TxDOT contract A00213018 bid tabulation
MILL AND INLAY, IH0045 (SH 21 to OSR). Let by Texas DOT on June 4, 2025, Madison, Bryan District. 5 bids received; low bid $3,461,710 by Big Creek Construction, LTD., -15% against the engineer's estimate of $4,066,899.
- Owner
- Texas DOT
- Letting
- 04 JUN 2025
- Pay items
- 30
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Big Creek Construction, LTD. | $3,461,710 | Low | -15% |
| 2 | Knife River Corporation - South | $3,533,505 | +2.0% | -13% |
| 3 | Cornerstone Paving and Construction, L.L.C. | $4,240,098 | +22% | +4.0% |
| 4 | Vulcan Materials Asphalt and Construction, LLC | $4,327,984 | +25% | +6.0% |
| 5 | Texas Materials Group, Inc. | $4,865,240 | +41% | +20% |
Engineer's estimate: $4,066,899.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Big Creek Construction, LTD. | 2. Knife River Corporation - South | 3. Cornerstone Paving and Construction, L.L.C. | 4. Vulcan Materials Asphalt and Construction, LLC | 5. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Backfill (type B) (134-7002) | STA | 29 | $200.00 | $500.00 | $175.00 | $450.00 | $292.54 | $645.00 |
| 2 | PFC-C PG76-22 sac-A (342-7001) | TON | 10,222 | $180.00 | $170.00 | $161.75 | $184.50 | $173.83 | $211.00 |
| 3 | Tack coat (342-7015) | GAL | 17,587 | $6.00 | $3.00 | $4.00 | $3.50 | $4.18 | $4.00 |
| 4 | Tom-C PG76-22 sac-B (347-7002) | TON | 7,254 | $160.00 | $140.00 | $151.00 | $191.00 | $184.17 | $226.00 |
| 5 | Tack coat (347-7011) | GAL | 17,587 | $6.00 | $3.00 | $4.00 | $3.50 | $4.35 | $4.00 |
| 6 | Planing asphalt concrete pavement(2") (354-7051) | SY | 175,849 | $2.50 | $1.25 | $1.17 | $1.60 | $2.10 | $2.20 |
| 7 | Pavement JT underseal (24") (356-7021) | LF | 224 | $45.00 | $65.00 | $38.00 | $38.00 | $38.00 | $41.00 |
| 8 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 224 | $50.00 | $50.00 | $55.00 | $23.00 | $22.68 | $25.00 |
| 9 | Mobilization (500-7001) | LS | 1 | $50,000 | $55,000 | $104,000 | $280,000 | $398,210 | $241,446 |
| 10 | Barricades, signs and traffic handling (502-7001) | MO | 3 | $5,000.00 | $5,000.00 | $8,369.00 | $3,000.00 | $16,685 | $3,700.00 |
| 11 | Portable changeable message sign (503-7001) | DAY | 52 | $150.00 | $150.00 | $180.00 | $150.00 | $56.00 | $99.00 |
| 12 | TMA (stationary) (505-7001) | DAY | 20 | $400.00 | $300.00 | $500.00 | $125.00 | $257.68 | $395.00 |
| 13 | TMA (mobile operation) (505-7003) | DAY | 24 | $400.00 | $500.00 | $800.00 | $125.00 | $76.00 | $395.00 |
| 14 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 104,842 | $0.20 | $0.20 | $0.07 | $0.15 | $0.07 | $0.07 |
| 15 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 27,680 | $0.50 | $0.50 | $0.39 | $0.50 | $0.35 | $0.55 |
| 16 | Work zone pavement marking non-removing (W)6"(DOT) (662-7006) | LF | 848 | $0.50 | $1.00 | $0.39 | $1.00 | $0.92 | $1.00 |
| 17 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 109,358 | $0.50 | $0.35 | $0.39 | $0.35 | $0.35 | $0.38 |
| 18 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 4,400 | $1.00 | $1.00 | $0.69 | $1.00 | $0.60 | $1.00 |
| 19 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 109,366 | $0.50 | $0.35 | $0.39 | $0.35 | $0.35 | $0.38 |
| 20 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 9,904 | $2.00 | $1.50 | $1.50 | $1.00 | $0.88 | $1.00 |
| 21 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 424 | $2.00 | $2.00 | $1.26 | $2.00 | $2.50 | $2.15 |
| 22 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 2,200 | $2.50 | $1.50 | $1.58 | $1.30 | $1.10 | $1.40 |
| 23 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 300 | $3.00 | $5.00 | $4.20 | $5.00 | $3.75 | $2.85 |
| 24 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 13,840 | $0.75 | $0.80 | $0.74 | $0.80 | $0.66 | $0.85 |
| 25 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 58,608 | $0.75 | $0.70 | $0.76 | $0.65 | $0.66 | $0.70 |
| 26 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 58,608 | $0.75 | $0.70 | $0.76 | $0.65 | $0.66 | $0.70 |
| 27 | Prefabricated PM type C (W)(number) (668-7102) | EACH | 6 | $300.00 | $150.00 | $300.00 | $150.00 | $250.00 | $161.00 |
| 28 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 832 | $5.00 | $6.00 | $7.00 | $5.50 | $7.00 | $6.00 |
| 29 | Eliminating existing PM & markers (4") (677-7001) | LF | 7,850 | $1.00 | $0.75 | $1.00 | $0.50 | $1.00 | $0.55 |
| 30 | TMSP radar speed control monitor (6025-7001) | EACH | 1 | $10,000 | $5,000.00 | $3,000.00 | $12,000 | $3,600.00 | $3,100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.