TxDOT contract A00130696 bid tabulation

Surfacing/Roadway Restoration, FS 149 (FM 1488 to FM 149). Let by Texas DOT on March 5, 2025, Montgomery, Houston District. 6 bids received; low bid $1,063,539 by Vulcan Materials Asphalt and Construction, LLC, -33% against the engineer's estimate of $1,594,147.

Owner
Texas DOT
Letting
05 MAR 2025
Pay items
54
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Vulcan Materials Asphalt and Construction, LLC$1,063,539Low-33%
2Durwood Greene Construction Co.$1,090,280+3.0%-32%
3Cornerstone Paving and Construction, L.L.C.$1,210,855+14%-24%
4Forde Construction Company, Inc.$1,296,259+22%-19%
5Environmental Allies, Inc.$1,478,215+39%-7.0%
6Texas Materials Group, Inc.$3,007,362+183%+89%
TxDOT contract A00130696: bids by rank

Engineer's estimate: $1,594,147.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Vulcan Materials Asphalt and Construction, LLC2. Durwood Greene Construction Co.3. Cornerstone Paving and Construction, L.L.C.4. Forde Construction Company, Inc.5. Environmental Allies, Inc.6. Texas Materials Group, Inc.
1Backfill (type A) (134-7001)STA73$300.00$264.00$235.00$527.00$375.00$750.00$444.12
2SP mixes SP-D sac-A PG70-22 (344-7052)TON2,670$175.00$136.75$165.00$157.50$137.00$155.00$377.41
3Flexible pavement structure repair(10") (351-7009)SY2,670$130.00$73.00$65.00$85.00$120.00$105.00$217.70
4Planing asphalt concrete pavement(2") (354-7051)SY28,969$5.00$2.25$2.50$3.50$5.00$6.00$16.63
5Mobilization (500-7001)LS1$134,078$106,000$90,000$100,000$125,000$125,000$215,709
6Barricades, signs and traffic handling (502-7001)MO3$7,000.00$15,630$7,000.00$10,000$1,500.00$1,500.00$1,753.31
7Portable changeable message sign (503-7001)DAY80$150.00$81.00$300.00$100.00$130.00$115.00$399.03
8TMA (stationary) (505-7001)DAY27$380.00$271.00$300.00$125.00$170.00$275.00$580.41
9TMA (mobile operation) (505-7002)HR112$100.00$32.00$70.00$15.00$25.00$150.00$164.60
10Intersections (ACP) (530-7002)SY703$55.00$26.00$25.00$30.50$53.00$65.00$83.77
11Driveways (ACP) (530-7010)SY1,564$95.00$63.00$27.00$45.30$82.00$65.00$36.44
12Turnouts (ACP) (530-7018)SY165$124.00$62.00$140.00$35.00$48.00$105.00$139.60
13Mill rumble strips (asphalt) (centerline) (533-7002)LF35,829$1.40$0.08$0.28$0.10$0.15$1.00$0.25
14Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH4$864.00$743.94$720.00$715.00$680.00$800.00$1,729.13
15Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH3$955.00$753.04$750.00$735.00$742.00$815.00$1,777.49
16Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH1$1,100.00$1,086.60$1,100.00$1,105.00$1,140.00$1,250.00$2,672.28
17Remove SM RD SN sup&AM (644-7073)EACH8$46.00$130.00$150.00$135.00$110.00$145.00$326.48
18Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF1,149$0.65$0.34$0.38$0.35$0.35$0.75$0.85
19Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF42,486$0.70$0.34$0.38$0.35$0.35$0.55$0.85
20Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF2,673$1.00$0.76$1.00$0.35$0.80$0.80$1.33
21Work zone pavement marking non-removing (W)12"(solid) (662-7015)LF300$3.70$2.75$3.00$1.88$2.85$2.50$4.55
22Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF225$4.00$5.50$6.00$3.80$5.70$4.50$918.98
23Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH21$100.00$85.00$110.00$100.00$129.00$115.00$241.84
24Work zone pavement marking non-removing (W)(double arrow) (662-7019)EACH3$146.00$125.00$170.00$135.00$129.00$150.00$326.48
25Work zone pavement marking non-removing (W)(RR crossing) (662-7024)EACH3$330.00$255.00$275.00$200.00$263.00$275.00$483.67
26Work zone pavement marking non-removing(W)(word) (662-7030)EACH21$130.00$125.00$140.00$105.00$129.00$175.00$253.93
27Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF3,414$0.66$0.34$0.38$0.35$0.35$0.60$0.85
28Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF34,302$0.62$0.34$0.38$0.35$0.35$0.65$0.85
29Work zone pavement marking removing (reflectorized) type II-A-A (662-7051)EACH867$7.00$6.00$4.20$3.88$6.20$6.00$9.38
30Work zone pavement marking removing (reflectorized) type II-C-R (662-7053)EACH207$6.00$6.00$4.20$3.88$6.20$5.00$9.38
31Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF891$1.50$1.75$1.10$1.25$1.80$1.85$3.02
32Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF100$5.50$3.75$5.00$3.99$3.90$5.00$9.65
33Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF75$9.00$8.00$10.00$7.25$8.25$9.00$17.53
34Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265)LF14,162$1.75$0.98$1.00$0.90$1.00$1.75$2.18
35Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269)LF1,575$2.00$0.98$1.00$0.90$1.00$2.00$2.18
36Reflectorized profile pavement marking type I(Y)6"(broken)(090MIL) (666-7273)LF394$1.10$0.98$3.50$3.00$1.00$5.00$7.26
37All-wther PM type I (W)6"(broken)(100MIL) (666-7310)LF383$1.00$2.75$4.50$4.00$2.85$6.00$9.67
38All-wther PM type I (Y)6"(solid)(100MIL) (666-7315)LF9,859$1.00$0.86$1.25$1.05$0.90$1.50$2.54
39All-wther PM type I (Y)6"(broken)(100MIL) (666-7316)LF744$1.50$2.75$4.50$4.00$2.85$5.75$9.67
40Prefabricated PM type C (W)(arrow) (668-7091)EACH7$284.00$308.53$255.00$235.00$318.00$300.00$568.31
41Prefabricated PM type C (W)(double arrow) (668-7093)EACH1$388.00$436.66$300.00$265.00$450.00$500.00$640.87
42Prefabricated PM type C (W)(word) (668-7103)EACH7$344.00$376.96$270.00$245.00$389.00$375.00$592.50
43Prefabricated PM type C (W)(RR crossing) (668-7108)EACH1$700.00$684.48$950.00$750.00$706.00$1,000.00$1,813.77
44Reflectorized pavement marker type I-C (672-7002)EACH69$1.00$6.00$7.00$6.36$6.20$7.15$15.38
45Reflectorized pavement marker type II-A-A (672-7004)EACH289$9.00$6.00$7.00$6.36$6.20$8.00$15.38
46Pavement surface preparation for marking (6") (678-7002)LF27,117$0.10$0.03$0.20$0.15$0.03$0.75$0.36
47Pavement surface preparation for marking (8") (678-7004)LF891$1.00$0.04$0.30$0.25$0.04$1.00$0.60
48Pavement surface preparation for marking (12") (678-7006)LF100$1.50$0.06$0.65$0.60$0.06$1.00$1.45
49Pavement surface preparation for marking (24") (678-7008)LF75$0.70$0.12$1.50$1.25$0.12$2.00$3.02
50Pavement surface preparation for marking (arrow) (678-7009)EACH7$13.00$5.00$55.00$50.00$5.15$60.00$120.92
51Pavement surface preparation for marking (double arrow) (678-7010)EACH1$49.00$5.00$65.00$60.00$5.15$100.00$145.11
52Pavement surface preparation for marking (word) (678-7016)EACH7$12.00$5.00$55.00$50.00$5.15$75.00$120.92
53Pavement surface preparation for marking (RR crossing) (678-7020)EACH1$90.00$5.00$110.00$100.00$5.15$200.00$241.83
54Underseal course (3006-7001)GAL5,340$6.00$5.40$7.00$16.30$3.50$6.00$7.71
TxDOT contract A00130696: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of March 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way