TxDOT contract A00125659 bid tabulation
Surfacing/Roadway Restoration, SH 159 (FAYETTE C/L to FM 109). Let by Texas DOT on August 7, 2025, Austin, Yoakum District. 6 bids received; low bid $12,637,640 by Big Creek Construction, LTD., -7.4% against the engineer's estimate of $13,648,001.
- Owner
- Texas DOT
- Letting
- 07 AUG 2025
- Pay items
- 131
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Big Creek Construction, LTD. | $12,637,640 | Low | -7.0% |
| 2 | Hunter Industries, LTD. | $13,558,937 | +7.0% | -1.0% |
| 3 | Texas Materials Group, Inc. | $13,852,263 | +10% | +1.0% |
| 4 | Knife River Corporation - South | $13,953,570 | +10% | +2.0% |
| 5 | MBN Enterprises LLC | $15,770,778 | +25% | +16% |
| 6 | Vulcan Materials Asphalt and Construction, LLC | $18,692,731 | +48% | +37% |
Engineer's estimate: $13,648,001.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Big Creek Construction, LTD. | 2. Hunter Industries, LTD. | 3. Texas Materials Group, Inc. | 4. Knife River Corporation - South | 5. MBN Enterprises LLC | 6. Vulcan Materials Asphalt and Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 61 | $3,000.00 | $1,000.00 | $1,286.30 | $2,000.00 | $250.00 | $3,000.00 | $300.00 |
| 2 | Preparation row (tree remove) (36"-48" diameter) (100-7006) | EACH | 1 | $2,600.00 | $3,500.00 | $5,060.00 | $3,000.00 | $2,700.00 | $5,000.00 | $2,700.00 |
| 3 | Removing concrete (riprap) (104-7006) | SY | 60 | $25.00 | $40.00 | $31.50 | $20.00 | $18.00 | $50.00 | $20.00 |
| 4 | Removing concrete (driveways) (104-7011) | SY | 287 | $22.00 | $30.00 | $38.50 | $32.00 | $13.50 | $25.00 | $35.00 |
| 5 | Excavation (roadway) (110-7001) | CY | 7,566 | $17.00 | $15.00 | $24.90 | $23.00 | $12.00 | $18.00 | $30.00 |
| 6 | Embankment (final)(OC)(type C) (132-7005) | CY | 38,214 | $16.00 | $25.00 | $25.20 | $31.70 | $27.00 | $17.00 | $40.00 |
| 7 | Blading (150-7002) | HR | 50 | $85.00 | $120.00 | $108.00 | $100.00 | $150.00 | $250.00 | $139.00 |
| 8 | Broadcast seed (temporary_warm) (164-7005) | SY | 10,000 | $0.25 | $0.25 | $0.31 | $0.20 | $0.20 | $1.00 | $0.20 |
| 9 | Broadcast seed (temporary_cool) (164-7006) | SY | 10,000 | $0.25 | $0.25 | $0.31 | $0.20 | $0.20 | $1.00 | $0.20 |
| 10 | Drill seed (permanent_rural_sand) (164-7009) | SY | 75,833 | $0.30 | $0.25 | $0.33 | $0.25 | $0.25 | $0.60 | $0.25 |
| 11 | Drill seed (temporary_warm) (164-7013) | SY | 18,958 | $0.25 | $0.25 | $0.31 | $0.20 | $0.20 | $0.60 | $0.20 |
| 12 | Drill seed (temporary_cool) (164-7014) | SY | 18,958 | $0.25 | $0.25 | $0.31 | $0.20 | $0.20 | $0.60 | $0.20 |
| 13 | Vegetative watering (168-7001) | TGL | 852.34 | $25.00 | $15.00 | $24.50 | $30.00 | $15.00 | $85.00 | $47.50 |
| 14 | FL BS (compacted in place)(tye GR1-2)(final pos) (247-7193) | CY | 23,924 | $85.00 | $90.00 | $88.62 | $106.00 | $88.00 | $86.00 | $125.00 |
| 15 | FL BS (roadway del) (type E GR 1-2) (in vehicle) (247-7235) | CY | 18,610 | $70.00 | $65.00 | $84.84 | $37.00 | $83.00 | $88.00 | $125.00 |
| 16 | Lime (com or QK)(slurry) or QK(dry) (260-7001) | TON | 987 | $300.00 | $335.00 | $341.00 | $335.00 | $340.00 | $360.00 | $305.00 |
| 17 | Lime TRT (subgrade) (8") (260-7020) | SY | 59,255 | $3.50 | $4.00 | $3.12 | $4.50 | $2.25 | $4.50 | $7.00 |
| 18 | Cement (275-7001) | TON | 1,441 | $250.00 | $225.00 | $209.00 | $206.00 | $215.00 | $360.00 | $185.00 |
| 19 | Cement TRT (existing material & new base)(8") (275-7007) | SY | 117,713 | $4.00 | $2.50 | $2.40 | $2.60 | $1.00 | $4.50 | $3.00 |
| 20 | Cement TRT (subgrade) (8") (275-7018) | SY | 11,975 | $3.50 | $3.50 | $2.40 | $1.70 | $1.50 | $4.50 | $6.00 |
| 21 | Asphalt (RC-250) (316-7016) | GAL | 20,525 | $5.00 | $4.50 | $5.24 | $4.90 | $4.80 | $6.00 | $3.86 |
| 22 | Aggregate (type-E, GR-5)(sac-B) (316-7194) | CY | 734 | $120.00 | $125.00 | $99.32 | $155.00 | $176.00 | $90.00 | $163.00 |
| 23 | Aggregate (type-PE, GR-3)(sac-B) (316-7229) | CY | 1,359 | $120.00 | $140.00 | $124.38 | $158.00 | $215.00 | $90.00 | $177.00 |
| 24 | Aggregate (type-PE, GR-4)(sac-B) (316-7232) | CY | 789 | $125.00 | $150.00 | $130.93 | $184.00 | $205.00 | $90.00 | $151.00 |
| 25 | Asphalt (AC 20-5TR or AC-20XP or CRS-2P) (316-7264) | GAL | 81,101 | $4.00 | $4.00 | $4.30 | $4.30 | $4.65 | $5.75 | $3.26 |
| 26 | D-GR HMA type-B PG64-22 (341-7001) | TON | 7,412 | $110.00 | $105.00 | $102.65 | $121.00 | $118.00 | $190.00 | $124.00 |
| 27 | D-GR HMA type D sac-B PG70-22 (341-7050) | TON | 1,416 | $115.00 | $125.00 | $115.50 | $136.00 | $125.00 | $190.00 | $134.00 |
| 28 | Tack coat (341-7082) | GAL | 1,348 | $5.00 | $4.00 | $3.38 | $4.30 | $4.25 | $6.00 | $3.00 |
| 29 | Cut & restoring pavement (400-7006) | SY | 943 | $125.00 | $100.00 | $110.00 | $160.00 | $66.00 | $125.00 | $225.00 |
| 30 | Cut and restore pavement (flex base) (400-7009) | SY | 114 | $100.00 | $100.00 | $110.00 | $108.00 | $50.00 | $300.00 | $85.00 |
| 31 | Cem stabil BKFL (400-7010) | CY | 1,492 | $190.00 | $150.00 | $216.00 | $200.00 | $145.00 | $100.00 | $200.00 |
| 32 | Trench excavation protection (402-7001) | LF | 536 | $20.00 | $15.00 | $10.80 | $43.00 | $38.00 | $15.00 | $12.00 |
| 33 | Temporary special shoring (403-7001) | SF | 3,694 | $35.00 | $35.00 | $23.76 | $1.00 | $35.00 | $45.00 | $45.00 |
| 34 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 30 | $300.00 | $300.00 | $225.44 | $370.00 | $225.00 | $300.00 | $225.44 |
| 35 | Riprap (concrete)(5 in) (432-7002) | CY | 83.40 | $575.00 | $750.00 | $626.40 | $730.00 | $1,155.00 | $750.00 | $850.00 |
| 36 | Riprap (concrete)(CL B) (432-7005) | CY | 1.05 | $95.00 | $1,500.00 | $1,000.00 | $2,300.00 | $1,700.00 | $750.00 | $850.00 |
| 37 | Riprap (stone protection)(12 in) (432-7041) | CY | 5 | $240.00 | $350.00 | $324.00 | $450.00 | $625.00 | $500.00 | $150.00 |
| 38 | Riprap (stone protection)(18 in) (432-7043) | CY | 213 | $210.00 | $200.00 | $280.80 | $190.00 | $210.00 | $450.00 | $225.00 |
| 39 | Concrete box culvert (3 FT X 2 FT) (462-7001) | LF | 12 | $450.00 | $750.00 | $410.40 | $740.00 | $3,500.00 | $550.00 | $550.00 |
| 40 | Concrete box culvert (3 FT X 3 FT) (462-7002) | LF | 447.50 | $510.00 | $400.00 | $453.60 | $470.00 | $500.00 | $560.00 | $595.00 |
| 41 | Concrete box culvert (5 FT X 3 FT) (462-7007) | LF | 67 | $700.00 | $500.00 | $604.80 | $680.00 | $630.00 | $675.00 | $755.00 |
| 42 | Concrete box culvert (6 FT X 4 FT) (462-7012) | LF | 71 | $1,100.00 | $600.00 | $702.00 | $890.00 | $820.00 | $900.00 | $1,000.00 |
| 43 | Concrete box culvert (8 FT X 5 FT) (462-7022) | LF | 77 | $1,550.00 | $750.00 | $918.01 | $1,200.00 | $1,125.00 | $1,100.00 | $1,250.00 |
| 44 | Concrete box culvert (8 FT X 6 FT) (462-7023) | LF | 174 | $1,180.00 | $800.00 | $972.01 | $1,100.00 | $1,250.00 | $1,100.00 | $1,400.00 |
| 45 | Concrete box culvert (8 FT X 8 FT) (462-7025) | LF | 330 | $1,600.00 | $850.00 | $1,134.01 | $1,250.00 | $1,230.00 | $1,300.00 | $1,800.00 |
| 46 | Concrete box culvert (10 FT X 6 FT) (462-7034) | LF | 152 | $2,200.00 | $1,000.00 | $1,533.61 | $1,550.00 | $1,705.00 | $1,600.00 | $1,985.00 |
| 47 | Concrete box culvert (10 FT X 10 FT) (462-7038) | LF | 136 | $2,500.00 | $1,400.00 | $1,933.21 | $1,800.00 | $2,580.00 | $2,200.00 | $2,850.00 |
| 48 | Concrete box culvert (5 FT X 6.5 FT) (462-7111) | LF | 86 | $650.00 | $700.00 | $799.21 | $940.00 | $2,100.00 | $1,800.00 | $1,200.00 |
| 49 | RC pipe (CL III)(12 in) (464-7001) | LF | 35 | $90.00 | $80.00 | $71.28 | $225.00 | $90.00 | $85.00 | $50.00 |
| 50 | RC pipe (CL III)(15 in) (464-7002) | LF | 173 | $100.00 | $85.00 | $75.60 | $175.00 | $81.00 | $95.00 | $55.00 |
| 51 | RC pipe (CL III)(18 in) (464-7003) | LF | 206 | $110.00 | $100.00 | $91.80 | $155.00 | $77.00 | $100.00 | $65.00 |
| 52 | RC pipe (CL III)(24 in) (464-7005) | LF | 93 | $135.00 | $150.00 | $113.40 | $250.00 | $102.00 | $110.00 | $165.00 |
| 53 | RC pipe (CL III)(30 in) (464-7007) | LF | 8 | $190.00 | $200.00 | $129.60 | $290.00 | $162.00 | $150.00 | $300.00 |
| 54 | RC pipe (CL III)(36 in) (464-7009) | LF | 562 | $250.00 | $225.00 | $190.08 | $235.00 | $205.00 | $200.00 | $265.00 |
| 55 | Junction box(complete)(PJB)(4FTX4FT) (465-7006) | EACH | 1 | $10,400 | $6,500.00 | $17,820 | $6,700.00 | $6,200.00 | $8,000.00 | $7,500.00 |
| 56 | Wingwall (FW - 0) (HW=11 FT) (466-7153) | EACH | 1 | $50,000 | $40,000 | $62,640 | $47,000 | $37,500 | $30,000 | $32,000 |
| 57 | Wingwall (PW - 1) (HW=5 FT) (466-7175) | EACH | 1 | $18,000 | $12,000 | $29,160 | $12,000 | $29,000 | $20,000 | $8,500.00 |
| 58 | Wingwall (PW - 1) (HW=6 FT) (466-7176) | EACH | 2 | $30,000 | $17,500 | $30,780 | $18,000 | $31,000 | $30,000 | $13,000 |
| 59 | Wingwall (PW - 1) (HW=7 FT) (466-7177) | EACH | 2 | $30,000 | $25,000 | $33,696 | $22,000 | $34,000 | $35,000 | $17,000 |
| 60 | Wingwall (PW - 1) (HW=8 FT) (466-7178) | EACH | 3 | $40,000 | $30,000 | $37,800 | $25,000 | $35,500 | $40,000 | $30,000 |
| 61 | Wingwall (PW - 1) (HW=9 FT) (466-7179) | EACH | 4 | $45,000 | $50,000 | $39,960 | $47,000 | $47,750 | $50,000 | $48,500 |
| 62 | Wingwall (PW - 1) (HW=12 FT) (466-7182) | EACH | 1 | $50,000 | $65,000 | $60,480 | $62,000 | $56,000 | $60,000 | $50,000 |
| 63 | Set (type I)(S= 3 FT)(HW= 3 FT)(6:1)(P) (467-7043) | EACH | 4 | $6,000.00 | $7,500.00 | $12,960 | $8,000.00 | $17,000 | $7,000.00 | $10,000 |
| 64 | Set (type I)(S= 3 FT)(HW= 4 FT)(3:1)(C) (467-7044) | EACH | 6 | $9,750.00 | $8,500.00 | $15,768 | $13,000 | $17,000 | $10,000 | $9,500.00 |
| 65 | Set (type I)(S= 5 FT)(HW= 4 FT)(3:1)(C) (467-7099) | EACH | 2 | $11,500 | $9,000.00 | $17,820 | $13,000 | $17,500 | $12,000 | $10,500 |
| 66 | Set (type I)(S= 6 FT)(HW= 7 FT)(3:1)(C) (467-7140) | EACH | 2 | $12,500 | $5,000.00 | $23,868 | $16,000 | $24,000 | $15,000 | $19,000 |
| 67 | Set (type I)(S= 8 FT)(HW= 6 FT)(3:1)(C) (467-7187) | EACH | 1 | $17,000 | $15,000 | $2,872.82 | $19,000 | $26,000 | $18,000 | $25,000 |
| 68 | Set (type I)(S= 8 FT)(HW= 7 FT)(3:1)(C) (467-7191) | EACH | 3 | $18,000 | $8,500.00 | $31,320 | $14,000 | $26,000 | $18,000 | $28,000 |
| 69 | Set (type I)(S= 10 FT)(HW= 7 FT)(3:1)(C) (467-7234) | EACH | 2 | $21,000 | $25,000 | $39,960 | $32,000 | $29,000 | $25,000 | $32,000 |
| 70 | Set (type II) (12 in) (RCP) (6: 1) (P) (467-7292) | EACH | 8 | $1,300.00 | $1,000.00 | $1,857.61 | $2,200.00 | $1,300.00 | $1,000.00 | $800.00 |
| 71 | Set (type II) (15 in) (RCP) (6: 1) (P) (467-7300) | EACH | 14 | $1,550.00 | $1,250.00 | $2,138.41 | $2,300.00 | $1,750.00 | $1,500.00 | $900.00 |
| 72 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 19 | $2,200.00 | $1,500.00 | $2,538.02 | $2,900.00 | $2,175.00 | $1,700.00 | $1,000.00 |
| 73 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 1 | $2,350.00 | $1,600.00 | $2,592.02 | $3,200.00 | $2,160.00 | $2,000.00 | $1,500.00 |
| 74 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 12 | $2,200.00 | $2,000.00 | $2,808.02 | $3,200.00 | $2,840.00 | $2,200.00 | $2,500.00 |
| 75 | Set (type II) (30 in) (RCP) (3: 1) (C) (467-7345) | EACH | 1 | $3,500.00 | $2,100.00 | $3,510.02 | $4,500.00 | $3,700.00 | $2,200.00 | $3,000.00 |
| 76 | Set (type II) (36 in) (RCP) (3: 1) (C) (467-7365) | EACH | 15 | $4,400.00 | $4,500.00 | $3,834.02 | $5,835.00 | $5,000.00 | $4,800.00 | $4,500.00 |
| 77 | Removing structure (small) (496-7036) | EACH | 33 | $1,100.00 | $3,500.00 | $810.01 | $7,000.00 | $4,000.00 | $1,500.00 | $6,000.00 |
| 78 | Mobilization (500-7001) | LS | 1 | $1,100,000 | $1,100,000 | $1,129,989 | $945,000 | $674,580 | $1,500,000 | $1,869,000 |
| 79 | Barricades, signs and traffic handling (502-7001) | MO | 10 | $6,500.00 | $7,000.00 | $4,520.93 | $5,000.00 | $50,000 | $8,000.00 | $57,000 |
| 80 | Portable changeable message sign (503-7002) | EACH | 4 | $10,250 | $12,500 | $7,500.00 | $7,000.00 | $2,000.00 | $15,000 | $18,200 |
| 81 | TMA (stationary) (505-7001) | DAY | 30 | $350.00 | $500.00 | $350.00 | $750.00 | $600.00 | $220.00 | $166.00 |
| 82 | TMA (mobile operation) (505-7003) | DAY | 30 | $400.00 | $750.00 | $750.00 | $750.00 | $1,000.00 | $320.00 | $166.00 |
| 83 | Rock filter dams (install) (type 1) (506-7001) | LF | 280 | $50.00 | $35.00 | $46.10 | $35.00 | $35.00 | $45.00 | $35.00 |
| 84 | Rock filter dams (install) (type 1) (506-7006) | CY | 100 | $70.00 | $50.00 | $143.43 | $50.00 | $50.00 | $45.00 | $50.00 |
| 85 | Rock filter dams (remove) (506-7011) | LF | 280 | $10.00 | $12.00 | $10.25 | $10.00 | $10.00 | $10.00 | $10.00 |
| 86 | Sandbags for erosion control (506-7035) | EACH | 100 | $10.00 | $30.00 | $12.29 | $30.00 | $30.00 | $15.00 | $30.00 |
| 87 | Temporary sediment control fence (install) (506-7039) | LF | 2,875 | $6.00 | $5.00 | $3.89 | $4.00 | $3.75 | $5.00 | $3.75 |
| 88 | Temporary sediment control fence (remove) (506-7041) | LF | 2,875 | $1.50 | $1.00 | $1.02 | $1.00 | $1.00 | $2.00 | $1.00 |
| 89 | PCTB (fur&inst)(F-shape or SNGL SLP)type 1 (512-7089) | LF | 2,160 | $55.00 | $50.00 | $40.00 | $33.00 | $20.00 | $78.00 | $80.00 |
| 90 | PCTB (remove)(F-shape or SNGL SLP)type 1 (512-7092) | LF | 2,160 | $30.00 | $25.00 | $15.00 | $33.00 | $9.00 | $15.00 | $100.00 |
| 91 | Concrete curb & gutter (type II) (529-7009) | LF | 300 | $65.00 | $85.00 | $30.00 | $43.00 | $60.00 | $25.00 | $80.00 |
| 92 | Driveways (concrete) (530-7006) | SY | 308 | $160.00 | $135.00 | $120.00 | $111.00 | $160.00 | $110.00 | $225.00 |
| 93 | Driveways (surface treat) (530-7016) | SY | 5,436 | $45.00 | $30.00 | $36.80 | $54.00 | $50.00 | $33.00 | $71.00 |
| 94 | Metal W-beam guard fence (timber post) (540-7001) | LF | 2,099.82 | $29.00 | $30.00 | $30.13 | $31.00 | $24.50 | $40.00 | $28.35 |
| 95 | Metal W - beam guard fence (low fill culvert) (540-7018) | LF | 150.18 | $110.00 | $100.00 | $98.64 | $95.00 | $95.00 | $110.00 | $92.80 |
| 96 | Guardrail end treatment (install) (544-7001) | EACH | 16 | $3,400.00 | $3,200.00 | $3,438.63 | $3,400.00 | $3,085.00 | $4,500.00 | $3,235.00 |
| 97 | Crash cushion attenuator (remove) (545-7004) | EACH | 12 | $1,200.00 | $1,500.00 | $871.62 | $720.00 | $485.00 | $3,500.00 | $820.00 |
| 98 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 12 | $8,500.00 | $7,500.00 | $8,365.39 | $7,700.00 | $6,500.00 | $12,000 | $7,870.00 |
| 99 | Wire fence (type A) (552-7001) | LF | 171 | $16.00 | $25.00 | $34.01 | $35.00 | $15.00 | $10.00 | $32.00 |
| 100 | Mailbox install-M (TWG-post) type 1 (560-7001) | EACH | 2 | $400.00 | $700.00 | $425.00 | $720.00 | $655.00 | $650.00 | $710.00 |
| 101 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 13 | $250.00 | $260.00 | $150.00 | $14.25 | $255.00 | $400.00 | $180.00 |
| 102 | Mailbox install-D (WC-post) type 3 (560-7005) | EACH | 5 | $300.00 | $325.00 | $175.00 | $240.00 | $315.00 | $400.00 | $230.00 |
| 103 | In RD IL (type SA) 50T-10 (400W EQ) LED (610-7198) | EACH | 3 | $5,500.00 | $7,000.00 | $6,436.50 | $10,000 | $6,450.00 | $9,000.00 | $6,436.50 |
| 104 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 512 | $20.00 | $17.00 | $16.07 | $13.00 | $16.00 | $25.00 | $16.07 |
| 105 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 40 | $30.00 | $25.00 | $24.11 | $24.00 | $24.50 | $30.00 | $24.11 |
| 106 | Electrical conductor (no.8) bare (620-7007) | LF | 552 | $3.50 | $3.00 | $2.40 | $2.70 | $2.40 | $3.50 | $2.40 |
| 107 | Electrical conductor (no.8) insulated (620-7008) | LF | 1,134 | $3.00 | $3.00 | $2.84 | $2.70 | $2.85 | $3.50 | $2.84 |
| 108 | Ground box type A (122311)W/apron (624-7002) | EACH | 2 | $1,900.00 | $1,500.00 | $1,247.85 | $2,000.00 | $1,248.00 | $1,600.00 | $1,247.85 |
| 109 | Elc SRV type A 120/240 060(NS)SS(E)SP(O) (628-7009) | EACH | 1 | $8,000.00 | $8,000.00 | $7,568.27 | $11,000 | $7,570.00 | $10,000 | $7,568.27 |
| 110 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 6 | $725.00 | $700.00 | $650.00 | $760.00 | $635.00 | $600.00 | $750.00 |
| 111 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 8 | $825.00 | $800.00 | $700.00 | $850.00 | $700.00 | $700.00 | $845.00 |
| 112 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 3 | $1,000.00 | $1,000.00 | $900.00 | $1,150.00 | $950.00 | $1,000.00 | $1,105.00 |
| 113 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 6 | $1,100.00 | $1,200.00 | $1,000.00 | $1,300.00 | $1,150.00 | $1,100.00 | $1,285.00 |
| 114 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 48 | $500.00 | $400.00 | $475.00 | $500.00 | $355.00 | $500.00 | $500.00 |
| 115 | Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058) | EACH | 6 | $520.00 | $500.00 | $525.00 | $650.00 | $455.00 | $600.00 | $650.00 |
| 116 | Remove SM RD SN sup&AM (644-7073) | EACH | 77 | $90.00 | $95.00 | $100.00 | $100.00 | $95.00 | $120.00 | $95.00 |
| 117 | Install delineator assembly (D-SW)SZ 2(WC)GND(BI) (658-7010) | EACH | 17 | $55.00 | $90.00 | $60.00 | $100.00 | $85.00 | $120.00 | $65.00 |
| 118 | Install object marker assembly (OM-2Y)(WC)GND(BI) (658-7057) | EACH | 50 | $75.00 | $90.00 | $65.00 | $70.00 | $85.00 | $165.00 | $67.00 |
| 119 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 68,957 | $0.55 | $0.30 | $0.24 | $0.26 | $0.25 | $0.80 | $0.29 |
| 120 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 256 | $2.00 | $5.00 | $4.00 | $4.20 | $4.00 | $10.00 | $5.00 |
| 121 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 6,116 | $0.60 | $0.30 | $0.33 | $0.35 | $0.35 | $1.00 | $0.29 |
| 122 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 122,497 | $0.60 | $0.30 | $0.33 | $0.35 | $0.33 | $0.80 | $0.29 |
| 123 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 7,960 | $2.00 | $1.50 | $1.63 | $1.00 | $1.00 | $1.30 | $0.75 |
| 124 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 44,417 | $1.00 | $0.80 | $1.15 | $1.25 | $1.15 | $1.80 | $0.75 |
| 125 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 35,007 | $1.00 | $0.80 | $1.15 | $1.25 | $1.15 | $1.80 | $0.75 |
| 126 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 2,039 | $1.00 | $0.80 | $1.15 | $1.25 | $1.15 | $2.00 | $0.75 |
| 127 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 4,663 | $0.85 | $1.00 | $0.90 | $0.95 | $0.90 | $8.00 | $0.90 |
| 128 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 4,518 | $0.85 | $1.00 | $0.90 | $0.95 | $0.90 | $7.00 | $0.90 |
| 129 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 70 | $16.00 | $15.00 | $25.00 | $26.50 | $25.00 | $50.00 | $15.00 |
| 130 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 596 | $5.50 | $7.00 | $7.00 | $7.50 | $7.00 | $10.00 | $6.26 |
| 131 | TMSP radar speed control monitor (6025-7001) | EACH | 2 | $12,000 | $5,000.00 | $8,500.00 | $8,000.00 | $12,000 | $12,000 | $9,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 7, 2025. Compiled by Mirage Metrics.