TxDOT contract A00209350 bid tabulation
Surfacing/Roadway Restoration, IH 10 (SL 8 East to Monmouth Road). Let by Texas DOT on June 4, 2025, Harris, Houston District. 5 bids received; low bid $3,413,667 by Texas Materials Group, Inc., -19% against the engineer's estimate of $4,205,030.
- Owner
- Texas DOT
- Letting
- 04 JUN 2025
- Pay items
- 50
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Texas Materials Group, Inc. | $3,413,667 | Low | -19% |
| 2 | Cornerstone Paving and Construction, L.L.C. | $3,734,804 | +9.0% | -11% |
| 3 | Vulcan Materials Asphalt and Construction, LLC | $3,957,487 | +16% | -6.0% |
| 4 | Durwood Greene Construction Co. | $4,279,730 | +25% | +2.0% |
| 5 | Forde Construction Company, Inc. | $4,333,593 | +27% | +3.0% |
Engineer's estimate: $4,205,030.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Texas Materials Group, Inc. | 2. Cornerstone Paving and Construction, L.L.C. | 3. Vulcan Materials Asphalt and Construction, LLC | 4. Durwood Greene Construction Co. | 5. Forde Construction Company, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Aggregate (type-PB or PL, GR-4)(sac-B) (316-7245) | CY | 620 | $193.00 | $328.00 | $222.00 | $203.00 | $197.00 | $446.00 |
| 2 | Asphalt (multi option) (316-7263) | GAL | 33,390 | $8.00 | $3.00 | $4.75 | $3.40 | $4.25 | $4.50 |
| 3 | D-GR HMA type D PG70-22 (level-UP) (341-7051) | TON | 574 | $352.00 | $300.00 | $121.15 | $135.00 | $137.00 | $175.00 |
| 4 | D-GR HMA type D sac-A PG76-22 (341-7057) | TON | 5,969 | $228.00 | $303.00 | $133.00 | $139.50 | $167.00 | $175.00 |
| 5 | Tack coat (341-7082) | GAL | 574 | $4.00 | $4.00 | $5.00 | $5.35 | $3.50 | $4.50 |
| 6 | Plan & text concrete pavement(0" to 2") (354-7027) | SY | 267 | $12.00 | $65.00 | $20.00 | $24.75 | $95.00 | $59.00 |
| 7 | Planing asphalt concrete pavement(2") (354-7051) | SY | 5,216 | $7.00 | $15.00 | $1.50 | $4.30 | $5.00 | $5.00 |
| 8 | Full - depth repair CRCP (8") (361-7003) | CY | 1,099 | $1,400.00 | $150.00 | $1,900.00 | $1,950.00 | $2,050.00 | $1,980.00 |
| 9 | Mobilization (500-7001) | LS | 1 | $382,275 | $400,000 | $280,000 | $375,800 | $380,000 | $380,000 |
| 10 | Barricades, signs and traffic handling (502-7001) | MO | 4 | $17,228 | $85,000 | $5,000.00 | $31,000 | $10,000 | $2,200.00 |
| 11 | Portable changeable message sign (503-7001) | DAY | 220 | $214.00 | $100.00 | $125.00 | $56.00 | $250.00 | $150.00 |
| 12 | TMA (stationary) (505-7001) | DAY | 120 | $316.00 | $67.00 | $125.00 | $336.00 | $250.00 | $250.00 |
| 13 | TMA (mobile operation) (505-7003) | DAY | 10 | $286.00 | $405.00 | $125.00 | $336.00 | $225.00 | $250.00 |
| 14 | Concrete curb (dowel) (529-7014) | LF | 515 | $96.00 | $44.00 | $140.00 | $40.00 | $100.00 | $50.00 |
| 15 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 2,556 | $8.00 | $0.85 | $1.00 | $1.50 | $3.50 | $2.00 |
| 16 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 274 | $1.00 | $3.50 | $3.00 | $3.00 | $4.00 | $3.20 |
| 17 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 612 | $2.00 | $1.15 | $1.00 | $1.00 | $1.50 | $1.05 |
| 18 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 1,402 | $9.00 | $6.75 | $6.00 | $6.00 | $10.00 | $6.35 |
| 19 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 2 | $246.00 | $169.00 | $150.00 | $150.00 | $175.00 | $159.00 |
| 20 | Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051) | EACH | 3 | $235.00 | $225.00 | $200.00 | $200.00 | $250.00 | $210.00 |
| 21 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 4 | $248.00 | $225.00 | $200.00 | $200.00 | $250.00 | $210.00 |
| 22 | Reflectorized pavement marking type I(W)(entr gore)(100MIL) (666-7069) | EACH | 5 | $759.00 | $562.00 | $500.00 | $500.00 | $600.00 | $530.00 |
| 23 | Reflectorized pavement marking type I(W)(exit gore)(100MIL) (666-7072) | EACH | 4 | $790.00 | $562.00 | $500.00 | $500.00 | $600.00 | $530.00 |
| 24 | Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114) | LF | 1,765 | $2.50 | $1.00 | $1.00 | $1.00 | $1.25 | $1.05 |
| 25 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 1,007 | $3.00 | $3.40 | $3.00 | $3.00 | $4.00 | $3.20 |
| 26 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 5,370 | $0.50 | $0.40 | $0.35 | $0.35 | $0.37 | $0.40 |
| 27 | Reflectorized pavement marking type II (W) 6" (DOT) (666-7173) | LF | 274 | $0.40 | $0.65 | $0.55 | $0.55 | $0.60 | $0.60 |
| 28 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 1,791 | $0.50 | $0.40 | $0.35 | $0.35 | $0.37 | $0.40 |
| 29 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 612 | $0.60 | $0.75 | $0.65 | $0.65 | $0.70 | $0.70 |
| 30 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 1,402 | $2.00 | $4.50 | $4.00 | $4.00 | $5.00 | $4.25 |
| 31 | Reflectorized pavement marking type II (W) (arrow) (666-7186) | EACH | 2 | $102.00 | $95.00 | $85.00 | $85.00 | $95.00 | $90.00 |
| 32 | Reflectorized pavement marking type II (W) (uturn arrow) (666-7189) | EACH | 3 | $102.00 | $140.00 | $125.00 | $125.00 | $135.00 | $133.00 |
| 33 | Reflectorized pavement marking type II (W) (word) (666-7194) | EACH | 4 | $100.00 | $115.00 | $100.00 | $100.00 | $135.00 | $106.00 |
| 34 | Reflectorized pavement marking type II (W) (entr gore) (666-7195) | EACH | 5 | $460.00 | $225.00 | $200.00 | $200.00 | $300.00 | $212.00 |
| 35 | Reflectorized pavement marking type II (W) (exit gore) (666-7196) | EACH | 4 | $473.00 | $335.00 | $300.00 | $300.00 | $400.00 | $318.00 |
| 36 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 7,135 | $0.50 | $1.40 | $0.35 | $0.35 | $0.37 | $0.40 |
| 37 | Reflectorized pavement marking type II (Y) 8" (solid) (666-7214) | LF | 1,765 | $0.60 | $0.75 | $0.65 | $0.65 | $0.70 | $0.70 |
| 38 | Reflectorized pavement marking type II (Y) 12" (solid) (666-7215) | LF | 1,007 | $2.00 | $2.25 | $2.00 | $2.00 | $3.00 | $2.15 |
| 39 | Pavement sler 6" (666-7347) | LF | 220 | $0.60 | $0.15 | $0.12 | $0.12 | $0.12 | $0.15 |
| 40 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 5,370 | $1.00 | $1.00 | $0.80 | $0.80 | $0.85 | $0.85 |
| 41 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 1,791 | $0.80 | $1.00 | $0.80 | $0.80 | $0.85 | $0.85 |
| 42 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 7,135 | $0.80 | $1.00 | $0.80 | $0.80 | $0.85 | $0.85 |
| 43 | Reflectorized pavement marker type I-A (672-7001) | EACH | 73 | $8.00 | $6.75 | $6.00 | $6.00 | $6.00 | $6.35 |
| 44 | Reflectorized pavement marker type I-C (672-7002) | EACH | 22 | $8.00 | $6.75 | $6.00 | $6.00 | $6.00 | $6.35 |
| 45 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 345 | $7.00 | $6.75 | $6.00 | $6.00 | $6.00 | $6.35 |
| 46 | Eliminating existing PM & markers (6") (677-7002) | LF | 220 | $0.60 | $0.55 | $0.50 | $0.50 | $0.50 | $0.55 |
| 47 | Pavement surface preparation for marking (6") (678-7002) | LF | 220 | $0.20 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 48 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 2 | $54.00 | $3.50 | $3.15 | $3.15 | $4.00 | $3.35 |
| 49 | Pavement surface preparation for marking (uturn arr) (678-7012) | EACH | 3 | $25.00 | $4.25 | $11.31 | $3.77 | $5.00 | $4.00 |
| 50 | Pavement surface preparation for marking (word) (678-7016) | EACH | 4 | $62.00 | $3.50 | $12.60 | $3.15 | $4.00 | $3.35 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.