TxDOT contract A00195572 bid tabulation
Resurface Roadway, SH 36 (FM 2187 to FM 1094). Let by Texas DOT on April 4, 2025, Austin, Yoakum District. 7 bids received; low bid $4,364,003 by Texas Materials Group, Inc., -16% against the engineer's estimate of $5,169,190.
- Owner
- Texas DOT
- Letting
- 04 APR 2025
- Pay items
- 106
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Texas Materials Group, Inc. | $4,364,003 | Low | -16% |
| 2 | Cornerstone Paving and Construction, L.L.C. | $4,366,512 | 0.0% | -16% |
| 3 | Vulcan Materials Asphalt and Construction, LLC | $4,608,365 | +6.0% | -11% |
| 4 | Big Creek Construction, LTD. | $4,787,369 | +10% | -7.0% |
| 5 | Larry Young Paving, Inc. | $5,072,110 | +16% | -2.0% |
| 6 | Hunter Industries, LTD. | $5,203,425 | +19% | +1.0% |
| 7 | Brazos Paving, Inc. | $5,378,883 | +23% | +4.0% |
Engineer's estimate: $5,169,190.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Texas Materials Group, Inc. | 2. Cornerstone Paving and Construction, L.L.C. | 3. Vulcan Materials Asphalt and Construction, LLC | 4. Big Creek Construction, LTD. | 5. Larry Young Paving, Inc. | 6. Hunter Industries, LTD. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (pavement) (104-7001) | SY | 8,400 | $17.00 | $6.00 | $9.50 | $9.25 | $15.00 | $11.00 | $21.00 |
| 2 | Removing concrete (riprap) (104-7007) | CY | 30 | $25.00 | $300.00 | $38.00 | $173.00 | $200.00 | $68.00 | $192.50 |
| 3 | Removing concrete (curb & gutter) (104-7017) | LF | 100 | $5.00 | $40.00 | $10.00 | $31.00 | $50.00 | $13.00 | $14.00 |
| 4 | Excavation (roadway) (110-7001) | CY | 13,386 | $15.00 | $19.00 | $30.25 | $33.50 | $20.00 | $25.00 | $31.70 |
| 5 | Blading (150-7002) | HR | 10 | $120.00 | $68.00 | $90.00 | $127.50 | $200.00 | $180.00 | $108.00 |
| 6 | Block sodding (162-7002) | SY | 20 | $10.00 | $85.00 | $12.00 | $68.25 | $30.00 | $10.00 | $80.00 |
| 7 | FL BS (compacted in place)(type E GR 5)(final pos) (247-7196) | CY | 7,204 | $150.00 | $102.00 | $95.00 | $123.00 | $105.00 | $100.00 | $103.07 |
| 8 | Cement (275-7001) | TON | 492 | $300.00 | $220.00 | $230.00 | $215.00 | $225.00 | $280.00 | $247.50 |
| 9 | Cement TRT (existing material)(8") (275-7003) | SY | 16,210 | $3.10 | $1.90 | $1.60 | $2.60 | $2.25 | $5.00 | $3.60 |
| 10 | Cement TRT (existing material)(12") (275-7005) | SY | 16,210 | $5.10 | $1.90 | $1.80 | $3.90 | $2.50 | $5.75 | $4.32 |
| 11 | Prime coat (MC-30) (310-7004) | GAL | 6,484 | $5.50 | $5.00 | $5.00 | $4.60 | $5.00 | $6.00 | $5.24 |
| 12 | Aggregate (type-PE, GR-4)(sac-B) (316-7232) | CY | 451 | $175.00 | $245.00 | $166.00 | $185.00 | $175.00 | $220.00 | $156.04 |
| 13 | Asphalt (AC 20-5TR or AC-20XP or CRS-2P) (316-7264) | GAL | 19,866 | $4.75 | $4.60 | $4.80 | $3.27 | $4.00 | $4.50 | $4.47 |
| 14 | D-GR HMA type-B sac-B PG64-22 (341-7002) | TON | 12,270 | $125.00 | $107.00 | $108.00 | $100.00 | $115.00 | $120.00 | $119.00 |
| 15 | D-GR HMA type D sac-B PG70-22 (341-7050) | TON | 5,580 | $120.00 | $128.00 | $120.00 | $110.00 | $120.00 | $140.00 | $125.40 |
| 16 | Tack coat (341-7082) | GAL | 6,484 | $4.25 | $4.00 | $4.00 | $3.50 | $3.50 | $6.25 | $3.54 |
| 17 | Flexible pavement structure repair(8") (351-7007) | SY | 500 | $75.00 | $60.00 | $65.00 | $65.50 | $85.00 | $59.00 | $111.32 |
| 18 | Planing asphalt concrete pavement (1.5") (354-7074) | SY | 2,800 | $1.00 | $2.20 | $2.50 | $4.30 | $3.00 | $2.25 | $4.64 |
| 19 | Planing asphalt concrete pavement(3" to 6") (354-7086) | SY | 32,420 | $4.00 | $2.80 | $4.00 | $1.65 | $4.00 | $4.00 | $3.54 |
| 20 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 14 | $275.00 | $390.00 | $480.00 | $480.00 | $500.00 | $340.00 | $662.00 |
| 21 | Drilled shaft (traffic signal pole) (42 in) (416-7045) | LF | 18 | $350.00 | $430.00 | $587.00 | $587.00 | $600.00 | $380.00 | $846.00 |
| 22 | Riprap (mow strip)(4 in) (432-7013) | CY | 30.30 | $500.00 | $850.00 | $800.00 | $865.00 | $850.00 | $780.00 | $907.01 |
| 23 | Adjusting manholes (479-7001) | EACH | 2 | $2,500.00 | $1,500.00 | $4,000.00 | $1,500.00 | $2,500.00 | $800.00 | $3,545.03 |
| 24 | Mobilization (500-7001) | LS | 1 | $460,000 | $230,000 | $150,000 | $375,000 | $470,000 | $423,000 | $550,735 |
| 25 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $3,500.00 | $4,000.00 | $9,000.00 | $4,700.00 | $6,000.00 | $5,200.00 | $6,810.13 |
| 26 | Portable changeable message sign (503-7002) | EACH | 2 | $11,000 | $6,500.00 | $11,200 | $9,800.00 | $7,750.00 | $1,200.00 | $8,804.59 |
| 27 | TMA (stationary) (505-7001) | DAY | 20 | $300.00 | $390.00 | $125.00 | $336.00 | $500.00 | $210.00 | $324.75 |
| 28 | TMA (mobile operation) (505-7003) | DAY | 20 | $300.00 | $300.00 | $125.00 | $336.00 | $600.00 | $1,000.00 | $324.75 |
| 29 | Construction perimeter fence (506-7034) | LF | 50 | $2.50 | $25.00 | $50.00 | $30.00 | $7.00 | $5.25 | $15.00 |
| 30 | Sandbags for erosion control (506-7035) | EACH | 100 | $6.70 | $24.00 | $50.00 | $36.00 | $25.00 | $14.00 | $9.50 |
| 31 | Temporary sediment control fence (install) (506-7039) | LF | 100 | $5.00 | $8.00 | $6.00 | $15.00 | $5.00 | $5.50 | $8.00 |
| 32 | Temporary sediment control fence (remove) (506-7041) | LF | 100 | $1.50 | $2.00 | $2.00 | $11.00 | $2.00 | $1.50 | $2.00 |
| 33 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 50 | $7.00 | $12.00 | $12.00 | $30.00 | $7.00 | $2.75 | $11.50 |
| 34 | Biodegradable erosion control logs (remove) (506-7046) | LF | 50 | $2.00 | $4.00 | $3.00 | $29.00 | $2.00 | $1.00 | $4.00 |
| 35 | Concrete curb & gutter (type II) (529-7009) | LF | 100 | $18.00 | $65.00 | $40.00 | $100.00 | $60.00 | $120.00 | $80.81 |
| 36 | Metal W-beam guard fence (timber post) (540-7001) | LF | 264.50 | $26.00 | $29.00 | $29.00 | $29.00 | $35.00 | $37.00 | $29.75 |
| 37 | Metal W - beam guard fence (low fill culvert) (540-7018) | LF | 35.50 | $110.00 | $90.00 | $88.00 | $88.00 | $100.00 | $110.00 | $93.67 |
| 38 | Remove metal beam guard fence (542-7001) | LF | 300 | $3.00 | $2.50 | $3.00 | $3.00 | $3.00 | $3.75 | $2.76 |
| 39 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,200.00 | $3,300.00 | $3,450.00 | $3,450.00 | $3,500.00 | $4,500.00 | $3,471.31 |
| 40 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $250.00 | $200.00 | $250.00 | $250.00 | $500.00 | $320.00 | $275.50 |
| 41 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 133 | $18.00 | $16.00 | $16.00 | $16.00 | $16.00 | $11.00 | $18.60 |
| 42 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 400 | $20.00 | $24.00 | $18.65 | $18.65 | $20.00 | $19.00 | $29.12 |
| 43 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 152 | $30.00 | $19.00 | $20.50 | $20.50 | $21.00 | $15.00 | $50.00 |
| 44 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 84 | $35.00 | $28.00 | $34.00 | $33.15 | $35.00 | $23.00 | $55.42 |
| 45 | Electrical conductor (no.8) bare (620-7007) | LF | 745 | $2.00 | $2.75 | $1.70 | $1.70 | $2.00 | $2.50 | $1.90 |
| 46 | Electrical conductor (no.8) insulated (620-7008) | LF | 306 | $2.15 | $3.20 | $2.25 | $2.25 | $3.00 | $2.75 | $2.26 |
| 47 | Electrical conductor (no.6) bare (620-7009) | LF | 6 | $2.20 | $3.40 | $2.20 | $2.20 | $3.00 | $3.00 | $2.50 |
| 48 | Electrical conductor (no.6) insulated (620-7010) | LF | 12 | $2.30 | $3.80 | $2.75 | $2.75 | $3.00 | $3.25 | $2.90 |
| 49 | Ground box type D (162922)W/apron (624-7008) | EACH | 5 | $1,450.00 | $1,700.00 | $1,490.00 | $1,490.00 | $1,500.00 | $1,400.00 | $1,292.00 |
| 50 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 1 | $8,800.00 | $8,200.00 | $7,935.00 | $7,935.00 | $8,000.00 | $7,200.00 | $9,058.00 |
| 51 | Elc SRV type T 120/240 000(NS)GS(N)SP(O) (628-7326) | EACH | 2 | $5,000.00 | $6,000.00 | $6,075.00 | $6,075.00 | $7,000.00 | $5,000.00 | $8,259.00 |
| 52 | Aluminum signs (type A) (636-7001) | SF | 42.50 | $45.00 | $21.00 | $27.00 | $27.50 | $30.00 | $18.00 | $25.00 |
| 53 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 6 | $810.00 | $560.00 | $590.00 | $590.00 | $600.00 | $760.00 | $750.00 |
| 54 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 2 | $825.00 | $750.00 | $780.00 | $779.30 | $750.00 | $1,000.00 | $1,025.00 |
| 55 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 1 | $654.00 | $810.00 | $812.00 | $811.10 | $825.00 | $1,000.00 | $975.00 |
| 56 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 2 | $1,000.00 | $900.00 | $575.00 | $574.60 | $900.00 | $740.00 | $1,100.00 |
| 57 | Install small roadside sign support and assembly tytwt(1)UA(P) (644-7053) | EACH | 2 | $500.00 | $550.00 | $504.00 | $503.10 | $550.00 | $650.00 | $400.00 |
| 58 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 16 | $450.00 | $380.00 | $320.00 | $319.90 | $400.00 | $410.00 | $337.50 |
| 59 | Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058) | EACH | 1 | $525.00 | $430.00 | $372.00 | $371.60 | $450.00 | $480.00 | $450.00 |
| 60 | Remove SM RD SN sup&AM (644-7073) | EACH | 32 | $100.00 | $90.00 | $68.00 | $68.00 | $100.00 | $88.00 | $150.00 |
| 61 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 11 | $35.00 | $390.00 | $25.00 | $25.00 | $35.00 | $32.00 | $40.00 |
| 62 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 3,980 | $0.21 | $0.50 | $0.65 | $0.45 | $0.50 | $0.50 | $0.60 |
| 63 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 36 | $0.20 | $0.55 | $2.00 | $0.45 | $0.50 | $0.50 | $0.60 |
| 64 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 685 | $0.40 | $0.65 | $0.75 | $0.95 | $1.00 | $1.25 | $0.65 |
| 65 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 240 | $1.96 | $16.00 | $6.00 | $6.00 | $6.00 | $7.75 | $3.00 |
| 66 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 3,899 | $0.15 | $0.55 | $0.60 | $0.45 | $0.50 | $0.50 | $0.60 |
| 67 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 17,966 | $0.14 | $0.54 | $0.45 | $0.45 | $0.50 | $0.50 | $0.60 |
| 68 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 344 | $1.10 | $1.40 | $2.25 | $2.25 | $2.50 | $3.00 | $0.85 |
| 69 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 14,514 | $0.85 | $1.10 | $1.20 | $1.20 | $1.25 | $1.50 | $0.85 |
| 70 | Work zone pavement marking removing (W)8"(solid) (662-7072) | LF | 250 | $0.85 | $1.50 | $2.40 | $2.40 | $2.50 | $3.00 | $1.75 |
| 71 | Work zone pavement marking removing (Y)6"(broken) (662-7098) | LF | 588 | $0.85 | $1.40 | $2.25 | $2.25 | $2.50 | $3.00 | $0.85 |
| 72 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 32,326 | $0.85 | $1.10 | $1.20 | $1.20 | $1.25 | $1.50 | $0.85 |
| 73 | Work zone pavement marking removing (Y)24"(solid) (662-7105) | LF | 130 | $4.05 | $16.00 | $10.50 | $10.50 | $11.00 | $14.00 | $5.00 |
| 74 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 1,921 | $1.03 | $0.65 | $1.00 | $0.45 | $1.50 | $1.00 | $1.63 |
| 75 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 3,865 | $0.78 | $0.65 | $1.00 | $0.45 | $1.50 | $1.00 | $1.63 |
| 76 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 685 | $1.00 | $1.45 | $1.75 | $1.75 | $2.00 | $2.25 | $0.95 |
| 77 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 120 | $1.20 | $10.00 | $4.00 | $4.00 | $4.00 | $5.25 | $3.00 |
| 78 | Type I high perf PM (W)6"(broken)(100MIL) (666-7290) | LF | 3,980 | $0.90 | $1.20 | $0.75 | $0.75 | $0.80 | $1.00 | $0.90 |
| 79 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 36 | $0.90 | $1.30 | $0.75 | $0.75 | $0.80 | $1.00 | $0.90 |
| 80 | Type I high perf PM (Y)6"(broken)(100MIL) (666-7302) | LF | 3,980 | $0.90 | $1.20 | $0.75 | $0.75 | $0.80 | $1.00 | $0.90 |
| 81 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 17,986 | $0.90 | $1.30 | $0.75 | $0.75 | $0.80 | $1.00 | $0.90 |
| 82 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 341 | $15.00 | $21.00 | $20.10 | $20.10 | $21.00 | $26.00 | $9.00 |
| 83 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 6 | $250.00 | $500.00 | $310.00 | $308.52 | $310.00 | $400.00 | $200.00 |
| 84 | Prefabricated PM type C (W)(18")(yld tri) (668-7110) | EACH | 7 | $25.00 | $200.00 | $31.00 | $30.23 | $35.00 | $39.00 | $20.00 |
| 85 | Reflectorized pavement marker type I-C (672-7002) | EACH | 199 | $6.00 | $12.00 | $6.00 | $6.00 | $6.00 | $7.75 | $7.00 |
| 86 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 410 | $6.00 | $11.00 | $6.00 | $6.00 | $6.00 | $7.75 | $7.00 |
| 87 | Eliminating existing PM & markers (4") (677-7001) | LF | 248 | $1.00 | $1.00 | $0.72 | $0.72 | $1.00 | $1.00 | $0.50 |
| 88 | Eliminating existing PM & markers (6") (677-7002) | LF | 21,567 | $0.44 | $1.00 | $0.90 | $0.90 | $1.00 | $1.25 | $0.65 |
| 89 | Eliminating existing PM & markers (8") (677-7004) | LF | 600 | $1.00 | $1.50 | $1.00 | $1.30 | $1.50 | $1.75 | $0.60 |
| 90 | Eliminating existing PM & markers (24") (677-7008) | LF | 13 | $5.32 | $3.60 | $4.00 | $3.90 | $4.00 | $5.00 | $3.00 |
| 91 | Ins HY traffic signal (DPT sup CNT & cab)(iso) (680-7005) | EACH | 1 | $22,000 | $21,000 | $10,840 | $10,840 | $12,000 | $16,000 | $24,574 |
| 92 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 6 | $290.00 | $270.00 | $295.00 | $295.00 | $300.00 | $240.00 | $290.00 |
| 93 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 1 | $290.00 | $270.00 | $295.00 | $295.00 | $300.00 | $240.00 | $295.00 |
| 94 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 10 | $290.00 | $315.00 | $295.00 | $295.00 | $300.00 | $280.00 | $290.00 |
| 95 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 2 | $290.00 | $270.00 | $295.00 | $295.00 | $300.00 | $240.00 | $295.00 |
| 96 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 6 | $290.00 | $270.00 | $295.00 | $295.00 | $300.00 | $240.00 | $290.00 |
| 97 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 1 | $290.00 | $270.00 | $295.00 | $295.00 | $300.00 | $240.00 | $295.00 |
| 98 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 6 | $170.00 | $190.00 | $280.00 | $280.00 | $300.00 | $170.00 | $211.00 |
| 99 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 1 | $210.00 | $240.00 | $293.00 | $292.35 | $300.00 | $210.00 | $277.00 |
| 100 | Traffic signal CBL (type A)(14 AWG)(3 conductor) (684-7029) | LF | 48 | $2.50 | $3.70 | $1.75 | $1.75 | $2.00 | $3.25 | $1.85 |
| 101 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 490 | $2.85 | $4.80 | $2.10 | $2.10 | $2.50 | $4.25 | $2.30 |
| 102 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 152 | $3.50 | $6.30 | $2.80 | $2.80 | $3.00 | $5.50 | $2.76 |
| 103 | Install RDSD flash beacon assembly (685-7001) | EACH | 2 | $10,000 | $4,400.00 | $6,420.00 | $6,420.00 | $6,500.00 | $3,700.00 | $7,000.00 |
| 104 | Ins traffic signal PL AM(S)1 arm(36') (686-7037) | EACH | 1 | $10,000 | $22,000 | $15,885 | $15,885 | $16,000 | $19,000 | $15,207 |
| 105 | Ins traffic signal PL AM(S)2 arm(40-36')lum (686-7147) | EACH | 1 | $20,000 | $32,000 | $26,870 | $26,870 | $27,000 | $28,000 | $25,024 |
| 106 | RVDS (presence detection only) (6008-7001) | EACH | 3 | $8,500.00 | $13,000 | $9,635.00 | $9,635.00 | $10,000 | $12,000 | $8,641.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.