.00$45.00
2Remove (18") TRT/untrt base & asphalt pavement (105-7038)SY6,956$8.00$15.00$11.55$14.00$18.00$18.00$35.00
3Backfill (type A or B) (134-7004)STA161.77$186.00$250.00$124.00$177.00$190.00$230.00$300.00
4Blading (150-7001)STA36.60$85.00$200.00$15.00$194.00$100.00$130.00$125.00
5Furn & place topsoil (4") (160-7002)SY13,742$1.10$1.00$0.94$1.00$0.35$1.00$2.50
6Broadcast seed (permanent_rural_clay) (164-7002)SY13,742$0.30$0.22$0.24$0.25$0.30$0.25$0.40
7Broadcast seed (temporary_warm_cool) (164-7007)SY13,742$0.27$0.17$0.18$0.20$0.30$0.25$0.40
8Vegetative watering (168-7001)TGL1,374$7.25$5.00$14.50$33.50$1.00$41.00$12.00
9Lime (com or QK)(slurry) or QK(dry) (260-7001)TON75$344.00$350.00$400.00$389.00$365.00$470.00$400.00
10Lime TRT (existing material)(8") (260-7007)SY7,561$2.35$5.00$3.82$4.75$7.70$7.25$10.00
11Cem TRT(PLNT MX)(CL M)(tya)(GR1-2)(12") (276-7209)SY6,956$44.45$65.00$55.46$52.00$65.00$54.00$75.00
12Prime coat (AE-P) (310-7001)GAL1,512$5.10$6.00$5.20$4.50$6.60$6.50$10.00
13PFC-C PG76-22 sac-A (342-7001)TON5,053$170.00$165.00$195.00$191.60$214.00$230.00$225.00
14Tack coat (342-7015)GAL7,245$2.75$3.00$2.96$4.65$3.10$3.75$4.00
15SP mixes SP-B PG64-22 (344-7001)TON3,775$115.00$110.00$114.20$122.80$116.00$140.00$150.00
16SP mixes SP-C PG70-22 (344-7019)TON9,962$135.00$110.00$124.60$142.50$141.00$150.00$160.00
17Tack coat (344-7077)GAL8,265$3.40$3.00$2.96$4.65$3.10$4.00$4.00
18Plane & text asphalt concrete pavement(1.5") (354-7018)SY50,241$1.75$2.00$1.99$1.50$1.90$1.50$3.00
19Planing asphalt concrete pavement(4") (354-7053)SY9,758$3.00$4.00$3.59$3.00$5.00$4.00$9.00
20Plane & text concrete pavement(1.5" - 4") (354-7100)SY2,534$2.50$4.00$4.00$4.50$8.00$3.50$9.00
21Class C concrete (miscellaneous) (420-7067)CY2$1,800.00$4,000.00$12,700$1,225.00$8,000.00$500.00$2,400.00
22Riprap (mow strip)(4 in) (432-7013)CY202.10$526.00$650.00$767.00$506.75$710.00$690.00$900.00
23Mobilization (500-7001)LS1$200,677$222,000$137,000$195,500$326,400$110,000$300,000
24Barricades, signs and traffic handling (502-7001)MO8$6,000.00$5,000.00$7,680.00$8,157.00$1,405.66$9,800.00$12,000
25Portable changeable message sign (503-7002)EACH2$7,000.00$9,000.00$4,460.00$7,235.00$19,800$2,400.00$10,000
26TMA (stationary) (505-7001)DAY98$200.00$250.00$400.00$230.00$13.00$260.00$350.00
27TMA (mobile operation) (505-7003)DAY12$250.00$500.00$850.00$626.00$660.00$660.00$350.00
28Rock filter dams (install) (type 2) (506-7002)LF160$50.00$40.00$39.00$42.00$48.00$45.00$60.00
29Rock filter dams (remove) (506-7011)LF160$12.20$12.00$11.00$12.00$12.00$13.00$15.00
30Temporary sediment control fence (install) (506-7039)LF2,740$3.60$4.50$3.60$4.00$4.20$4.25$4.50
31Temporary sediment control fence (remove) (506-7041)LF2,740$1.00$1.00$1.10$1.20$0.89$1.25$1.00
32Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005)LF2,430$40.00$30.00$70.30$74.50$46.00$24.00$75.00
33Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029)LF1,710$10.00$16.00$11.50$10.75$13.40$11.00$25.00
34Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053)LF2,430$18.00$17.00$11.00$10.50$12.80$8.50$22.00
35Driveways (concrete) (530-7006)SY86$100.00$150.00$187.00$101.00$135.00$180.00$200.00
36Driveways (ACP) (530-7010)SY1,361$55.00$35.00$33.00$28.00$37.00$22.00$35.00
37Mill rumble strips (asphalt) (shoulder) (533-7001)LF37,832$0.25$0.35$0.18$0.25$0.34$0.50$0.36
38Fill milled asphalt rumble strips (shoulder) (533-7005)LF12,190$2.50$3.50$1.70$0.30$3.00$2.50$12.50
39Metal W-beam guard fence (timber post) (540-7001)LF1,150$26.00$30.00$27.22$30.50$25.43$32.00$29.00
40Metal beam guard fence trans (thrie-beam) (540-7005)EACH4$2,255.00$2,500.00$2,921.00$2,350.00$1,964.65$2,800.00$3,100.00
41Downstream anchor terminal section (540-7015)EACH2$1,350.00$1,800.00$1,761.00$1,560.00$1,304.02$2,100.00$1,850.00
42Remove metal beam guard fence (542-7001)LF1,150$2.50$4.00$2.20$7.25$6.00$2.50$3.00
43Remove terminal anchor section (542-7002)EACH1$200.00$300.00$278.00$720.00$601.98$320.00$300.00
44Remove downstream anchor terminal (542-7003)EACH1$150.00$300.00$220.00$258.00$215.36$260.00$300.00
45Cable barrier system (install)(TL-4) (543-7002)LF3,660$11.00$30.00$22.50$21.50$30.00$28.00$22.00
46Cable barrier terminal sec (install)(TL-4) (543-7018)EACH6$1,800.00$5,000.00$3,611.00$5,381.00$5,000.00$6,900.00$5,500.00
47Guardrail end treatment (install) (544-7001)EACH2$3,155.00$3,500.00$3,722.00$4,500.00$3,737.58$4,300.00$3,950.00
48Guardrail end treatment (remove) (544-7003)EACH2$240.00$300.00$220.00$655.00$548.14$260.00$400.00
49Crash cushion attenuator (move & reset) (545-7002)EACH2$1,373.00$2,000.00$2,055.00$1,860.00$1,554.90$1,600.00$2,500.00
50Crash cushion attenuator (remove) (545-7004)EACH3$753.00$1,750.00$1,000.00$1,200.00$975.24$1,000.00$1,100.00
51Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH3$8,667.00$5,500.00$8,500.00$10,400$8,687.50$8,500.00$9,200.00
52Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH92$12.00$25.00$30.00$18.50$15.52$32.00$32.00
53Install delineator assembly (D-DW)SZ 1(BRF)GF2 (658-7048)EACH16$34.00$50.00$39.00$30.50$25.62$45.00$45.00
54Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF12,590$0.30$0.25$0.28$0.50$0.40$0.50$0.30
55Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF50,278$0.32$0.25$0.28$0.50$0.38$0.50$0.30
56Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF2,500$0.50$0.50$0.44$0.75$0.60$0.75$0.45
57Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF50,278$0.40$0.25$0.28$0.50$0.38$0.50$0.30
58Work zone pavement marking removing (reflectorized) type I-A (662-7047)EACH261$8.00$4.00$4.40$6.00$5.00$6.50$4.40
59Work zone pavement marking removing (reflectorized) type II-C-R (662-7053)EACH261$5.00$4.00$4.40$6.00$5.00$6.50$4.40
60Work zone pavement marking removing (traffic BTN) type W (662-7057)EACH778$2.80$2.00$2.20$5.00$4.00$5.25$2.20
61Work zone pavement marking removing (traffic BTN) type Y (662-7059)EACH778$2.00$2.00$2.20$5.00$4.00$5.25$2.20
62Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH3,770$1.40$1.50$1.50$1.00$1.00$0.50$3.50
63Reflectorized pavement marking type I (W)8"(DOT)(090MIL) (666-7017)LF530$1.00$1.00$2.00$1.25$1.00$1.25$5.00
64Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023)LF1,311$1.00$1.00$2.00$1.25$1.00$1.25$2.00
65Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035)LF36$7.00$10.00$10.00$15.00$13.00$17.00$20.00
66Reflectorized pavement marking type I (W)(arrow)(090MIL) (666-7041)EACH10$175.00$200.00$211.00$210.00$175.00$230.00$220.00
67Reflectorized pavement marking type I (W)(word)(090MIL) (666-7065)EACH10$200.00$200.00$211.00$210.00$176.00$230.00$225.00
68Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407)LF4,467$0.70$0.70$0.78$0.75$0.65$0.75$0.85
69Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410)LF17,869$0.55$0.70$0.78$0.75$0.59$0.75$0.80
70Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422)LF17,869$0.55$0.70$0.78$0.75$0.59$0.75$0.80
71Reflectorized pavement marker type II-C-R (672-7006)EACH133$4.00$6.00$7.00$6.00$5.00$6.50$7.00
72Eliminating existing PM & markers (4") (677-7001)LF7,740$0.40$0.50$0.44$0.75$0.65$0.75$0.45
73Pavement surface preparation for marking (6") (678-7002)LF3,044$0.10$0.10$0.03$0.30$0.25$0.25$0.05
TxDOT contract A00187526: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of August 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy